Loading…
Loading…
1,471 results • Best match
Laying of CC Road from 19-7-155 to 168 and UGD 19-8-82 to 85 and Construction of bridge at 19-7-258/1 Div. No. 50 of RMC
Construction of RUB in lieu of LC No: BP 11(East Anandbagh) at Railway Km 17/5-6 between Ammuguda - Moulali (Now in Medchal-Malkajgiri District). Sub-Work:- Construction of storm water drainage arrangement for Construction of RUB in Lieu of LC No: BP 11 (East Anandbagh) at Railway Km 17/5-6 between Ammuguda - Moulali Stations and Km 0/8-10 on Uttamnagar to ZTC road in RR District. (Now in Medchal-Malkajgiri District).
Comprehensive Maintenance Contract (CMC) for Rice Lake make Lorry weigh bridges which are working at various sites at various areas of SCCL for a period of 3 years.
Providing Bridges to Un connected ST habitations from Kotalpally to Rajamma thanda in Dharpally Mandal of Nizamabad Rural Constituency in Nizamabad District (Sub-work:Conducting Pre survey and drawings )
Construction of storm water drains from Agarthala to chintal, from ROB at chintal to Shivanagar upto the disposal point at Railway station and other routes under CM Assurance in Greater Warangal Municipal Corporation
Dismantling of affected properties under Road Widening for proposed ROB Cherlapally ,from HPCL To C-Met Junction ,BSNL to Cal-on Instruments both sides of the Road at Cherlapally ,Kapra Circle-1,GHMC
Construction of New BG line between Bhadrachalam road and Sathupalli Station for ROB No.7 on Thallada-Bhadrachalam SH-12 at Km 38/0-2 in Bhadradri Kothagudem District. Sub Work:-Providing RSI
Repairs and maintenance of road and storm water drains to avoid water stagnation by engaging men & machinery and material from L Nagar to Malakpet ROB for the year 2018-19 in Corridor-I
Manufacture, fabrication, supply, delivery, lowering, laying, jointing, testing and commissioning of 300mm dia MS and 600mm dia MS carrier pipe for the tunnel portion at ROB by pipe line tunneling work through pipe jacking or any specialized ... at ROB , ...
Laying of CC road along railway track from 17-3-192/17 to RUB Talab katta at Hafeez Nagar in 31-Rein Bazar in Santosh nagar Circle-7, SZ, GHMC (VDCC Work) (5th Recall)
Estimate for maintenance of Central median from NAC east gate to Hitech city RUB in Circle-21, SLPZ, GHMC during the year 2021-22 for a period of (9) months w.e.f.:01.07.2021 to 31.03.2021
laying of cc road from urjitha apts to surya nagar rub and internal lanes at krupa anand apts in anandbagh in malkajgiri division no. 140 of ghmc, malkajgiri circle-28(Reserved for SC only)
Remodeling of 600 mm dia. NP2 pipeline and restoration of CC from RUB Yakuthpura to Major Nala in Chota Chandra Nagar in 31-Rein bazar, Santosh Nagar, Circle-7, CRZ, GHMC. Rs. 23.85 Lakhs
Laying of Footpath with chequered tiles from RUB Talabkatta to H.No:18-7-425/86/1/A near Talabkatta Railway Track in 34-Talabchanchalam in Santhosh nagar Circle-7, CRZ, GHMC RS. 4.80 Lakhs
NABARD XXI-Construction of Bridge Cum Check dam on R/F Madanpally to Keshapur of Makloor Mandal of Armoor assembly constituency in Nizamabad District(Balance work) Est Cost Rs:305.00/ 20.00 lakhs
Attending Desilting work by Engaging Manual labour under Culverts and Bridges of Balakpur nala in Ahmednagar-74, Ward-10, Circle-12, KZ, GHMC.(10th Re-call) (Item No.01)
Balance work of Providing RCC Bridges for crossing the canal to carry 600mm dia & 400mm dia DI K9 pumping mains in Galipalli (village) and Vanthadupula (village) under Siddipet Municipality
Re-construction of High Level Bridges at Km 0/6-8 and 1/2-4 on Pedhamberpet to meet Nagarjuna Sagar Road in Ranga Reddy District under FDR Scheme.
Cleaning and clearing of Musi River by removing Julieflora, shrubs, carting of debris and painting to bridges along Musi River course from Himayath Sagar to Chaderghat under flood restoration.
Replacement of damaged platform frame-work of existing 60T lorry weigh-bridges (2No.s) with new frame-work at CHP, OCP-III, RG-II area, Godavarikhani, Dist. Peddapalli, Telangana State.
Monthly Basis Cab & Taxi Hiring Services - Hatchback; 1500 Km per month round the clock 24 x 7 vehicles required at ADEN/Bridges Secunderabad Total 01 Vehicle; Outstation 24*7
Hyderabad Division: 1) Replacement of old distribution panels in Central Hospital, Lallaguda with advanced switch gear for safety and reliability 2) Extension of AT Supply to the 30% Lighting Circuit of FOB, COP & SS Rooms over the division.
Construction of 2 No of FOB at Km 267. 6 to 8 and 273.0 to 2 on Mahbubnagar Jadcherla section of NH 167 in the State Of Telangana under Road Safety Annual Plan 2022 23 on EPC mode
Development of nurserys at Industrial area-1, ROB siddipet road and beside LIC office, Railway quators, irrigation office and ZP high school,Darmakancha in Jangaon municipality under Green budget for the year 2022-23.
Construction of ROB No.2 UB on New BG line between Bhadrachalam road and Sathupally Station in Km 2/2-4 of Sarvaram - Koyyagudem road in Bhadradri Kothagudem District. Sub Work:- Conducting Pre-Survey.
Laying of 250/450mm dia DI (K9) water supply pipe line as GHMC providing ROB from Darbar Maisamma Temple main road to Chandrayangutta main road under Jahanuma section,SD-III of O&M Dn.II
Construction of ROB in liu of L.C.No.5KK/E at Railway Km 21/1-2 of Dornakal-Badrachalam road section Km. 33/0-2 Khammam-Yellandu road in Khammam District. Sub Work:- Preliminary Survey
ER to Over Bridge (ROB) Hand Rails and Plastering to Stair case on NH-63 from Km 168/360 to 169/380 Nizamabad to Jagadalpur road in Mancherial District for the Year 2019-20
Construction of Four lane ROB in lieu of L.C.No. 191 at Railway km 456/5-6 of Manmad - secunderabad section and at km 10/4-6 of Nizamabad Bye pass road in Nizamabad Distrct
C/o HLB at Km 0/65 on R/f Sakinaveedu to Buchireddypalem via Rajuladevarapadu of Yerrupalem Mandal, Khammam District
C/o Bridge at 0/300 Km on R/f Chintagurthy to Suryathanda via Korlabodu thanda, Ramkya thanda, Vankudoth thanda of Raghunadhapalem Mandal, Khammam District
SC-KZJ Section: Proposed ancillary works such as improvements to drainage arrangements, cover over to approach roads and etc. for RUB No. 439A (LC No. 51) at Km. 310/20-22 between GNP-NSKL stations.
Strengthening of BT road at bad reaches on either side of the RUB Yakuthpura in 31-Rein Bazar, Santosh Nagar Circle-7, CRZ, GHMC in view of Ganesh Festival 2019(HMP Work) Rs. 7.46 Lakhs
Regrading of existing approaches - Construction of RUB in lieu of LC No. 81 at the Railway Km. 437/13-15 of Kazipet - Vijayawada section in Km.0/4 of Mahabubabad - Marripeda Road in Mahabubabad District
Laying of CC Road from Bonagiri Ramulu House, Aggri Ramulu House and Kummari Shankar House in Ward No.14 ( Old Laying of CC Road at RUB Exit, Hamaliwada) Mancherial Municipality under MGF ( Reserved for SC)
Annual Desilting of Strom water drains (Open Major Nala) by Mechanical means from Dabeerpura Bridge to RUB Yakutpura for the year 2025 in 30-Dabeerpura division of Circle -7 in CRZ,GHMC Rs. 25.20 Lakhs
Laying of RCC 450 mm Dia Pipeline at Malakpet RUB and Laying of RCC 450 mm Dia Pipeline at Malakpet T-Junction in MCH Colony, Ward-92, Moosarambagh, Circle-29, CRZ, GHMC. (Rs. 8 Lakhs)
Estimate for Consultancy services for conducting Preliminary Survey for Construction of ROB on L.C.No.18/JB on Nizamabad Bodhan section of Hyderabad -Medak-Bodhan road at km 182/8-10 in Nizamabad District.(2nd call)
Construction of ROB in lieu of LC.No.90 at Railway Km.460/6-8 of Kazipet - Vijayawada Section and at Km.14/2-4 of Satyanarayanapuram - Dornakal Road in Mahabubabad District ( Sub -Work: Pre Survay )
Periodical Renewals to Madhira-Tutikuntla road from Km 0/0 to Km 0/370 and Madhira town limits road from Km 0/0 to Km 0/380 and approaches of ROB Madhira in Khammam District
Construction of Four (4) Lane ROB at Madhava Nagar in lieu of L.C.No.193 at Railway Km.465/5-6 of Manmad - Secunderabad line at Km.10/0 of Dichpally -Nizamabad Road in Nizamabad District.
Construction of ROB in liu of L.C.No.2KK/E at Railway Km 16/15-16 of Dornakal-Badrachalam road section Km. 9/6-8 of Yellandu-Dornakal road in Khammam District. Sub Work:- Preliminary Survey
Construction of ROB in lieu of LC. No.39 at km. 292/22-24 of Kazipet -Ballarsha section on Peddapally-Kalvasrirampur road at Km 1/2 in Karimnagar district(Now in Peddapally District). (2nd Call)
Construction of 2-Lane ROB in Lieu of LC No 32 at Railway Km 56/4-5 of Pagidipalli-Nadikudi section and at Road Km 1/0-2 on Narketpally-Munugode Road in Nalgonda District
SC Division: 1. Improvement of reliability for OHE/PSI infrastructure in SC Division 2. Provision of Earth filling & stone pitching for OHE foundation near bridges /culverts/curves over SC Division.
Cleaning and clearing of Musi River by removing Juliflora, shrubs and debris along River course from Osmansagar to Bapughat and painting to bridges all along river course under flood restoration.
Emergency repairs to Vent Clearance work of culverts, Bridges, and causeways to R and B Roads in Gadwal section package -I for the year 2025-26 in Jogulamba Gadwal District
Emergency repairs to providing Clearance work at culverts, Bridges, and causeways on RnB Roads in RnB section Gattu, Gadwal sub division in Jogulamba Gadwal District for the year 2025-26
AMC for Apple make 60T Lorry Weigh Bridges available at OCP3 CHP (2 Nos.) and OC3 Phase-II CHP (1 No.) at RG2 Area for a period of 12 months
Hyderabad Division: Pumping out of rainwater accumulated at vulnerable Road Under Bridges (RUBs) during water logging conditions (under DEN/South Jurisdiction of SC-DHNE,GWD-RC and KSN-DKC Sections)