Loading…
Loading…
1,521 results • Best match
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF DISTRIBUTION INFRASTRUCTURE WORKS UNDER LOSS REDUCTION BY SEGREGATION OF AGL FEEDERS AND BIFURCATION OF OVER LOADED 33KV FEEDERS IN CHITTOOR DISTRICT (OLD) OF ANDHRA PRADESH UNDER THE REFORMS BASED ... PARTIAL TURNKEY
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 23NOS. 33/11KV OUTDOOR SUB-STATIONS WITH CONNECTED 33KV AND 11KV LINES AND BIFURCATION /INTER LINKING LINES OF 33KV AND 11KV OVER LOADED FEEDERS IN KADAPA CIRCLE ON ... FULL TURNKEY BASIS ...
SUPPLY INSTALLATION COMMISSIONING OF 18 NOs 33 11KV OUTDOOR AIR INSULATED SUB STATIONS AIS WITH METAL CLAD VCBS AND CONNECTED 33KV 11KV UG CABLES AND OH LINES WITH SCADA AUTOMATION IN JAGANANNA COLONIES OF KRISHNA GUNTUR PRAKASAM DISTRICTS IN APCPDCL ... ON TURNKEY BASIS ...
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in all Divisions of Prakasam district ... semi turnkey basis
SUPPLY INSTALLATION COMMISSIONING OF 18 NOs 33 11KV OUTDOOR AIR INSULATED SUB STATIONS AIS WITH METAL CLAD VCBS AND CONNECTED 33KV 11KV UG CABLES AND OH LINES WITH SCADA AUTOMATION IN JAGANANNA COLONIES OF KRISHNA GUNTUR PRAKASAM DISTRICTS IN APCPDCL ... ON TURNKEY BASIS ...
Shifting (by heightening) of 0.17km's of 11KV line and 1 No. DTR with connected materials under 11KV Burjupalli feeder which obstructing construction activities of High level Bridge towards Kuppam side near Kuppamrajupalli(V) taken up by the R&B ... under Turnkey basis ...
Supply, Erection, Testing and Commissioning of 33kV Features at existing 132/11 kV Switching Station Undavalli (Kondaveeti Vagu) by extending the existing 132kV Bus for accommodating 2 Nos. 31.5MVA Power Transformers by forming of 33kV Bus and ... on turnkey basis ...
Supply, Erection, Testing, Commissioning of (i)132KV , 33KV features at existing 220KV switching station at Somayajulapalli (ii) 132KV DC line to 220KV Switching station at Somayajulapalli by making LILO (2KM) of existing 132 KV AP Carbides - Cement ... on turnkey basis ...
Supply, Erection, Testing and Commissioning of 1 No. 33KV Chagalamarri feeder bay extension at 132/33KV SS Duvvur in O&M circle, Kadapa for bifurcation of overloaded 33 KV Feeders and also to provide 9 Hrs agricultural supply during day time in ... on Turnkey basis
Supply, Erection, Testing & Commissioning of 33kV Features at existing 132/11 kV Switching Station Undavalli (Kondaveeti Vagu) by extending the existing 132kV Bus for accommodating 2 Nos. 31.5MVA Power Transformers by forming of 33kV Bus and ... on turnkey basis ...
Detailed estimate for Erection of 1No 33KV Feeder from newly sanctioned 220 by 33KV SS Chintoor to give the load relief to 33KV Yatapaka Kunavaram feeder emanating from 132 by 33KV SS Yatapaka of Rampachodavaram division under partial turnkey basis 2 Nos M plus 12 towers
Supply and Erection of 11KV lines, 6.3KV Lines, LT Lines and DTRs on partial Turnkey basis (DTRs & DTR LV side meters will be supplied by APEPDCL) in Pithapuram, Samalkota Sub-Divisions and RC Puram Division of Rajamahendravaram Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme.
Supply ,Erection,Testing and Commissioning of 132kV 2nd Ckt. on existing 132kV DC/SC line from 132kV Kadiri SS to 132kV Pulivendula SS(25KM) and 132kV Bay Extensions at 132 Kadiri SS (2Nos) and at 132kV Pulivendula SS (1 No) and on turnkey basis in Anantapuram District
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF DISTRIBUTION INFRASTRUCTURE WORKS UNDER LOSS REDUCTION BY SEGREGATION OF AGL FEEDERS AND BIFURCATION OF OVER LOADED 33KV FEEDERS IN KADAPA & KURNOOL DISTRICTS (OLD) OF ANDHRA PRADESH UNDER THE REFORMS ... PARTIAL TURNKEY
REPLACEMENT OF EXISTING OVERHEAD POWER DISTRIBUTION NETWORK WITH UNDERGROUND POWER CABLE NETWORK AND PROVIDING CSS ON TURNKEY BASIS IN PULIVENDULA TOWN IN PULIVENDULA OPERATION DIVISION OF OPERATION CIRCLE, KADAPA UNDER DC WORKS FOR CENTRAL BOULEVARD PROJECT UNDER PULIVENDULA MODEL TOWN PROJECT OF PADA, GOVERNMENT OF ANDHRA PRADESH
Supply and Erection of 11KV lines, 6.3KV Lines, LT Lines, DTRs, Street Light fixtures on partial Turnkey basis (DTRs & DTR LV side meters will be supplied by APEPDCL) in Zone-3, Anakapalli and RESCO Divisions of Visakhapatnam Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme.
ERECTION OF NEW 33KV LINES UNDER 33KV DARSI FEEDER, 33KV MUNDLAMURU FEEDER AND 33KV TALLURU FEEDER WHICH ARE OVERLOADED/AGED FEEDERS OVER PROPOSED M+6/M+9 TOWERS WITH 157 SQ.MM AL 59 CONDUCTOR IN OPERATION CIRCLE ONGOLE IN THE JURISDICTION OF APCPDCL ... ON TURNKEY BASIS
Supply, Erection, Testing and Commissioning of (i) Stringing of 2nd circuit (14.2KM) on existing 132kV DC/SC line from 132/33kV SS Rayachoty to 132/33 kV SS Sambepalli (ii) 1 No. 132kV Bay extension at 132kV SS Rayachoty (iii) 1No.132kV Bay Extension ... on turnkey basis
Manning, Operation and Maintenance of Nellimarla, Ramatheerdalu, Kudipi Head Water Works, Master Pump House (Old & Amruth) and all Pumping Mains to fill up all the reservoir fall under Nellimarla Source including Men and Material for period of 12 ... on Turn Key basis ...
Investigation, Survey, Planning, Design, Construction and handing over of 3312 EWS Flats in G+3 Pattern with Monolithic Concrete construction (Shear wall technology) including Internal Infrastructure facilities such as water supply, sanitary, ... under EPC System ...
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in Machilipatnam, Gudiwada and Gunadala ... semi turnkey basis
Supply, Erection, Testing and Commissioning of (a) 132/33kV NSTL with PASS modules (hybrid PASS) (b) 132kV DC line with OH (3.565KM) and with 132kV 630sqmm UG XLPE Cable with accessories (1.075KM) and (c) 2no's 132kV bays at 220/132kV Simhachalam SS ... on turnkey basis
Supply, Installation, Testing, Commissioning and Maintenance of 3 no. of 13 capacity passenger lifts for Academic Buildings (3) and 1 no of 10 capacity passenger lifts Central Library(1) including all related Civil, Electrical & Mechanical works & ... Lumpsum Turnkey basis ...
Erection of lines and sub stations in Kadapa district on turnkey basis under Gandikota Lift Irrigation Scheme against tender Specification No. e-APT-110/2007 - Execution of balance left over works of M/s. Maytas Infra Ltd., at 220/11KV SS Thimmapuram and at 132/11KV GKLIS, Kondapuram
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in Machilipatnam, Gudiwada and Gunadala ... semi turnkey basis
Design, Supply, Installation, Commissioning, Operation & Maintenance of Solar Home Lighting Systems (SHLS) for electrification of PVTG Households in Un-electrified Tribal Habitations in Rajamahendravaram and Eluru Circles of Eastern Power ... 100% turnkey and ...
Supply, Erection, testing ,commissioning of 220KV SS at Banavasi in Kurnool district and 220KV single LILO to proposed 220KV SS at Banavasi from existing 220KV Mythra- Nansuralla DC line and 132KV double LILO to proposed 220KV SS at Banavasi from ... on turnkey basis
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 1NO. 33/11KV OUTDOOR SUB-STATION WITH ITS CONNECTED 33KV and 11KV LINES AT YELLANTI IN NELLORE RURAL CONSTITUENCY OF NELLORE CIRCLE ON SEMI - TURNKEY BASIS (PTR, DTR and VCBs ARE DEPT. SUPPLY) UNDER T and D IMPROVEMENTS.
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in Machilipatnam, Gudiwada and Gunadala ... on turnkey basis
Design, Supply, Installation, Commissioning, Operation & Maintenance of Solar Home Lighting Systems (SHLS) for electrification of PVTG Households in Un-electrified Tribal Habitations in Rajamahendravaram and Eluru Circles of Eastern Power ... 100% turnkey and ...
Supply, Erection, Testing and Commissioning of (i) 132kV DC/SC line (12KM) from 132/33kV SS Hamsavaram to M/s Divis Labs (ii) 1No 132kV Bay at Hamsavaram SS (iii) 1No 132kV Metering Bay at Divis Labs at Kona (V), Ontimamidi (P), Thondangi (M), ... on Turnkey Basis
shifting of existing 11KV, LT lines and Dist. Transformer under 11KV feeder which obstructing Road widening works from Govt.Hospital to Muddanur Ring Road Circle in Pulivendula Town in Turnkey basis under DC works pertaining to Operation section, Pulivendula Town vide WBS No.:D-2023-06-05-11-01-019
Survey, Design, Supply, Installation, Commissioning of 1No. 33/11KV Outdoor Sub-station with its connected 33KV and 11KV Lines at Chamarthikandriga village in Sathyavedu Mandal of Sathyavedu constituency pertaining to operation circle, Tirupati on ... - Turnkey basis ...
Supply, Installation, Commissioning of 2Nos. 33/11 KV Outdoor Sub-stations and connected 33 KV and 11 KV lines at Kaspapeta and Chencham Reddygari palli in Rompicherla Mandal, Punganur division, Tirupati circle on Semi-Turnkey basis (PTR, DTR and VCBs supplied by APSPDCL) under T and D improvements
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in Nuziveedu, Vuyyuru and Vijayawada ... on turnkey basis
Supply and Erection of 11KV lines, 6.3KV Lines, LT Lines, DTRs & Street Light Fixtures on partial Turnkey basis (DTRs, DTR LV side meters will be supplied by APEPDCL) in Vizianagaram Town, Lines, Cheepurupalli and Bhogapuram Sub-Divisions of Vizianagaram Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme.
Supply,Erection,Testing and Commissioning of 33 kv features at existing 132/11 kv switching station Undavalli (Kondaveeti Vagu) by extending 132 KV Bus for accommodating 2 Nos 31.5 MVA Power Transformers by forming of 33 KV Bus and extension of ... on turnkey basis
Supply ,erection ,Testing & Commissioning of 132 KV DC line (1.0 KM) from Loc. No.116/2 of existing 132 KV Cumbum- Kesinenipalli line to 132 KV Dornala Substation along with construction of 1 No. new 132 KV Bay at 132 KV Dornala SS in Prakasam ... on turnkey basis.
Investigation, Survey, Planning, Design, Construction and Handing over of 14441 EWS flats in G+3 pattern with Monolithic Concrete Construction (Shear Wall Technology) including Internal Infrastructure facilities such as Water Supply, Sanitary, ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and Handing over of 15302 EWS Flats in G+3 pattern with Monolithic Concrete Construction (Shear Wall Technology) including Internal Infrastructure facilities such as Water Supply, Sanitary, ... under EPC system ...
Investigation, survey, planning, Design, construction and handing over of 17968 EWS Flats in G+3 Pattern with Monolithic concrete construction (shear wall technology) including Internal Infrastructure facilities such as water supply, sanitary, ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and Handing over of 14441 EWS flats in G+3 pattern with Monolithic Concrete Construction (Shear Wall Technology) including Internal Infrastructure facilities such as Water Supply, Sanitary, ... under EPC system ...
supply, erection, testing and commmissioning of 132/33KV SS at T.Narasapuram by making LILO of both circuits of existing 132kv DC line of KV Kota-Aswaraopeta on Turnkey basis in West Godavari Dist and operation of 132/33KV SS T.Narasapuram for period of 2 years from the date of commissioning
Extension of HT supply for a CMD of 3000 KVA with a CL of 4000KW in favour of M/s GMR Visakhapatnam International Airport Ltd at Gudepuvalasa Village in Operation Section Bhogapuram of Vizianagaram Rural Division in Vizianagaram Circle under HT ... (Partial Turnkey Basis)
Supply, erection,testing and commissioning of balance works of 220kV DC line from 220kV Gunadala Substation to 220kV Nunna Substation with Monopoles and on Multi-circuit towers in the same corridor of existing old SC line and dismantling of existing ... on turnkey basis.
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in all Divisions of Guntur and CRDA ... on turnkey basis
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in all Divisions of Guntur and CRDA ... on turnkey basis
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in Nuziveedu, Vuyyuru and Vijayawada ... semi turnkey basis
Survey, Design, Supply, Installation, Commissioning of 1No. 33/11KV Outdoor Sub-station with its connected 33KV and 11KV Lines at Yellanti Village in Nellore Rural Mandal of Nellore Rural Constituency pertaining to operation circle, Nellore on Semi - ... - Turnkey basis ...
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 1NO. 33/11KV OUTDOOR SUB-STATION WITH ITS CONNECTED 33KV and 11KV LINES AT RandR CENTRE, JOGAPURAM (NEW THALLAPRODDATUR) IN JAMMALAMADUGU CONSTITUENCY OF KADAPA ... - TURNKEY BASIS ...