Loading…
Loading…
1,692 results • Best match
Consultancy Services as AE for Supervision of) Construction of Four Lane Panchgram Bypass and Construction of Four Lane Badarpur Bypass in the State of Assam on EPC Mode
Consultancy services for AE for Supervision of 4-Laning of NH-37 from Nagaon By-pass to Jia Bharali on EPC mode on NH-37 A(4th call)
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At TEKELANJUN SC in Karbi Anglong District.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At SILIMKHUWA SC in Karbi Anglong District.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At Ganeshpather SC in Karbi Anglong District.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At RONGMONGVE SC in Karbi Anglong District.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At DEITHOR SC in Karbi Anglong District.
Supply, Installation and Commissioning of Branded Two Nos of 32 Sq ft Outdoor Full-colour LED Display Boards at Two locations within Pathsala Municipal Area for Catch the Rain Campaign, IEC Activities and Revenue Augmentation Initiatives on Turn Key
Eddy current Array Testing Equipment on turnkey basis
Widening Improvement to 4 (Four) Lane with Paved Shoulder with proposed Daboka Bypass of Daboka -Parokhaowa (Package-1) of NH 29 in the state of Assam on EPC mode.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2022-23 48 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At BADONG SC in West Karbi Anglong District
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At BORNERIA RONGKHANG GAON SC in Karbi Anglong District.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2022-23 48 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At BOROLALBONG FW SC in Dima Hasao District
Construction of Sub Centres with Prefabricated steel structure, brick work in foundation, 112 mm thick brick walling at various places of Assam Pkg No.NSC-F Balance work of 2 no. Shyampur (Dimboswar) in Darrang District) under NRHM on Turn Key Basis.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2022-23 48 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At Borthol SC in West Karbi Anglong District
Construction of Balance Work of the 4- laning of Jamugurihat to end of Biswanath Chariali Bypass of NH- 15 from Km 182.000 to Km 208.000 (26 Km), under SARDP-NE, under EPC Mode at the Risk and Cost of EPC Contractor
Construction of Balance Work of the 4- laning of the Section from Rangagara to KaliaborTiniali of NH- 37 (Old) from Km 297.000 to Km 315.315 (18.315 Km), under SARDP-NE, at the Risk and Cost of EPC Contractor on EPC mode
Construction of Sub Centres with Prefabricated steel structure , brick work in foundation, 112 mm thick brick walling at various places of Assam under NHM on Turn Key Basis, pkg no. NSC-G2 (Balance work of 4 nos. of SC in Goalpara District.
Development of External Trunk Connectivity and Internal Infrastructure Works at Multi Model Logistics Park at Jogighopa in the state of Assam on EPC Mode (Package I Road and Utility Works)
Construction of Balance Work of the 4- laning of the Section from Jhanji to Demow of NH-37 Pkg- IV Structures and Toll Plaza under SARDP- NE, under EPC Mode.
Turnkey job for procurement of Horizontal Autoclave for CSSD of Dr.B.Borooah Canver Institute,Gopinath Nagar,Guwahati-16
Furniture and Other Fittings on Turnkey Installation Basis (Q3)
Four laning from Biswanath Chariali by-pass (Km 208.00 to Gohpur Km 265.50 (Total length 57.50) in the state of Assam on EPC basis
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH 37 Old Pkg IV Structures and Toll Plaza under SARDP-NE under EPC Mode
Construction of New Two-Lane Bridge with its approaches from Km 0.000 to Km 4.385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode
Turnkey works for Digital Xray room of Dr B Borooah Cancer Institute Guwahati16
EPC for ground mounted solar power project at North Guwahati Bottling Plant
Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP-NE Phase A on EPC Mode
Construction of Jia Bharali Bridge along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715) in the State of Assam on EPC Mode
RFP for Earthwork in formation and in cutting, blanketing, construction of RCC box, RCC and PCC drains, retaining walls, toe walls, nine (9) numbers minor bridges, one (1) number Road Over Bridge (ROB), Railway Electrification works including design, ... Hybrid- EPC mode .
Set up of VRDL Lab at AIIMS Guwahati on Turnkey Basis
Panel Board with assembling and installation in turnkey basis- 2 nos
FURNISHING OF NIPER GUWAHATI GUEST HOUSE ON LUMPSUM TURNKEY BASIS (LSTK)
SELECTION OF AN AGENCY FOR TURNKEY DEPLOYMENT OF INDUSTRY 4.0 ECOSYSTEM
UTILITIES OF TIES AND GMP EXTRACTION FACILITY ON LUMPSUM TURNKEY BASIS
Construction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode
Construction of Balance Work of the 4- laning of the Section from Jhanji to Demowof NH-37 Pkg-II Road Works fromKm 501.800 to Km 514.800 (13.000 Km), under SARDP- NE , under EPC Mode.
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 Pkg-I Road Works from Km 490.800 to Km 501.800 under SARDP- NE under EPC Mode.
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old) Pkg-II Road Works from Km 463 to Km 477 (14.000 Km) under EPC Mode
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demowof NH-37 Pkg-III Road Works from Km 514.800 to Km 534.800 (20.000 Km),under SARDP- NE , under EPC Mode.
Turnkey construction of 33kV Feeder Bay along with associated works at 132kV Sishugram GSS for power supply to National Data Centre
Supply of Diesel Pump-set and Installation of STW on Turnkey basis
12 Bedded PCU Brown Field on turnkey basis at Arunachal Pradesh (Q3)
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km of the Sagunbashi forest (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode
Widening / Improvement to 4 (Four) Lane with Paved Shoulde configuration of existing single lane road of Srirampur - Dhubri Section of NH-127B (Design Km 0.000 to Km 27.650), on EPC Mode in the State (Package-I)
TURNKEY PROJECT
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old) Pkg-III Road Works from Km 477.000 to Km 490.800 (13.800 Km), under SARDP-NE, under EPC Mode
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old) Pkg-I Road Works from Km 453.000 to Km 463.000 (10.000 Km), under SARDP-NE, under EPC Mode
Widening/Improvement to 4 Lane with Paved Shoulder from km 66.000 to km 81.000 (Design Chainage 65.923 to 80.930) of Dokmoka LoringThepi Section3 of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode
Strengthening of Joypur SD in Dibrugarh District under NHM, Assam on Turn Key Basis