Loading…
Loading…
1,258 results • Best match
Renovation of 02 No. Type-II Quarter Beside Police Out Post Restcamp (near filler bed) under Sub Division No.II, NACD, APWD, Mayabunder.SW-Renovation of Toilet at O.P Badam Nallah under Sub Division No.III, Swadeshnagar.
Upkeep and maintenance of Raj Niwas Sub work - Construction of cross drainage to channelize the storm water to rain water tank and pond
Construction of culverts and cross drainage wherever necessary in rural road from NH-4 to Shanti Basti under SD-V, CD-I, Rangat.
Provision of Drainage system of CGAE Campbell Bay land along the Boundary wall at INS BAAZ, CGDHQ-10 (Consultancy Service ) at Campbell Bay
PROVN OF RAIN PROOF PARKING SHED, DRAINAGE SYSTEM AND CULVERT ALONG THE ROAD AT INS BAAZ CAMPBELL BAY UNDER GE(I) CAMPBELL BAY
Re-construction of damaged portion of drain opposite to postel colony at Shadipur.
A/R M/O Water Supply under Sub Division No.II, NACD, APWD, Mayabunder during 2025-26.SW-Replacement of Old G.I Pipe at Bamboo Nallah village under Pahalgoan Panchyat Sub Division No.II, NACD, APWD, Mayabunder.
Extension of 65mm dia pipe line from Anganwadi Line Dera to Gandhi Nallah Road Manjeri for a length of 626 mtr In lieu of laying of GI Pipeline from Soniya Nagar OHT to Vivekananda Colony
A/R M/O water supply under Sub-Division No. II, Tugapur , NACD, APWD, Mayabunder during 2023-24. S.W.- Planning of Reservoir and weir at suitable location in the Birsa Nallah including total station survey.
Laying of pipeline from main line to Ex-Pradhan house near Primary School Humfrygunj for a length of 380 mtr in lieu of construction of 02 nos weir at Upstream of Vasundhara Nallah at Humfrygunj
CLEANING AND REPAIRS OF DRAINS OF AIRFIELD, PERIODICAL SERVICES TO CERTAIN BLDGS AND REPAIR TO ROOF SHEET, PAINTING OF ROOF AT INS BAAZ UNDER GE(I) CAMPBELL BAY
Construction of Gabion Walls, RCC Retaining walls, RCC Drains, Slop Formations etc to check the severe land sliding in the backside of STS Workshop building at Lucknow, Mayabunder
Construction of Gabion Walls, RCC Retaining walls, RCC Drains, Slop Formations etc to check the severe land sliding in the backside of STS Workshop building at Lucknow, Mayabunder
Construction of 14 nos septic tank for GPA including provision for sanitary and CC drains at various location under Haddo section SD-IV, SVPND, APWD, Sri Vijaya Puram
Construction of non road side drain from Mr. Sayyed Ahmed house to existing drain at Dollygunj under CD-II, APWD, Prothrapur.
construction of 15mtr drain adjoining to orchidarium to
A/R M/O Rural Road under Sub-Division No.II, NACD, APWD, Mayabunder.SW-Construction of Retaining wall for sliding portion of road at Tugapur No.8 near Birsa Nallah under Sub-Division No.II, NACD, APWD, Mayabunder
AR and MO Rural Road under SD-III during 2023-24. SW - Construction of RCC retaining wall opposite Murugan Temple on rural road from NH-4 to Khara Nallah village for protection of road from sliding.
Construction of check weir of 10.00 Mtr length 1.70 Mtr height and Nallah both side protection wall of 2.50 Mtr length at Katai Basti Perennial Source at Swaraj Dweep under CD-I, A.P.W.D., Sri Vijaya Puram
Repair and Maintenance of Rural Road with metalling and Carpeting from ATR (NH4) near the house to late Phonibhushan Roy up to Govt Nallah near Harinagar Quarry of Jaipur a ward No 02 under GP Harinagar
Improvement of drainage system, chain linked fencing and fabrication of shed for Qtr No. Ty-IV/JG-53 at Junglighat under PBND, Port Blair
CERTAIN REPAIRS TO SEWAGE LINES, COMPOUND WALL, AREA DRAINAGE AT NAVY PARK, JCDA, MO AND OTHER MINOR UNITS UNDER GE HADDO, SRI VIJAYA PURAM.
MISC REPAIRS TO COMPOUND WALL, GATE/ GRILL/ GRATING AND CHAIN LINK FENCING, DRAINS AT NAVAL WHARF AND VIJAY BAUGH UNDER AGE B/R-II AT GE HADDO, PORT BLAIR
Construction of RCC roadside drains and strengthening of shoulders wherever required at Mannarghat from Indoor Stadium to Forest Nursery on SH-10 under Mannarghat Sub Division, RCD, Wimberly Gunj
PERIODICAL CUTTING OF GRASS, BUSHES AND CLEANING OF VEGETATION ALONG DRAINS FROM RUNWAY EARTHEN SHOULDERS, DISPERSAL AND ITS SURROUNDINGS RUNWAY AREA AND ITS REMOVAL AT INS UTKROSH, PORT BLAIR
Renovation of CC Drain with cover slab from Govt. Quarter to existing drain at Diglipur ward No. 05 under Gram Panchayat, Diglipur.
Drain at behind K Selvam house near Andabar cold storage removed encroachment in drain by Lemon Tree hotel in Ward No 9
Construction of CC drain , CC toe wall cum drain and culvert wherever necessary on the road side from ATR to Lall Pahad Road.Balance Work Sub Work Construction of Toe wall for a length of 90.00mtr, Toe wall cum drain for a length of 90.00mtr, CC
Providing and Supplying drinking water through FHTC at Bamboo Nallah village under Sub Division No.II, NACD, APWD, Mayabunder in lieu of Improvement of water supply distribution system of Restcamp area under Sub Division No.II, NACD, APWD, Mayabunder
Construction of Counterford/Gabbion/Retaining Wall wherever necessary under Sub Division No. III, NACD, APWD, Mayabunder. Sw- C/o 80m long protection against erosion at Korang Nallah under Sub Division No. III, NACD, APWD, Mayabunder (Consultancy ser
Construction of 02 Nos. of classroom (single storied) with toilet including IEI at GPS Bamboo Nallah-II under Sub Division No.II, NACD, APWD, Mayabunder.SW-Providing and fixing Inauguration Board and Face lifting of Multipurpose Hall at Mayabunder
Construction of CC drain (Balance portion) i/c repair of existing drain from Cargo Complex to Air Force Gate at Helipad Port Blair.
Unbranded Flexible Drain Hoses for Wash Basins/ Sinks Threaded, Unbranded Flexible Drain Hoses for Wash Basins/ Sinks Threaded PVC 32 mm 1.5 meter
Renovation cum Reconstruction of drain and covering slab over drain from Shri. Sitaram house to Shri. Duryodan house at Haddo Ward No. 02
Construction of approach road, drainage and other miscellaneous works and maintenance works at Pocket No.3 of NTRO Complex at Bambooflat under RCD, Wimberly Gunj.
CONSTRUCTION OF AREA DRAINAGE AT CERTAIN LOCATION AT AIR FORCE STATION CARNICOBAR AND PROVISION OF EXHAUST FANS AT CERTAIN LOCATION AT AIR FORCE STATION CARNICOBAR.
Repair of footpath drainage system and construction of PCC wall from Barkat Ali s House to Suman s House at Shadipur in Ward No 11
Repair and Maintenance of Community Hall including Pipe Connection, Drainage, Roofing Painting of Grills and Electrification at Tushnabad Ward No. 03 under Gram Panchayat Tushnabad.
Repair of old drainage and Septic Tank along side Quarters located at Qtr No.PL/56 to PL/76 under PL-II Section, SD-II, PBSD.
Construction of Gabion Walls, RCC Retaining walls, RCC Drains, Slop Formations etc to check the severe land sliding in the backside of STS Workshop building at Lucknow, Mayabunder.SW- Balance work
SW-Imp. of rural road from Dasarathpur Anganwadi to Shiv Temple Sabari for a length of 632.00 mtrs with road side shoulder and toe wall for a length of 201.00 mtrs.
Improvement and Replacement of G.I. Pipeline at Pareshnagar - I and II under, NACD, APWD, Mayabunder.SW-Supplying, Installation, Testing and Commissioning of 02 Nos. water pump sets one each at Korang Nallah and Shantipur under Sub- Division No. - IV
Improvement and Replacement of G.I. Pipeline at Pareshnagar - I and II under, NACD, APWD, Mayabunder.SW-Supplying, Installation, Testing and Commissioning of 02 Nos. water pump sets one each at Korang Nallah and Shantipur under Sub- Division No. - IV
Construction of RCC Bridge at CFO Nallah in place of existing Steel Type Bailey Bridge under Sub - Division No. - III, N.A.C.D, A.P.W.D, Mayabunder.SW-Expression of Interest (EOI) for consultancy service, for Preparation of DPR, BID Documents for Bri
A/R M/O District Road under SD-I, NACD, APWD, Mayabunder during 2024-25.SW-Construction RCC drains for a length of 120m at RHS of District Road wherever required.
REPAIR AND CLEANING OF SEWAGE LINE, SEPTIC TANK, DRAINS, REPLACEMENT OF SOIL WASTE VENT PIPE, COVER SLABS ETC AND REPAIR TO FENCING, GATE AT INS BAAZ UNDER GE (I) CAMPBELL BAY
REPAIRS TO COMPOUND WALL, RETAINING WALL, DRAINS, CULVERT AND PARAPET WALLS, FOOTPATH, KERB STONES, CHEQUERED TILES, MS/GI RAILING AND CHAIN LINK FENCING UNDER AGE B/R-I OF GE HADDO
PROVISION OF DRAINAGE PIPE, CATCHMENT WATER TANKS WITH SEDIMENT FILTERS FOR ROOF TOP RAIN WATER HARVESTING AT INS BAAZ, CAMPBELL BAY UNDER GE(I) CAMPBELL BAY
Periodical Cutting and Cleaning of Bushes, Grass around the Runway, Taxi Track and Dispersal Area and Repairs to Large Drainage Grills at INS Utkrosh, Port Blair
AR MO Water Supply under Assistant Engineer, Ferrargunj Sub Division RCD, APWD, Wimberly Gunj during 2025 26. S.W Extension of pipe line from Pahadi Nallah School Junction to Abdul Gafoor plot at Muslim Basthi under RCD, APWD, Wimberly Gunj