1,521 results • Best match
SYSTEM IMPROVEMENT PROJECT FOR ERECTION OF 33KV AND 11KV FEEDER BAYS, 11KV VCBs, 33KV AND 11KV INTERLINKING LINES FOR BIFURCATION OF 33KV AND 11KV OVERLOADED FEEDERS/ PROVIDING OF ALTERNATE SUPPLY ARRANGEMENTS TO CERTAIN 33/11KV SUB-STATIONS IN ... PERCENT TURNKEY BASIS ...
Design, Supply, Installation, Commissioning, Operation & Maintenance of Solar Home Lighting Systems (SHLS) for electrification of PVTG Households in Un-electrified Tribal Habitations in Srikakulam, Visakhapatnam, Rajamahendravaram and Eluru Circles ... 100% Turnkey and ...
Balance works of Supply,Erection,Testing and commissioning of 132/33 KVChinnarikatla SS with connected 132 KV DC line from 220 KV SS Podili to the proposaed 132 KV SS Chinnarikatla and erection of 2 nos 132 KV bays at 220 KV SS Podili in Prakasam ... on turnkey basis
Treatment of Clear water by carrying out disinfection loering of turbidity maintaining the PH value etc. to ensure safe drinking water supply as per IS 11673:1992 (liquid Chlorine) for water supply Distribution system on turnkey basis from 01-04-2023 to 31-03-2024 (12 Month) in Ichapuram Municipality
Treatment of Clear water by carrying out disinfection loering of turbidity maintaining the PH value etc. to ensure safe drinking water supply as per IS 11673:1992 (liquid Chlorine) for water supply Distribution system on turnkey basis from 01-04-2024 to 28-02-2025 (11 Month) in Ichapuram Municipality
Construction of Greenfield no firll Airport at Orvakal In Kurnool District (A.P) under EPC system. Flexible pavements: Construction of New Runway 2000 M X 30 M. Turning Pads, Taxiway, Apron, Isolation bay, Shoulders to taxiway/apron/isolation bay. Approach road from highway to ariport, preipheral road, Internal Roads,car parking, Boundary wall, pipe culverts and earthern drain.
System improvement project for design,supply, installation, testing, commissioning with five years of comprehensive maintenance contract of 6 Nos Solar Photo Voltaic plants with total capacity of 124 KWp at roof tops of various offices of APEPDCL and ... 100% turnkey basis ...
Construction of 4Nos. new 33/11KV outdoor substations, R&M of substations, erection and reconductoring of 33KV, 11KV & LT lines, erection and enhancement of DTRs, R&M of DTR structures in Kakianda, Peddapuram, Samalkota, Pithapuram and Tuni Towns of ... partial turnkey basis
SYSTEM IMPROVEMENT PROJECT WORKS FOR ERECTION OF 2 NOS. 33/11KV SEMI INDOOR SUB-STATION AT NIDAMARRU VILLAGE AND MANGALAGIRI TOWN OF MANGALAGIRI D-2 SECTION, CRDA-AMARAVATHI CIRCLE IN GUNTUR DISTRICT ON SEMI-TURNKEY BASIS FOR PROVIDING ELECTRIFICATION INFRASTRUCTURE TO THE NEW COLONIES OF APTIDCO (GOVT. SCHEME) UNDER NORMAL PLAN WORKS
Supply,erection,testing and commissioning of i)132KV,2 Phase DC/SC line from the existing 220/132KV Nandyal ss to the proposed 132KV RTSS Nandyal(6.3KM)ii)1no. 132KV Bay at 220/132KV SS Nandyal for RTSS and iii)1 no.132KV Bay at RTSS Nandyal in ... on turnkey basis.
Construction of 1 No new 33 by 11KV outdoor substation, Erection of Additional or augmentation of PTR, DTRs, RandM of substations, Erection of New or Reinforcement or Reconductoring of 33KV, 11KV and LT lines in Srikakulam, Amadalavalasa, Palasa ... partial turnkey basis
Erection of 5Nos 33/11KV Outdoor Sub-stations along with connected lines, 13KM of 33KV interlinking lines and Erection of 15Nos additional/enhancement of PTRs on partial turnkey basis (PTRs, DTRs, VCBs, HT TVR Meters, and 100/55sqmm AAA conductor will be supplied by APEPDCL) in Jaggampeta Division of Rajamahendravaram Circle of APEPDCL
Erection of lines and sub stations in Kadapa district on turnkey basis under Gandikota Lift Irrigation Scheme against tender Specification No. e-APT-111/2007 - Execution of balance left over works of M/s. Maytas Infra Ltd., at 220/11KV SS Yellanur, 220/11KV SS Gaddamvaripalli and at 220/11KV SS Goddumarri
Balance works of Supply, Erection, Testing and Commissioning of 132/33 kV Chinnarikatla Sub Station with connected 132kV DC Line from 220 kV SS Podili to the Proposed 132/33 kV SS Chinnarikatla and erection of 2 nos. 132 kV bays at 220 kV SS Podili ... on turnkey basis
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING OF 1NO. 33/11KV OUTDOOR SUB-STATION WITH ITS CONNECTED 33KV and 11KV LINES AT R and R CENTRE, JOGAPURAM (NEW THALLAPRODDATUR) IN JAMMALAMADUGU CONSTITUENCY OF KADAPA ... - TURNKEY BASIS ...
Balance works of Supply, Erection, Testing and Commissioning of 132/33 kV East Gangavaram Sub Station with connected 132kV DC Line from 220 kV SS Podili to the Proposed 132/33 kV SS East Gangavaram and erection of 2 Nos 132 kV bays at 220 kV SS ... districton turnkey basis
Shifting of 33KV/11 KV/LT lines and Dist. Transformers along the road from Gajulapeta to N.T.R Circle in Vempalli Town for purpose of Road Widening which taken up by R&B Department under Turnkey basis under DC works in operation section, Vempalli vide WBS No.:D-2020-06-05-21-01-006
Design, Supply, Erection, Testing, Commissioning of 0.75 km 33kv single circuit line with ACSR panther conductor over proposed 2 nos. special type 220 KV tsp-cs plus 12 towers across Papagni river near Gadikovuru (V) under 33 KV Siddareddygaripalli ... on turnkey basis
Supply, Erection, Testing and Commissioning of 132/33kV SS at Acharya Nagarjuna University (Near Kaza) with 2x50MVA Transformer capacity and connected 132kV Line (0.4kM) by making LILO of existing 132kV Tadepalli- Guntur SC line to the proposed ... on turnkey basis.
Balance works of Supply,Erection,Testing and commissioning of 132/33 KV East Gangavaram SS with connected 132 KV DC line from 220 KV SS Podili to the proposaed 132 KV SS East Gangavaram and erection of 2 nos 132 KV bays at 220 KV SS Podili in ... on turnkey basis
Design, Supply, Erection, Testing, Commissioning of 0.75 km 33kv Double circuit line with ACSR panther conductor over proposed 2 Nos. special type 220 KV TSP-CS Plus 12 Towers between Daanavulapadu & Sunnapurallapalli) in Jammalamadugu Rurals Section ... on turnkey basis
Shifting of Existing 33 KV,11KV, DTR's and LT lines under various feeders which obstructing Road widening from YS Madhu petrol bunk to Vijaya homes Ring Road Circle of Pulivendula Town in Turnkey basis under DC works pertaining to Operation section, Pulivendula Town vide WBS No.: D-2023-06-05-11-01-003
Supply, Erection, Testing and Commissioning of (i) 132kV DC/SC line from 132kV Burrakayalakota SS to 132kV SS Tanakallu (29KM) (ii) 1No. 132kV Bay extension at 132kV SS Burrakayalakota for Tanakallu feeder in Chittoor District (iii) 1No. 132kV Bay ... on turnkey basis
Electrification of newly formed layouts having more than 50 and less than 550 plots by erecting DTRs, 11KV lines and LT lines in Jagananna Housing colonies of phase 1 under NAVARATNALU PEDALANDARIKI ILLU scheme in in all Divisions of Guntur and CRDA ... semi turnkey basis
Electrification of newly formed layouts having less than 50 and between 550 and 5000plots of phase 1 by erecting PTRs, 11KV VCBs magnetic actuator, DTRs, 11KV lines and LT lines in Jagananna Housing colonies under NAVARATNALU PEDALANDARIKI ILLU ... semi turnkey basis
Hydro Jet Blasting (Ultra High Pressure) works at various locations on Turnkey Basis on INS SUJATA
APSPCL- Kadapa Ultra Mega Solar Park (1000 MW) - Supply, Erection, Testing and Commissioning of 33 kV line over head transmission line from nearest APSPDCL 33kV line to 220/33 kV Pooling Station-4 for a length of 9 Kms including HT metering and ... on turnkey basis ...
Construction of 2 Nos. new 33/11KV Oudoor type Sub-stations, R&M of Sub-stations, Strengthening of Distribution Network, DTRs with meters, R&M of DTR and Sign Boards in Palakonda(Srikakulam), Nellimarla(Vizianagaram), Yelamanchili(Visakhapatnam), ... Partial Turnkey Basis
Construction of 2 Nos. new 33/11 KV Outdoor type sub-stations, R&M of sub-stations, Strengthening of Distribution network, DTRs with meters, R&M of DTR and Sign boards in Palakonda(Srikakulam), Nellimarla(Vizianagaram), Yelamanchili(Visakhapatnam) ... Partial Turnkey basis
Supply, Erection, Testing and Commissioning of balance works of 132/33kV SS at Dharmajigudem along with Erection of 132kV DC/SC line of 28Km from 220/132kV K.Kota SS to proposed 132/33kV SS at Dharmajigudem and Erection of 132kV feeder Bay extension ... on turnkey basis
Construction & Commissioning of Five Lift Irrigation Schemes (i) 52 Basapuram LIS (ii) Kagallu LIS both in Mantralayam Mandal (iii) Gothaladoddi LIS in Kowthalam mandal and (iv) Kandukuru-II LIS and (v) Airangallu LIS both in Kosigi Mandal on ... on turnkey basis ...
Laying of (2.8 KM x3 cables)132 KV, 630 sq mm XLPE U/G Copper cable (Single Circuit) with associated accessories including services for Jointing, Terminations, Site testing and Commissioning the complete cable system from 132/33KV Ongole SS to ... partial turnkey basis
Survey, Design, Supply, Installation, Commissioning of 1No. 33/11KV Outdoor Sub-station with its connected 33KV and 11KV Lines at R and R Centre,Jogapuram (New Tallaproddatur) village in Kondapuram Mandal of Jammalamadugu constituency pertaining to ... - Turnkey basis ...
Supply and Erection of 5Nos. new 33/11KV Outdoor Substations along with connected 33KV & 11KV lines AND 33KV interlinking lines on Partial Turnkey basis (PTRs, DTRs, VCBs(except for bay extension at EHT SS), 24V DC batteries with chargers, 100Sq.mm & 55Sq.mm AAAC Conductors will be supplied by APEPDCL) in Eluru & West Godavari Circles of APEPDCL.
Replacement of existing 220 KV ,120 KN SRC insulators with New 120 KN SRC Insulators at all cut point towers from Loc No 01 to 69 (30 Nos Towers) to avoid frequent breakdowns in 220 KV DC line from 400 KV SS Rachagunneri to 220 KV SS Naidupeta in ... on turnkey basis.
Supply, Erection, Testing and Commissioning of (1) 132/33kV SS Saripalli in Ganapavaram mandal (2) 132KV DC line (15.744KM) from 220/132/33 KV Undi SS to 132/33 kV SS Saripalli and (3) 2 No.132KV feeder bay extensions at 220/132 /33 KV SS Undi in ... on turnkey basis
ETS Survey, GEO Technical Investigation, Design and Construction of Judicial Complex in G+2 Building with approximate BUA of 2,25,000 Sqft. with foundation of G+5 Stories with RC column frame structure, Architectural Finishes, Internal Electrical, ... under EPC system ...
Rejuvenation of RL Nagar 20 MLD STP to meet effluent parameters as per NGT Norms and Repairs of Bio-Gas Energy plants at 4 Nos. UASBR plants at Ajith Singh Nagar-2 Nos., Jakkampudi and RL Nagar in VMC for power generation to reduce carbon emissions ... Non- EPC (Design ...
Investigation, Survey, Design and Construction of 60 Nos. of Sewage Treatment Plants (STPs) under Package-I with Cumulative Capacity of 281.35 MLD at various ULBs in the State of Andhra Pradesh based on Modern Technology with three months trial run ... - EPC Tender
Rejuvenation of RL Nagar 20 MLD STP to meet effluent parameters as per NGT Norms and Repairs of Bio-Gas Energy plants at 4 Nos. UASBR plants at Ajith Singh Nagar-2 Nos., Jakkampudi and RL Nagar in VMC for power generation to reduce carbon emissions ... Non- EPC (Design ...
Investigation, Survey, Design and Construction of 22 Nos. of Sewage Treatment Plants (STPs) under Package-II with Cumulative Capacity of 157.10 MLD at various ULBs in the State of Andhra Pradesh based on Modern Technology with three months trial run ... - EPC Tender
Erection of 3Nos 33/11KV Outdoor Sub-stations along with connected lines, 18KM of 33KV interlinking lines and Erection of 18Nos additional/enhancement of PTRs on partial turnkey basis (PTRs, DTRs, VCBs, HT TVR meters and 100/55sqmm AAA conductor will be supplied by APEPDCL) in JR Gudem, Koyyalagudem and Jeelugumilli Sub-Divisions of Eluru Circle of APEPDCL
Erection of 1No 33/11KV Outdoor Sub-station along with connected lines, 32KM of 33KV interlinking lines and Erection of 27Nos additional/enhancement of PTRs on partial turnkey basis (PTRs, DTRs, VCBs, HT TVR Meters, and 100/55sqmm AAA conductor will be supplied by APEPDCL) in Divisions of Amalapuram, Rajamahendravaram, Kakinada, RC Puram Divisions of Rajamahendravaram circle of APEPDCL
Supply, Erection, Testing and Commissioning of Erection of 132 KV SS Galiveedu and 132 KV DC line (25 KM) from 220/132 KV Chakrayapeta SS to proposed 132/33 KV Galivedu SS in YSR Kadapa District on turnkey basis and operation of 132/33 KV Galiveedu SS for a period of 2 years from the date of commissioning
Supply, erection, construction, testing and commissioning of (i) 132/33 KV Sub station at Narsapuram (with Automation features) (ii) 132 KV DC line (25.0 KM) from 220/132/33 KV Nuzvid SS to proposed 132/33 KV Narsapuram SS and (iii) 2 Nos. 132 KV ... on turnkey basis.
Supply, Erection, Testing and Commissioning of Erection of 132 KV SS Galiveedu and 132 KV DC line (25 KM) from 220/132 KV Chakrayapeta SS to proposed 132/33 KV Galivedu SS in YSR Kadapa District on turnkey basis and operation of 132/33 KV Galiveedu SS for a period of 2 years from the date of commissioning
Supply and Erection of i. 2nd Ckt Stringing on 132 KV Uravakonda-Guntakal Line,ii.132KV DC LILO Line from 132KV Uravakonda-Guntakal Line to 220 KV Vajrakarurs SS ,iii. 132KV Bay Extensions 2 Nos at 220KV Vajrakarur SS ,1No. at 132 KV SSGuntakal and 1 ... on Turnkey basis
Laying of 24KM (4KM X 6Cable) 220KV, 1000 sq.mm XLPE U/G Copper Cable (Double Circuit) with Associated accessories including services for Jointing, Terminations, Site Testing and Commissioning the complete Cable System from 220/132/33KV Ongole ... Partial turnkey basis
Extension of HT Supply in favour of the EE/PIPLMC Division Rajamahendravaram with CL of 250KVA for auiliary supply to 220KVA Ramavaram switching station (for purushothapatnam LIS Stage-II) at Ramavaram (V) Jaggampeta(M) in E.G District for a CMD of ... partial turnkey basis
Supply, erection, construction, testing and commissioning of (i) 132/33 KV Sub station at Narsapuram (with Automation features) (ii) 132 KV DC line (25.0 KM) from 220/132/33 KV Nuzvid SS to proposed 132/33 KV Narsapuram SS and (iii) 2 Nos. 132 KV ... on turnkey basis.