Loading…
Loading…
1,521 results • Best match
Investigation, Survey, Planning, Design, Construction and handing over of 4128 EWS DUs/Flats (each of super builtup area of 300 sft), 5616 EWS DUs/Flats (each of super builtup area of 365 Sft) and 1008 EWS DUs/Flats (each of super builtup area of 430 ... under EPC System ...
Investigation Soil exploration, Preparation of Designs, Drawings & Detailed Estimates including necessary clearances for Construction of 3 Regulators across Upputeru river under Kolleru Salinity Mitigation Project i.e. i) Construction of Regulator ... under EPC System ...
Supply, Erection, Construction, Testing and Commissioning of (i) 132/33 kV Gas Insulated Sub Station in the existing ERO premises of APSPDCL at Moghalrajpuram,(ii) Supply and Laying of 132 KV 630 sq mm XLPE U/G Cable (Double Circuit) with associated ... on turnkey basis ...
Supply, Erection, Testing and Commissioning of 10 Nos. 33 KV bay extensions at various EHT substations in O and M Circle, Tirupathi ( 2 Nos. at 132 KV SS Punganur, 1 No. at 132 KV SS Nagari, 2 Nos. at 220 KV SS Palamaneru, 1 No. at 132 KV SS ... on Turnkey basis
Supply, Erection, testing and Commissioning of 10 Nos. 33 KV bay extensions at various EHT substations in O and M Circle, Tirupathi ( 2 Nos. at 132 KV SS Punganur, 1 No. at 132 KV SS Nagari, 2 Nos. at 220 KV SS Palamaneru, 1 No. at 132 KV SS ... on Turnkey basis
Survey, Design, Supply, Installation, Commissioning of 4No.33/11KV Semi- Indoor Sub-stations and 3Nos. 33/11KV Indoor Sub-stations with connected 33KVand 11KV Lines in operation circles, Tirupati, Kadapa, Sri Sathya Sai and Kurnool on Semi - Turnkey basis (PTR and DTR are Dept. Supply) with financial Assistance of M/s. REC Ltd., New Delhi
Extension of HT supply with CMD of 3000KVA CL 3000 KW at Rajamahendravaram Main Bus Deport in Operation Section Alcot Gardens of Rajamahendravaram Town Division in East Godavari District under HT Category-II C Electric Vehicles - Charging stations at ... Partial Turnkey basis
Investigation, Survey, Design, Supply, Construction, Installation, Testing and Commissioning of Fifteen (15) Sewage Treatment Plants of total capacity of 14.60 MLD (Kondruprolu Site-I - 2.00 MLD, Kondruprolu Site-II - 0.50 MLD, Kondruprolu Site-III - ... under EPC system ...
Request for Selection (RfS) of EPC Contractor/RTS Vendor for Design, Engineering, Supply, Installation, Testing and Commissioning and O and M for 5 Years of total capacity of 93.20 MWp Grid-Connected Rooftop Solar Plants with 2 kWp capacity each for 39,215 BC and 7,381 OC Domestic Consumers (200 U) through Utility Led Aggregation (CAPEX) Model under PMSG:MBY scheme in the jurisdiction of RESCO, Kuppam (KRECS)
Investigation Survey Design and Construction of 20 Nos of Nature based Sewage Treatment Plants NSTPs under Package-II with Cumulative Capacity of 3.013 MLD at various ULBs in the State of Andhra Pradesh based on Modern Technology with three months ... Period EPC Tender
Design,Engineering,manufacturing , testing before dispatch loading , supply for destination including transportation, civil & construction works, erection, testing and commissioning of a) Chilakaluripeta 400/220/132kV substation with 2 x 500MVA PTRS ... on Turnkey Basis
Design,Engineering,manufacturing , testing before dispatch loading , supply for destination including transportation, civil & construction works, erection, testing and commissioning of a) Chilakaluripeta 400/220/132kV substation with 2 x 500MVA PTRS ... on Turnkey Basis
Investigation, Survey, Planning, Design, Construction and handing over of 6,992 EWS DUs/Flats (each of super built-up area of 300 Sft), 8,740 EWS DUs /flats (each of super built-up area of 365 Sft) and 1,748 EWS DUs/flats (each of super built-up area ... under EPC system ...
(i) Supply, Erection, Construction, Testing and Commissioning of 220/ 132/ 33 kV GIS Medha Towers IT Park Gannavaram in, (ii) Supply and Laying of 220 KV, 1000 sq.mm XLPE U/G Copper Cable (Double Circuit) with Associated accessories including ... on turnkey basis ...
Supply, erection, stringing, testing and commissioning of i).New 132 KV 3- Ph DC line in place of existing 132KV Tadepalli Traction 2- Phase DC line from Booms at 132KV SS Tadepalli to Boom at proposed new RTSS Tadepalli, ii). 2 Nos.132 KV Line Bays ... on Turnkey Basis ...
Supply of materials, erection, stringing testing and commissioning of i).new 132 KV 3- Phase DC line in place of existing 132 KV Bapatla Traction 2-Phase DC line from Booms at 132 KV SS Bapatla to Boom at proposed new RTSS Bapatla, ii).2Nos. 132kV ... on Turnkey Basis ...
Supply of materials, erection, stringing, testing and commissioning of i).New 132 KV 3- Ph DC line in place of existing 132KV Tenali Traction 2- Phase DC line from Booms at 132KV SS Tenali to Boom at proposed new RTSS Tenali, ii). 2 Nos.132 KV Line ... on Turnkey Basis ...
Supply, erection, testing and Commissioning of (i) 132/33kV Substation at Sri City, Satyavedu Mandal in Tirupati District (ii) 132kV DC line from 220/132kV SS Racherla to proposed 132/33kV SS Sri City, duly stringing 2Nos. circuits on existing 132kV ... on turnkey basis.
Supply, Erection, Testing and commission of (i) 2nd Ckt stringing from Loc No.17 of 132 kV Brandix-Naval Base(10.574 km) and Laying of 132 kV UG Cable from 220 kV Atchuthapuram to CTT (0.3 km) and Stringing from CTT to Loc No.17(0.1 km) of 132 kV ... on turnkey basis
Extension of HT supply for Additional CMD of 500 KVA with a CL of 400 KW in addition to the existing CMD of 3000 KVA with a CL of 4000 KW total CMD of 3500 KVA with a CL of 4400 KW in addition to the existing CMD of 4400 KW to SC No.HTVZM 701, M/s ... 100% turnkey basis
Supply, Erection, Testing and Commissioning of i) 132 kV DC line (0.5 Km) by making LILO of existing 132KV Kandukur-Kavali SC line between Loc.No:264-266 to 132/33KV SS Ulavapadu ii) Replacement of ACSR Lynx Conductor with ACSS Lynx Conductor on ... on turnkey basis