Loading…
Loading…
1,692 results • Best match
Development of Internal Infrastructure Works at Multi Modal Logistics Park at Jogighopa in the state of Assam on EPC Mode (Package-II) Second Call
Improvement and Upgradation of Road from Balichapori, Majuli to Bongalmara, Lakhimpur, including construction of two major bridges over Luit and Subansiri rivers on EPC mode under ASRIP
Construction of 4-lane Extradosed PSC Bridge over river Brahmaputra connecting Palashbari and Sualkuchi including Viaduct, Approaches and River Training works etc on EPC mode
Simulation Lab Set up on Turn Key basis
Construction of Proposed Solid Waste Management Plant at Silchar ULB of Assam Establishment and Commissioning of Material Recovery Facility MRF an Waste to Compost Plant W2C under SBM on Engineering, Procurement and Construction EPC Mode 1 Basis
Construction of Integrated Sports Complex at Hazarapara (Including Waterfront development and Bird observatory Tower, Tezpur (Assam) under CIDF for the year 2021-22 on EPC mode
Stage Strengthening from Km 672.00 to 686.608 of NH- 37 in the state of Assam under EPC mode under Dibrugarh NH Division under AP 2019-20.
Design, Construction of Civil Works, Sanitary and Plumbing works, Horticulture Works, E and M works i.e. Internal Electrical Works for the CVSc, AAU, Khanapara auditorium
"Providing project management services Engineering, Procurement and Construction (EPC) contracts and other works contracts ( Item rate contracts) for Doubling Project between Agthori station (km 393.380) to Kamakhya station (km 401.120) including ... " Engineering , ... "Engineering, Procurement and Construction (EPC) ... ( EPC ) ...
Design, Supply, Installation, Testing, Commissioning AND Maintenance (1 year Warranty period PLUS 2 years ofComprehensive Annual Maintenance Contract (CAMC)) of Conveyor Belt System at BADARPUR TERMINALon EPC mode
Establishment of New Govt. Nursing College at Jorhat, Assam for the financial year 2022-23 under the Scheme of NEC-reg on Engineering, Procurement (EPC) Mode-1 Basis)
Food Processing Plant with Cold Storage Facility at Goladangi Kokrajhar in Assam under BTC Package on EPC Mode-I of contract - Single stage two-part bidding system. TN_57_01R
Design and Construction of a pump house and installation of 2 nos. x 1700 LPS capacity M.F. pumps with allied infrastructures near Bonda Sluice Gate on EPC mode
Design, Construction, Fabrication, Erection, Installation, Testing and Commissioning of Two Steel Gangway Structure with Yoke System at Pandu Terminal on EPC mode (one at upstream of Collapsible Jetty)
Design, Construction, Fabrication, Erection, Installation, Testing and Commissioning of Two Steel Gangway Structure with Yoke System at Pandu Terminal on EPC mode (one at downstream of Collapsible Jetty)
Stage Strengthening from Km 0/00 to Km 30/00 of NH-39(old) in the State of Assam under Golaghat NH Division under EPC Mode under AP 2019-20.
Implementation of Smart Water Management System for Tezpur 24 x 7 Water Supply Project Phase I under Amrut 2 in Assam including 5 years Operation and Maintenance on EPC Mode
Supply, Turn-Key Installation and Commissioning Of Tenacity and Elongation Tester
Supply, Turn-Key Installation and Commissioning of Hydraulic Hot Press Machine
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for Balance work of Construction of Sub-Structure and Super-structure of Major Bridge No. 5 (5X12.2M - PSC Slab at Ch.13.400 km), Bridge No. 9 (3x12.2 -PSC Slab at Ch 20.602 ... on EPC mode .
Strengthening with widening to paved shoulder from km 46 to km 54 of NH-39(old) in the state of Assam under EPC mode Job no. 39/AS/2021-22/208.
CONSTRUCTION OF CONNECTING ROADS TO IMB FENCE (33.00 KM) ALONG INDO-MYANMAR BORDER FROM BP-164 TO BP-166 IN TIRAP AND CHANGLANG DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
Construction of Passenger Terminal Building Warehouse Cargo Administrative Building and external development and allied services on EPC Mode (Design and Build Basis) at ICP Sutarkandi Kareemganj Assam on Indo Bangladesh Border.
Construction of Long Term Measures for 3 Nos. of Black Spots Locations at Sundari, Kishanbazar and Manikpur in the state of Assam on EPC basis.
Stage Strengthening from Km. 42/000 to Km. 52/000on NH-37(Old)/ 17(New) for the year 2019-20 under Guwahati NH Division in the State of Assam under EPC mode.
Construction of Pump House at Silsako Beel and increasing the discharge capacity of Bahini flow from Pibco point to Silsako Beel Package-1 on EPC basis
Construction of Pump House at Silsako Beel and increasing the discharge capacity of Bahini flow from Pibco point to Silsako Beel Package-2 on EPC basis
Construction of Extradosed PSC Bridge over River Brahmaputra connecting Guwahati and North Guwahati including viaduct and approaches, etc on EPC mode
Design, Supply, Installation, Testing, Commissioning and Maintenance (1 year Warranty period plus 2 years of Comprehensive Annual Maintenance Contract (CAMC)) of Weigh-Bridge and other allied works at JOGIGHOPA TERMINAL on EPC mode
Stage strengthening of NH-61 from Km.239/959 to Km.257/469 (Length- 17.510 Km.) for the year 2019-20 under Jorhat NH Division in the state of Assam under EPC Mode.
Construction of New Bridge over river Krishnai (Br. No.-34/1) on NH-17 (Old NH-37) under Guwahati NH Division under A.P. 2019-20 in the state of Assam under EPC mode.
Construction of Regional Research Institute for Homeopathy and Integrated Ayush Wellness Centre at Guwahati, Assam including internal and External Civil services, electrical and Mechanical services and external development work on EPC mode -III
Supply, turn-key installation and commissioning of food processing plant of multipurpose application
Stage strengthening from km.100/00 to km. 134/00 on NH-37 (Old)/ NH-17 (new) for the year 2019-20 under Guwahati NH Division in the State of Assam under EPC mode.
Construction of a New Bridge over river Kuthori (Br.no-352/1) on NH-715 (Old NH-37) in the state of Assam under EPC mode- Job No. Br.352/1/AS/2021-22/222
ESTABLISHMENT CONSTRUCTION SUPPLY PROCUREMENT FABRICATION ERECTION OF MACHINERIES TRIAL RUN AND COMMISSIONING OF MRF AND WASTE TO COMPOST PLANT AT DOOMDOOMA AS PER SWM RULES 2016 UNDER SBM U ON ENGINEERING ON EPC MODE
Periodical Renewal to NH-15 (Old NH-52) from km 100.00 to 109.00 for the year 2019-20 in the State of Assam on EPC mode. (Job. TA/015/AS/2019-20/152) (RETENDER)
Construction of Administrative building at Toll Plaza (Km.1017.350 near Galia) and other works of Kalijhar-Patacharkuchi section from 1013.000 to Km.1040.300 of NH-27 in the state of Assam on EPC Mode
Turn Key Installation for Air Conditioning Units along with Aluminium Composite Panel Cladding (Q3)
Const. of Ropeway System over the river Brahmaputra connecting Biswanath Ghat and Umatumoni Island at Biswanath Ghat of Biswanath District, Assam on EPC mode, including Defect Liability cum Comprehensive Operation and Maintenance period for three
ESTABLISHMENT CONSTRUCTION SUPPLY AND PROCUREMENT FABRICATION ERECTION OF MACHINERIES TRIAL RUN AND COMMISSIONING OF MATERIAL RECOVERY FACILITY MRF AND WASTE TO COMPOST W2C PLANT AT SIVASAGAR UNDER SBM U ON EPC MODE UNDER 15TH FC
Construction of Boundary wall, Guard Room at Export zone and Repair of Boundary wall at BTC-2 for Development of Integrated Check Post at ICP Sutarkandi on Indo-Ban Border EPC Mode Design and Build Basis
Stage strengthening from Km.29.200 to 38.000 (Total Length 8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/2019-20/197)
To Select an Agency for Establishment and Commissioning of Material Recovery Facility (MRF) and Waste to Compost Plant (W2C), on EPC Mode-1 basis to customize the plant according to size of available land at KARIMGANJ, ASSAM
CONSULTANCY SERVICES FOR PREPARATION OF FS AND DPR FOR CONSTR OF RAIL CUM HIGHWAY UNDER WATER TUNNEL INCLUDING APPROACH RD ACROSS MIGHTY RIVER BRAHMAPUTRA, APPROXIMATELY IN BET PACHIGAON (JAMUGURI) AND KALIABOR TEA ESTATE (SILGHAT) THROUGH EPC MODE
CONSTRUCTION OF ROAD NEW GNARCHHIP TO INDO MYANMAR BORDER FROM KM 0.00 TO KM 14.658 TO CONNECT COBS OF ASSAM RIFLES IN HNAHTHIAL DISTRICT UNDER 74 RCC /24 BRTF/ PROJECT PUSHPAK IN MIZORAM STATE THROUGH EPC MODE
Construction of Long Term Measures for 4 Nos. of Black spots at Tihu, Society Chowk, Changsari Madanpur and Daboka under RO Guwahati in the State of Assam on EPC basis
as per boq attached
Stage strengthening from km.928/00 to 938/00 (Total length - 10.00km) of NH-17 (new)/NH-31 (old) under Abhayapuri Construction Division ,Abhayapuri for the Annual Plan 2019-20 in the State of Assam under EPC mode.
PMC for a Ropeway project viz-Const of Ropeway System over the river Brahmaputra connecting BiswanathGhat and Umatumoni Island of Biswanath District, Assam on EPC mode, including Defect Liability cum Comprehensive O and M period for 3 yrs