FID Signal board P No G3431-61820, TCD EPC Flow Cntrl Manfld G3432-60532, GC Oven Sensor P No G1530-61030, Universal PressFit Union P No 5190-6979, 6 port valve 225C P No G3450-83000, GI Insert Polymor Feet P No 5181-1270
Providing 3ph power supply to villages having population above 5000 in 13 Villages of Addanki division, Bapatla circle of APCPDCL by erecting 11KV Lines, 3Phase DTRs and LT Lines for socio economic upliftment of rural population on Partial Turnkey Basis
Investigation, Survey, Planning, Design, Construction and handing over of 5562 EWS DUs/Flats( each of super builtup area of 300 Sft), 6954 EWS DUs/Flats (each of super builtup area of 365 Sft) and 1391 EWS DUs/Flats (each of super builtup area of 430 ... under EPC System ...
Investigation, Survey, Planning, Design, Construction and handing over of 3648 EWS DUs/Flats (each of Super built-up area of 365 Sft) and 2432 EWS DUs/Flats (each of Super built-up area of 430 Sft) (Total 6080 EWS DUs/Flats) in G+3 pattern with VRCC ... under EPC system ...
Investigation, Survey, Planning, Design,Construction and handing over of 9797 EWS DUs/Flats(each of super builtup area of 300 Sft), 12249 EWS DUs/Flats (each of super builtup area of 365 Sft) and 2451 EWS DUs/Flats (each of super builtup area of 430 ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and handing over of 5284 EWS DUs/flats (each of super builtup area of 300 sft), 6607 EWS DUs/flats (each of super builtup area of 365 Sft) and 1322 EWS DUs/flats (each of super builtup area of 430 ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and handing over of 5,184 EWS DUs/flats (each of super builtup area of 300 Sft), 672 EWS DUs/flats (each of super builtup area of 365 Sft) and 672 EWS DUs/flats (each of super builtup area of 430 ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and handing over of 7,218 EWS DUs/flats (each of super builtup area of 300 Sft), 902 EWS DUs/flats (each of super builtup area of 365 Sft) and 902 EWS DUs/flats (each of super builtup area of 430 ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Eight (8) Sewage Treatment Plants of total capacity of 5.40 MLD (Madepalli - 0.10 MLD, Ponangi road - 2.60 MLD, Kotturu road - 0.50 MLD in ELuru ULB, ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and handing over of 8,016 EWS DUs/flats (each of super builtup area of 300 Sft), 1,008 EWS DUs/flats (each of super builtup area of 365 Sft) and 1,008 EWS DUs/flats (each of super builtup area of ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and handing over of 8,889 EWS DUs/Flats (each of super built up area of 300 Sft.), 11,112 EWS DUs/Flats (each super built up area of 365 Sft.), 2,221 EWS DUs/Flats (each super built up area of 430 ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Eight (8) Sewage Treatment Plants of total capacity of 9.90 MLD (Purushottapatnam - 2.80 MLD in Chilakaluripeta ULB, Nidubrolu - 1.20 MLD in Ponnuru ULB, ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Eight (8) Sewage Treatment Plants of total capacity of 5.40 MLD (Madepalli - 0.10 MLD, Ponangi road - 2.60 MLD, Kotturu road - 0.50 MLD in ELuru ULB, ... under EPC system ...
Investigation, Survey, Planning, Design, Construction and handing over of 691 EWS DUs/Flats (each of Super built-up area of 365 Sft) and 461 EWS DUs/Flats (each of Super built-up area of 430 Sft) (Total 1152 EWS DUs/Flats) in G+3 pattern with VRCC ... under EPC system ...
Supply Erection Testing Commissioning (i) 220KV DC/SC Line (18KM) from 220KV Boksamplli to M/s KIA Motors Switching Station at Erramanchi (ii) 1 No 220KV Bay Extension at 220KV Boksampalli SS (III)Erection of 220KV DC/SC Line(13KM) from 220KV ... on Turnkey basis ...
SHIFTING OF 33 KV, 11 KV,LT LINES AND DTR s BY DISMANTLING OF OLD LINES ,DTRs AND ERECTING THE NEW LINES ACROSS THE PROPOSED ROADS IN AMARAVATHI DEVELOPMENT CORPORATION LIMITS ,CRDA IN OPERATION SECTION, D2 MANGALAGIRI OF Guntur TOWN-2 DIVISION AT ... SEMI TURNKEY BASIS ...
Supply, Erection, Testing and Commissioning of 1. 1No. new 100MVA Auto Transformer Bay at Dr.NTTPS Switchyard 2. 1 No. 132 KV Bay extension at 132KV SS Bhavanipuram, Dr. NTR District for newly proposed 132KV Dr. NTTPS-Bhavanipuram Feeder and 3. ... on turnkey basis
Extension of HT supply in favour of the Executive Engineer/PIPHW Division No.4/Polavaram CHLIS Project Division No.2, Chintalapudi for Polavaram Project Spillway Gates Operation for a CMD of 4000 KVA with a CL of 4000KW at Devaragondi Village in ... (Partial Turnkey basis)
Survey, Design, Supply, Installation, Commissioning of 3No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circle, Anantapur on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 6No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circles, Nellore on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 3No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circle, Chittoor on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 3No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circle, Tirupati on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 3No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circle, Chittoor on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 3No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circle, Tirupati on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 4No. 33/11KV Outdoor Sub-stations with its connected 33KVand 11KV Lines in operation circles, Kadapa and Nandyala on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Providing of 220/33KV Features by erecting 2 No's 220/33KV 80MVA PTRs at existing 220/132/33KV Parawada SS, Associated works of extension of the existing 220KV Bus with Bus Sectionalizer Scheme in Parawada, Anakapalli District under System ... on turnkey basis
Survey, Design, Supply, Installation, Commissioning of 6Nos. 33/11KV Outdoor Sub-stations with its connected 33KV and 11KV Lines in operation circle, Annamayya on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 6No. 33/11KV Outdoor Sub-stations with its connected 33KV and 11KV Lines in operation circles, Chittoor on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Investigation, Survey, Design, Supply, Installation, Testing and Commissioning of nine (9) Sewage Treatment Plants with a total capacity of 10.80MLD (Purushothampatnam - 2.80MLD at Chilakaluripeta ULB, Nidubrolu - 1.20MLD at Ponnuru ULB, Chinaravuru ... under EPC system ...
Investigation, Survey, Design, Construction, Installation, Testing and Commissioning of Seventeen (17) Sewage Treatment Plants of total capacity of 8.10 MLD (Parawada - 0.30 MLD, Aganampudi - 0.20 MLD, Rathicheruvu - 0.20 MLD, Satyanarayanapuram - ... under EPC System ...
Investigation, Survey, Planning, Design,Construction and handing over of 2003 EWS DUs/Flats(each of super built up area of 300 Sft)7,011 EWS DUs/Flats(each of super builtup area of 365 Sft) and 1002 EWS DUs/Flats (each of super builtup area of 430 ... under EPC System ...
Investigation, Survey, Design, Supply, Installation, Testing and Commissioning of nine (9) Sewage Treatment Plants with a total capacity of 10.80MLD (Purushothampatnam - 2.80MLD at Chilakaluripeta ULB, Nidubrolu - 1.20MLD at Ponnuru ULB, Chinaravuru ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing & Commissioning of Seventeen (17) Sewage Treatment Plants of total capacity of 8.10 MLD (Parawada - 0.30 MLD, Aganampudi - 0.20 MLD, Rathicheruvu - 0.20 MLD, ... under EPC system ...
Supply, Erection, Testing and Commissioning of i) 132 kV DC line (0.5 Km) by making LILO of existing 132KV Kandukur-Kavali SC line between Loc.No:264-266 to 132/33KV SS Ulavapadu ii) Replacement of ACSR Lynx Conductor with ACSS Lynx Conductor on ... on turnkey basis
Supply, Erection, Testing & Commissioning of 4Nos. 33KV Feeder Bays at various EHT Sub-Stations in O&M Circle, Nellore i.e., (i) 1No. 33KV Feeder Bay (Kota Feeder) at 132/33KV Sub-Station Chendodu (ii) 1No. 33KV Feeder Bay (Rajiv Nagar Feeder) at ... on Turnkey Basis ...
Supply, Erection, Testing & Commissioning of 4 Nos. 33KV Feeder Bays at various EHT Sub-Stations in O&M Circle, Nellore i.e., (i) 1No. 33KV Feeder Bay (Kota Feeder) at 132/33KV Sub-Station Chendodu (ii) 1No. 33KV Feeder Bay (Rajiv Nagar Feeder) at ... on Turnkey Basis ...
Survey, Design, Supply, Installation, Commissioning of 3Nos. 33/11KV Outdoor Sub-stations with its connected 33KV and 11KV Lines in operation circles,Tirupati and Kadapa on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 6No. 33/11KV Outdoor Sub-stations with its connected 33KV and 11KV Lines in operation circles, Nandyal and Kurnool on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Survey, Design, Supply, Installation, Commissioning of 6No. 33/11KV Outdoor Sub-stations with its connected 33KV and 11KV Lines in operation circles, Anantapur and Sri Sathya Sai on Semi - Turnkey basis (PTR, DTR and VCBs will be supplied by Dept.) with financial assistance from M/s. REC Ltd.,
Investigation, Soil exploration, Preparation of Designs, Drawings and Detailed Estimates including necessary clearances for Construction of 3 Regulators across Upputeru river under Kolleru Salinity Mitigation Project i.e. i) Construction of Regulator ... under EPC System
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Thirteen (13) Sewage Treatment Plants of total capacity of 11.50MLD (Kondruprolu Site-I - 2.00MLD, Kondruprolu Site-II - 0.50MLD, Kondruprolu Site-III - ... under EPC system ...
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Seventeen (17) Sewage Treatment Plants of Total capacity of 8.10 MLD (Parawada - 0.30 MLD, Aganmpudi - 0.20 MLD, Rathicheruvu - 0.20, Satyanarayanapuram - ... under EPC system ...
Investigation, Soil exploration, Preparation of Designs, Drawings and Detailed Estimates including necessary clearances for Construction of 3 Regulators across Upputeru river under Kolleru Salinity Mitigation Project i.e. i) Construction of Regulator ... under EPC System
Supply,Erection,Testing and commissioning of 1) 220/132/33KV SS Tiruvuru including SAS 2) 220KV SC line (5KM) by making 220-KV LILO of th eexisting 220KV KTPS-NUnna line to proposed 220/132/33KV ss Tiruvuru 3) 132KV DC line (15KM) from 132KV SS ... on turnkey basis ...
Supply, Erection, Testing and Commissioning of 4 Nos. 33KV Feeder Bays at various EHT Sub-Stations in O&M Circle, Nellore i.e., (i) 1No. 33KV Feeder Bay (Kota Feeder) at 132/33KV Sub-Station Chendodu (ii) 1No. 33KV Feeder Bay (Rajiv Nagar Feeder) at ... on Turnkey Basis ...
Supply, Erection, Testing and Commissioning of (i)132KV DC/SC line (4.3KM) from existing 132KV SS Kothapalli to proposed 132KV RTSS Kalasamudram. (ii)1 No. 132KV Feeder Bay at existing 132KV LIS SS Kothapalli for proposed 132 KV RTSS Kalasamudram ... on turnkey basis.
Supply, Erection, Testing and Commissioning of (i) Making LILO of 132 KV Pithapuram-Koruprolu SC line on Multi circuit towers to the proposed 400/220/132/33 KV Kakinada SEZ SS. ii) 132 KV DC/SC line and UG cable from proposed 400/220/132/33 KV SS to ... on turnkey basis.
Supply, Erection, Testing and Commissioning of (i) Making LILO of 132 KV Pithapuram- Koruprolu SC line on Multi circuit towers to the proposed 400/220/132/33 KV Kakinada SEZ SS. ii) 132 KV DC/SC line and UG cable from proposed 400/220/132/33 KV SS to ... on turnkey basis.
Supply, Erection, Testing and Commissioning of (i)132KV DC/SC line (4.3KM) from existing 132KV SS Kothapalli to proposed 132KV RTSS Kalasamudram. (ii)1 No. 132KV Feeder Bay at existing 132KV LIS SS Kothapalli for proposed 132 KV RTSS Kalasamudram ... on turnkey basis
Supply and Erection of 2Nos. 33/11KV Semi Indoor AND 5Nos. 33/11KV Outdoor Substations along with connected 33KV & 11KV lines on Partial Turnkey basis (PTRs, DTRs, Outdoor VCBs, 24V DC Batteries with Chargers, 100Sq.mm & 55Sq.mm AAAC Conductors will be supplied by APEPDCL) in Srikakulam,Visakhapatnam, Anakapalli & West Godavari Circles of APEPDCL