Loading…
Loading…
1,521 results • Best match
Request for quotation for Supply, Delivery and Erection or repairing of existing features and Operation and Maintenance for a period of 5 years on turnkey basis in All Abilities Park opposite to YMCA in Beach road developed Under Smart City at Visakhapatnam.
Supply, Erection, Testing & Commissioning for (i) Upgradation of 132/33KV SS Rudravaram to 220/132/33KV SS and (ii) Erection of 220KV DC line to proposed 220/132KV SS Rudravaram by making LILO of existing 220KV Srisailam - Mydukuru SC line on turnkey basis
Design, Supply, Erection, Testing and Commissioning of One number new 33/11KV container AIS substation (1x10MVA) at Kobbarithota Area, Sampath nagar in Guntur D2 Section of Town III Subdivision, Town 1 Division of Operation Circle Guntur of APCPDCL ... Partial Turnkey basis
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF 4 no. of 13 CAPACITY PASSENGER LIFTS FOR ACADEMIC BUILDINGS(3) AND CENTRAL LIBRARY(1) INCLUDING ALL RELATED CIVIL, ELECTRICAL & MECHANICAL WORKS FINISHED ITEM OF WORK ON LUMPSUM TURNKEY BASIS AT INSTITUTE CAMPUS OF RGUKT, NUZVID
SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF 4 no. of 13 CAPACITY PASSENGER LIFTS FOR ACADEMIC BUILDINGS(3) AND CENTRAL LIBRARY(1) INCLUDING ALL RELATED CIVIL, ELECTRICAL & MECHANICAL WORKS FINISHED ITEM OF WORK ON LUMPSUM TURNKEY BASIS AT INSTITUTE CAMPUS OF RGUKT, NUZVID
Treatment of clear water by carrying out disinfection, lowering of turbidity, maintaining the PH value etc. to ensure safe drinking water supply as per I.S 11673:1992 (Liquid Chlorine ) for Water Supply Distribution System on turn key basis (12months) in Salur Municipality under Municipal General Funds(2026-2027)
Investigation, Survey, planning, Design,Construction and handing over of 3009 EWS Flats in G+3 pattern with Monolithic concrete construction (Shear wall technology) including Internal Infrastructure facilities such as Water Supply, Sanitary, ... under EPC system ...
Consultancy Services for AE for Supervision of Rehabilitation and up gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53 590 Km of Rayachoty to Vempalli section of NH 440 in the State of AP on EPC
Construction of LVUP of size 12m x 4m for full width of ROW between two parcels of land allotted for IISER, Tirupati campus at km 504.850 in Penchalkona to Yerpedu section from km 425.400 to km. 509.400 of NH-565 in the State of Andhra Pradesh on EPC
Extension of HT supply in favour of M/s.Depot Manager, APSRTC, Kakinada ,APSRTC Complex, Kakinada in Kakinada District with CMD 3000KVA with CL 3000KW at 33KV potential under Category-II C in Shanthinagar section of Kakinada Division in Kakinada ... Circle(Partial Turnkey basis).
ERECTION OF 1 NO. 33/11KV SEMI INDOOR SUB-STATION AT ADAVITHAKKELLAPADU-OPERATION LINES SECTION, GUNTUR-TOWN-3 SUB DIVISION, GUNTUR CIRCLE IN GUNTUR DISTRICT ON SEMI-TURNKEY BASIS FOR PROVIDING ELECTRIFICATION INFRASTRUCTURE TO THE NEW COLONIES OF APTIDCO (GOVT. SCHEME) UNDER NORMAL PLAN WORKS
Erection of 2 Nos. 33/11KV Outdoor substations and its associated lines for electrification of layout under R&R Housing scheme of Polavaram Project in the Darbhagudem and Taduvain Villages of Jangareddygudem Division in West Godavari District of ... Partial Turnkey Basis
PROVIDING UG CABLE WORKS IN TIRUPATI CITY REPLACEMENT OF EXISTING 33/11KV OVERHEAD POWER DISTRIBUTION NETWORK OF 8 NOS 33/11KV SUBSTATIONS OF OPERATION DIVISION OF TIRUPATI CITY WITH UNDERGROUND POWER CABLE NETWORK USING HDD METHOD ON SEMI TURNKEY BASIS UNDER SMART CITY PROJECT
Supply, erection, testing and commissioning of (i) 2Nos. 220/33KV PTR bays and 2x14.4MVAR Capacitor Banks at 220KV SS Kuppam for proposed Battery Energy Storage System (BESS) and (ii) 1No. 14.4 MVAR Capacitor Bank at 132KV SS Shanthipuram in Chittoor ... on Turnkey basis.
Supply, erection, testing and commissioning of (i) 2Nos. 220/33KV PTR bays and 2x14.4MVAR Capacitor Banks at 220KV SS Kuppam for proposed Battery Energy Storage System (BESS) and (ii) 1No. 14.4 MVAR Capacitor Bank at 132KV SS Shanthipuram in Chittoor ... on Turnkey basis.
Design, Supply, Installation and Commissioning of Distribution Infrastructure Works Under Loss Reduction By Segregation of 11kV mixed agricultural Feeders in Ananthapuramu and Sri Sathya Sai Districts of Andhra Pradesh Under The Reforms Based And ... Partial Turnkey
PROVIDING UG CABLE WORKS IN TIRUPATI CITY REPLACEMENT OF EXISTING 33/11KV OVERHEAD POWER DISTRIBUTION NETWORK OF 8 NOS 33/11KV SUBSTATIONS OF OPERATION DIVISION OF TIRUPATI CITY WITH UNDERGROUND POWER CABLE NETWORK USING HDD METHOD ON SEMI TURNKEY BASIS UNDER SMART CITY PROJECT
SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 5 NOS. (FIVE) 33/11KV OUTDOOR SCADA COMPATIBLE SUB-STATIONS (SUITABLE FOR UNMANNING) WITH 1X5 MVA POWER TRANSFORMER AND CONNECTED LINES IN BADVEL CONSTITUENCY OF YSR KADAPA DISTRICT ON 100 ... PERCENT TURNKEY BASIS ...
RFP for Procurement of Implementing Agency for Providing All in One Solar LED Street Lights with Poles including Design, Procurement, Erection, Testing & Commissioning and Comprehensive Operation & Maintenance for 05 Years on Turnkey Basis along with associated Electrical & Civil Works under implementation of Smart City Mission
Specification No. APT-e-11/2020-Supply, Erection, Testing and Commissioning of 132/33KV Substation Ramanakkapeta at Ramanakkapeta in Krishna district on Turnkey Basis and operation of 132/33KV Substation Ramanakkapeta for a period of 2 years from the date of commissioning in Krishna District
SYSTEM IMPROVEMENT PROJECT FOR DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 2 NOS. 33/11KV GIS CONTAINERIZED SUBSTATIONS (E-HOUSE) WITH 2 X 8.0 MVA PTRs EACH AND OTHER ACCESSORIES & CABLE TERMINATION KITS IN TIRUPATI TOWN ... SEMI- TURNKEY BASIS ...
Supply and Erection of 11KV lines, 6.3KV Lines, LT Lines, DTRs and Street Light fixtures on partial Turnkey basis (DTRs & DTR LV side meters will be supplied by APEPDCL) in Bhimavaram and Narsapuram Divisions of Eluru Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme.
Supply and Erection of 7Nos. new 33/11KV Outdoor Substations along with connected 33KV lines on Partial Turnkey basis (5MVA PTRs, DTRs, VCBs, 100Sq.mm AAAC Conductor and UG cables will be supplied by APEPDCL) in Vizianagaram, Visakhapatnam and Eluru Circles of APEPDCL under APTIDCO.
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 4NOS. 33/11 KV OUTDOOR SUB-STATIONS WITH CONNECTED 33KV and 11KV LINES IN KUPPAM CONSTITUENCY OF TIRUPATI CIRCLE ON SEMI - TURNKEY BASIS (PTR, DTR and VCBs ARE DEPT. SUPPLY) WITH FINANCIAL ASSISTANCE FROM HUDCO
Supply Erection testing Commissioning of 220KV SS at Gadivemula in Nandyal District and 220KV LILO to proposed 220KV SS at Gadivemula from existing 220KV Somayajulapalli Srisailam feeder and 132KV LILO to proposed 220KV SS at Gadivemula from existing ... on turnkey basis
Supply and Erection of 11KV lines, 6.3KV Lines, LT Lines, DTRs, Street Light fixtures on partial Turnkey basis (DTRs & DTR LV side meters will be supplied by APEPDCL) in Srikakulam and Palakonda Divisions of Srikakulam Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme.
Extension of supply to 1No HT service with a CMD of 250KVA and shifting of existing 33KV 11KV and LT lines with UG cable to Dr.B.R.Ambedkar Memorial Park constructed at Swaraj Maidan M.G.Road Vijayawada in Vijayawada Town Division of Vijayawada ... semi turnkey basis
Supply, erection, testing and Commissioning of (i)132/33kV Sub-Station at RajendraNagar and (ii) 132kV Multi Circuit Line(10kM) by making Single LILO of existing 132 kV Nellore-Atmakur Line to Proposed 132/33kV SS Rajendra Nagar in SPSR Nellore ... on turnkey basis.
Electrification of layouts for E/s to 10000 Nos. LT Cat I services for newly constructed houses by APTIDCO under PMAY Scheme at Dinnedevarapadu (V), Kurnool (M) in Operation Division, Kurnool under Semi-Turnkey basis (WBS No. E-2018-08-01-22-05-004)
Providing of 220/33KV Features by erecting 2 No's 220/33KV 80MVA PTRs at existing 220/132/33KV Parawada SS, Associated works of extension of the existing 220KV Bus with Bus Sectionalizer Scheme in Parawada, Anakapalli District under System ... on turnkey basis
Supply and Erection of 11KV lines, 6.3KV Lines, LT Lines, DTRs, Street Light fixtures on partial Turnkey basis (DTRs & DTR LV side meters will be supplied by APEPDCL) in Narsipatnam and Paderu Divisions of Visakhapatnam Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme
Supply, Erection, Testing and Commissioning of Temporary Diversion of existing 220kV VTS-Podili - Narsaraopeta DC Line between location Nos. 35 to 37 passing through allotted site of Basavataraka Ramarao Memorial Cancer Foundation Hospital in APCRDA ... on turnkey basis
Supply and Erection of new 33 by 11KV Substation 1x5MVA at Mallam(V) of Pithapuram Rural Section, Pithapuram Sub-division in Kakinada Division of Rajamahendravaram Circle under T&D on partial Turnkey basis Power Transformer, Station Transformer and VCBs will be supplied by APEPDCL.
SYSTEM IMPROVEMENT PROJECT FOR DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 2 NOS. 33/11KV GIS CONTAINERIZED SUBSTATIONS (E-HOUSE) WITH 2 X 8.0 MVA PTRs EACH AND OTHER ACCESSORIES & CABLE TERMINATION KITS IN TIRUPATI TOWN ... SEMI- TURNKEY BASIS ...
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase1 under NAVARATNALU PEDALANDARIKI ILLU scheme in all Divisions of Prakasam district in ... on turnkey basis
Shifting (by heightening) of 0.17kms of 11KV line and 1 No. DTR with connected material under 11KV Burjupalli feeder which obstructing construction activities of High level Bridge near Kuppamrajupalli(V) taken up by the R&B authorities under Turnkey basis in Operation Section, Chakrayapeta.
Supply, Erection, testing & commissioning of 132 KV DC line (1.00KM) from LOC.No.116/2 of existing 132 KV Cumbum -Kesinenipalli line to 132 KV Dornala SS and 1 No new 132 KV Bay at 132 KV Dornala SS in Prakasam District on turnkey basis
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 4NOS. 33/11 KV OUTDOOR SUB-STATIONS WITH CONNECTED 33KV AND 11KV LINES IN KUPPAM CONSTITUENCY OF TIRUPATI CIRCLE ON SEMI - TURNKEY BASIS (PTR, DTR AND VCBs ARE DEPT. SUPPLY) WITH FINANCIAL ASSISTANCE FROM HUDCO
Supply and Erection of 11KV lines,6.3KV Lines, LT Lines,DTRs, Street Light fixtures on partial Turnkey basis (DTRs & DTR LV side meters will be supplied by APEPDCL)in Bobbili and Parvathipuram Divisions of Vizianagaram Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme.
Miscellaneous Civil works excluded in the scope of NDTB EPC work at Rajahmundry Airport.
Construction of proposed 2-lane ROB and its approaches in lieu of existing level Crossing No.95 at Km.183/600 (railway chainage 145/500-600) of NH205 (Km.9/6 of new NH-71) under Setu Bharatam in the State of Andhra Pradesh under NH(O)on EPC(3rd call)
Investigation, Detail Design and Construction of Smart Trunk Infrastructure with Roads, Strom water drains, Water supply network, sewerage network, utility ducts for Power & ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation & ... on EPC Basics.
Request for Selection (RfS) of EPC Contractors/ RTS Vendors for Design, Engineering, Supply, Installation, Testing & Commissioning and O&M for 5 years of 1,198.21 MWp Grid Connected Rooftop Solar Plants for 5,99,105 SC and ST Consumers through Utility Led Aggregation (CAPEX) Mode in APDISCOMs under PM- Surya Ghar: Muft Bijli Yojana
Modernization of Yeleru Irrigation and Drainage System, in East Godavari District including detailed investigation , sub soil exploration, preparation of HPs,L.P. Schdules,Design of CM and CD Works, fixing remarkation KM and HM Stone along ... on EPC turnkey system.Briefly ...
SYSTEM IMPROVEMENT PROJECT FOR ERECTION OF 4No. 33/11KV OUTDOOR SUB-STATION WITH 1X5 MVA PTR AT BURUJUPALLI IN GIDDALUR (M), ALLINAGARAM IN KOMAROLU (M), NALLAGUNTLA IN KOMAROLU (M) AND CHINNA CUMBUM IN CUMBUM (M) OF PRAKASAM DISTRICT ON SEMI-TURNKEY BASIS UNDER T&D IMPROVEMENTS
SYSTEM IMPROVEMENT PROJECT FOR DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 2 NOS. 33/11KV GIS CONTAINERIZED SUBSTATIONS (E-HOUSE) WITH 2 X 8.0 MVA PTRs EACH AND OTHER ACCESSORIES AND CABLE TERMINATION KITS IN TIRUPATI TOWN ... SEMI- TURNKEY BASIS ...
Supply, Erection, Testing and Commissioning of ABT Metering & Metering equipment at 132/220KV Railway Traction feeders at both the ends of AP Transco Sub Station & RTSS at Bapatla, Tenali, Tadepalli (Krishna Canal) & Ongole in Guntur District and ... on turnkey basis
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF DISTRIBUTION INFRASTRUCTURE WORKS UNDER LOSS REDUCTION BY SEGREGATION OF AGL FEEDERS AND BIFURCATION OF OVER LOADED 33KV FEEDERS IN NELLORE DISTRICT (OLD) OF ANDHRA PRADESH UNDER THE REFORMS BASED AND ... PARTIAL TURNKEY
Electrification of RR Center layout of Andhra Pradesh Mineral Development Corporation Limited near Ayyaparajaupalli for Rehabilitation to the villagers of Kapupalli A.W & H.W pertains to Obulavaripalli section of Rajampeta Division in Kadapa circle ... under Turnkey Basis ...
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 1NO. 33/11KV SEMI-INDOOR SUB-STATION WITH CONNECTED 33KV AND 11KV LINES AT NARAVARIPALLI IN CHANDRAGIRI MANDAL OF TIRUPATI CIRCLE ON SEMI - TURNKEY BASIS (PTR and DTR ARE DEPT. SUPPLY) WITH FINANCIAL ASSISTANCE FROM HUDCO