Execution of work for 33KV Alternate supply to 33/11 KV Substations, Rajeevnagar, Kukkunuru, Velairpadu & Rachannagudem duly erection of 10.3km 33KV interlinking line from 33/11KV SS, Nellipaka (ASR district) to 33/11KV Sub Station, Rajeevnagar ... (Partial turnkey basis)
Design,Engineering,Manufacturing,Testing before Despatch,Loading,Supply for Destination including Transportation,Civil & Construction Works ,Erection,Testing and Commissioning of (I) New 400/220/132kV Sub-Station at Gudivada,Krishna District with 2 x ... on Turnkey Basis.
Supply and Erection of 13 Nos. new 33 by 11KV Semi INDOOR AIS Sub-stations PTRs will be erected in Outdoor and Switchgear other equipment erected in Indoor Ground Floor and 33KV lines on partial Turnkey basis in Kakinada and Amalapuram Divisions of Rajamahendravaram Circle of APEPDCL under Navaratnalu Pedalandariki Illu Flagship Programme Power Transformers, Distribution Transformers and 100Sq.mm AAA Conductor will be supplied by APEPDCL.
Supply, Erection, Testing and Commissioning of 33 kV overhead transmission line from APSPDCL sub station Dhodium to 220/33 kV pooling stations- 1&2 at a lenght of 4.6 KM including 33 kV bay extension at APSPDCL substation, Dhodium and 33 kV metering ... on turnkey basis ...
DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF DISTRIBUTION SYSTEM STRENGTHENING WORKS FOR ERECTION OF 2 NOS NEW 33 KV LINES UNDER 33KV CHAPALAMADUGU FEEDER AND 33KV PULLALACHERUVU FEEDER WHICH ARE OVERLOADED AGED FEEDERS OVER PROPOSED M+6 ... ON TURNKEY BASIS
Erection of 4Nos 33/11KV Outdoor Sub-stations, 30.9 KM of 33KV lines for New SSs, interlinking lines from New and existing EHT SSs, 101.45Km of 11KV lines for New SSs, bifurcation of feeders, interlinking lines and enhancement of 8Nos PTRs on partial ... partial turnkey basis ...
Extension of HT supply to M/s HPCL in S.No.334 & 335, MB Patnam (V), Nathavaram (M), Nathavaram Section of Nathavaram Sub-Division in Narsipatnam Division of Anakapalli Circle for a CMD of 4000KVA with CL of 5000KW under HT Cat-II on separate new ... 100% turnkey basis
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Three (3) Sewage Treatment Plants of total capacity of 3.00 MLD (Srikakulam (Patrunivalasa) - 2.10 MLD, Amadalavalasa - 0.30 MLD, Rajam - 0.60 MLD) based ... under EPC system ...
Balance works of Investigation, Survey, Planning, Design, COnstruction and handing over of 1,536 EWS DUs / Flats (each of super builtup area of 300 Sft) in (G plus 3) pattern with Monolithic Concrete Construction (Shearwall Technology) and with ... under EPC system ...
Balance works of Investigation, Survey, Planning, Design, COnstruction and handing over of 1,536 EWS DUs / Flats (each of super builtup area of 300 Sft) in (G plus 3) pattern with Monolithic Concrete Construction (Shearwall Technology) and with ... under EPC system ...
Balance works of Investigation, Survey, Planning, Design, Construction and handing over of 2064 EWS DUs / Flats (Each of super builtup area of 300 Sft) in (G plus 3) pattern with Monolithic Concrete Construction (Shearwall Technology) and with ... under EPC system ...
Chilakaluripet Municipality - Sewage and Septage Management with construction of 5 MLD STP in Chilakaluripet under AMRUT Project 2016-20 - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage ... under EPC system
Vijayawada Division:Additions and altrations to OHE in connection with "Proposed Construction of Two lane Road Over Bridge of span in replacement of LC No.52 on BZA-BVRM section on NH 165 at KM .230+600 of including Improvement of Road from Km 12+200 ... on EPC between ...
Investigation, Design and Construction of APCRDA Project office in G+1 Building with Built Up Area of 55600 Sqft. With Earth work, pile foundation, precast Prestressed superstructure, Architectural, MEP, Fire fighting , PHE, HVAC, IT/BMS, Development ... under EPC system ...
Investigation, Design and Construction of Housing for Non Gazetted Officers Consisting of Total 1968 Apartment units in 22 towers of S + 12 Floors Pattern with BUA of 35,63,640 Sqft with Sub Structure, RC wall Super Structure using shear wall ... under EPC system ...
Investigation, Design and Construction of APCRDA Project office in G+1 Building with Built Up Area of 55600 Sqft. With Earth work, pile foundation, precast Prestressed superstructure, Architectural, MEP, Fire fighting , PHE, HVAC, IT/BMS, Development ... under EPC system ...
Machilipatnam Municipality - Sewage and Septage Management with construction of 5 MLD STP in Machilipatnam Municipality under AMRUT Project 2016-20 - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of ... under EPC system
Chilakaluripet Municipality - Sewage and Septage Management with construction of 5 MLD STP in Chilakaluripet under AMRUT Project 2016-20 - Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Sewage ... under EPC system
Balance works of Investigation, Survey, Planning, Design, Construction and handing over of 2064 EWS DUs / Flats (Each of super builtup area of 300 Sft) in (G plus 3) pattern with Monolithic Concrete Construction (Shearwall Technology) and with ... under EPC system ...
Civil, Electrical, Furniture and Supply of Capital Items
SYSTEM IMPROVEMENT PROJECT FOR SURVEY, DESIGN, SUPPLY, INSTALLATION, COMMISSIONING, CONFIGURATION AND INTEGRATION OF 2,094 NOS 3PH, 4W WHOLE CURRENT (20A-100A)/ CT OPERATED SMART/ DLMS METERS WITH BUILT IN MODEM OR EXTERNAL MODEM ON LV SIDE OF ... ON TURNKEY BASIS ...
Fixing of agency for "Extension of HT supply to M/s Homi Bhabha Cancer Hospital and Research Center, Plot No.212, Aganampudi village Gajuwaka Mandal Visakhapatnam Dist for a CMD of 1500KVA with connected load of 1350KW under HT Cat-II at 33KV ... partial Turnkey basis ...
Supply ,Erection, Testing and Commissioning of (i) 220/33 KV Pooling Stations with indoor switchgear at proposed 160MW Wind Solar Hybrid Project to be setup near Ramagiri, Ananthapuram District by M/s SECI and connected 220KV DC Line from 400 KV SS ... on turnkey basis
Supply, Erection, testing and commissioning of ( i) 220/33 kV GIS at Lingayapalem ,(ii) Laying of 220kV DC ,1000 Sqmm XLPE UG Cable from 400/220 KV GIS Tallayapalem to 220/33kV GIS Lingayapalem(8 KM) and (iii) Laying of 220kV DC ,1000 Sqmm XLPE UG ... on turnkey basis ...
Supply ,Erection, Testing and Commissioning of (i) 220/33 KV Pooling Stations with indoor switchgear at proposed 160MW Wind Solar Hybrid Project to be setup near Ramagiri, Ananthapuram District by M/s SECI and connected 220KV DC Line from 400 KV SS ... on turnkey basis
Supply erection Testing and Commissioning of 220 kV Switching Station with 2 no feeder bays and 1 no 220 kv metering bay at Indosol Solar Pvt Ltd near Karedu 220 kv DC line from existing 220 kv ss Kandukur to proposed 220 Kv Switching Station at ... on turnkey basis
Electrification of layout of Under STL Purpose with TURNKEY Basis Vide LPNo:88/ 2021/1167/VMRDA/DPMS to an extent of 7.1402 Acres in SyNo: 33/1p, 2p, 3, 4p, 5, 6p,7 to 13 and 34/1,2p, 4p in favour of M/s.PADMA MITRA CONSTRUCTIONS, Managing Partner. Sri. Jasti Rama Krishna at Kusulawada Locality / Village in Operation Section Anandapuram of Anandapuram Sub-Division in Zone-III Division of Visakhapatnam Circle
Supply, erection, testing and commissioning of (i) 132KV DC line (1.5KM) by making LILO of 132KV Gangavaram- Malkapuram Feeder-II at Loc.No.29(D+0) to the proposed 132KV metering bay at M/s Garrison Engineer, Utility-I(V),Naval base, Visakhapatnam ... on turnkey basis
Shifting of Utilities (APSPDCL) in Pulivendula - Parnapalli Road from Km 0/6 to 1/4 at Pulivendula, YSR Dist (Shifting of existing 33 KV, 11KV, LT lines with Distribution Transformers under various 11KV feeders which obstructing Road widening from ... under Turnkey basis ...
Distribution Network Strengthening works for reinforcement of existing 100Sqmm AAA Conductor with 157Sqmm Al 59 Conductor and erection of 33KV interlinking lines with 100Sqmm AAA Conductor and 157Sqmm Al 59 Conductor under existing 33KV networks in ... on Turnkey basis ...
Supply, erection, testing and commissioning of (i) 132KV DC line (1.5KM) by making LILO of 132KV Gangavaram- Malkapuram Feeder-II at Loc.No.29(D+0) to the proposed 132KV metering bay at M/s Garrison Engineer, Utility-I(V),Naval base, Visakhapatnam ... on turnkey basis
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Two (2) Sewage Treatment Plants of total capacity of 2.40 MLD (R.G.K Nagar - 0.90 MLD at Mangalagiri ULB in Guntur District, Uppucheruvu - 1.50 MLD at ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Three (3) Sewage Treatment Plants of total capacity of 6.40 MLD (Mallayapalem - 4.30 MLD at Gudiwada ULB,Rudhravaram - 1.60 MLD and Gosangam - 0.50 MLD at ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and commissioning of three (3) Sewage Treatment plants of total capacity of 3.00 MLD (Srikakulam (Patrunivalasa) - 2.10 MLD, Amadalavalasa - 0.30 MLD and Rajam - 0.60 MLD) ... under EPC system ...
Investigation, Design and construction of ANNA CANTEENS in 14 Municipal corporations and 24 Municipalities in Andhra Pradesh - Buildings and Anna Canteens with carpet area of 750 sqft each - total 163 Nos with internal, external & architectural ... under EPC system
Balance works of Investigation, Survey, Planning, Design, Construction and handing over of 2544 EWS DUs/flats (each of super built up area of 300 Sft) in G Plus 3 pattern with Monolithic concrete construction (Shear Wall Technology) and with suitable ... under EPC System ...
Investigation, Design and Construction of Housing for Gazetted Officers Type I & II,class IV Consisting of Total 1440 Apartment units in 21 towers of G + 12 Floors Pattern with BUA of 27,24,080 Sqft with Sub Structure, RC wall Super Structure using ... under EPC system ...
Investigation, Design and construction of ANNA CANTEENS in 14 Municipal Corporations and 24 Municipalities in Andhra Pradesh - Buildings and Anna Canteens with carpet area of 750 Sqft each - total 163 Nos with internal, external & architectural ... under EPC system
Investigation, Design and construction of ANNA CANTEENS in 14 Municipal Corporations and 24 Municipalities in Andhra Pradesh - Buildings and anna canteens with carpet area of 750 Sqft each - total 163 Nos with internal, external & architectural ... under EPC System
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Two (2) Sewage Treatment Plants of total capacity of 2.40 MLD (R.G.K Nagar - 0.90 MLD at Mangalagiri ULB in Guntur District, Uppucheruvu - 1.50 MLD at ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Five (5) Sewage treatment Plants of total Capacity of 5.00 MLD (Vizianagaram (Saripalli-1.50 MLD & Sonia Ngar-0.50 MLD), Saluru - 0.70 MLD, Nellimarla - ... under EPC system ...
investigation, Survey, Design, Supply, Construction, installation, Testing and Commissioning of Three (3) Sewage Treatment Plants of total capacity of 3.00 MLD (Srikakulam(Ptrunivalasa) - 2.10 MLD, Amadalavalasa - 0.30 MLD and Rajam - 0.60 MLD) based ... under EPC System ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Two (2) Sewage Treatment Plants of total capacity of 2.40 MLD (R.G.K Nagar - 0.90 MLD at Mangalagiri ULB in Guntur District, Uppucheruvu - 1.50 MLD at ... under EPC system ...
Supply, Erection Testing and commissioning of 132kv Switching station at Pedana, stringing of 3Ph 2nd Ckt from 132KV SS Machilipatnam to M/s RVK Energy at KonkePudi (12km),Erection of Metering Bay at RTSS Pedana, Erection of Multi circuit from M/s ... on turnkey basis
Supply,erection,Construction, testing and commissioning of 132/33 kV SS at Brahmamgarimattam, 132 kV DC radial line from upcoming 220/132 kV SS Porumamilla to proposed 132 kV SS at Brahmamgarimattam(15 kM) 2 Nos 132 kV Bays at 220/132 kV SS ... on Turnkey basis ...
Supply, Erection Testing and commissioning of 132kv Switching station at Pedana, stringing of 3Ph 2nd Ckt from 132KV SS Machilipatnam to M/s RVK Energy at KonkePudi (12km),Erection of Metering Bay at RTSS Pedana, Erection of Multi circuit from M/s ... on turnkey basis
Supply, Erection, Testing and commissioning of 132kv Switching station at Pedana, stringing of 3Ph 2nd Ckt from 132KV SS Machilipatnam to M/s RVK Energy at KonkePudi (12km),Erection of Metering Bay at RTSS Pedana, Erection of Multi circuit from M/s ... on turnkey basis
DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF DISTRIBUTION SYSTEM STRENGTHENING WORKS FOR ERECTION OF 2 NOS NEW 33 KV LINES UNDER 33KV KK MITLA and TR PALLI FEEDER AND 33KV MUPPAVARAM FEEDER IN DARSI AND ADDANKI DIVISIONS OF ONGOLE CIRCLE ... ON TURNKEY BASIS
Supply, Erection, Testing and commissioning of 132kv Switching station at Pedana, stringing of 3Ph 2nd Ckt from 132KV SS Machilipatnam to M/s RVK Energy at KonkePudi (12km),Erection of Metering Bay at RTSS Pedana, Erection of Multi circuit from M/s ... on turnkey basis
DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF DISTRIBUTION SYSTEM STRENGTHENING WORKS FOR ERECTION OF 2 NOs NEW 33 KV LINES UNDER 33KV SATTENAPALLI TOWN FEEDER IN NARASARAOPET DIVISION AND 33KV PASUMARRU FEEDER IN GUNTUR TOWN2 DIVISION WHICH ... ON TURNKEY BASIS