Loading…
Loading…
1,692 results • Best match
Construction of BPHU at Sapekhati BPHC in Charaideo District for FY 2022 23 under PM ABHIM on Turn Key Basis
Construction of BPHU at PATHARKANDI BPHC in KARIMGANJ District for FY 2022 23 under PM ABHIM on Turn Key Basis
Construction of BPHU at Chamata BPHC in Nalbari District for FY 2021 22 under PM ABHIM on Turn Key Basis
Construction of BPHU at Demow BPHC in Sivasagar District for FY 2021 22 under PM ABHIM on Turn Key Basis
Construction of BPHU at BONGAIGAON BPHC in BONGAIGAON District for FY 2021 22 under PM ABHIM on Turn Key Basis
Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra and Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC Basis
Tezpur Water Supply Scheme Phase II under AMRUT 2 on EPC mode
Construction of BPHU at Uparhali BPHC in Kamrup R District for FY 2021 22 under PM ABHIM on Turn Key Basis
Construction of BPHU at Bokajan BPHC in karbi Anglong District for FY 2021 22 under PM ABHIM on Turn Key Basis
Construction of BPHU at Kamarbandha Ali BPHC in Golaghat District for FY 2021 22 under PM ABHIM on Turn Key Basis
Construction of BPHU at CHAYGAON BPHC in Kamrup R District for FY 2022 23 under PM ABHIM on Turn Key Basis
Design and Construction of Road as Part af ICBR Works from Y Jn Sungetsar Jesmi Rock to Cheema Karpola Bet Km 0pt000 to Km 18pt590 Net Length 18pt590 Km Through EPC Mode of Execution to include Fmn Works Pmt Works and Surf Works in area of responsibi
Strengthening of pavement and widening of 1.5 m paved shoulder on either side and strengthening NH-39 under Annual Plan for the year of 2018-19 under Golaghat NH Division in the State of Assam on EPC Mode. (Job No. 039/AS/2018-19/186)(RT)
Strengthening of existing 2 lane (Total Length-35.00 km of NH-52(New NH-15) under Annual Plan for the year of 2018-19 under Nagaon NH Division, Nagaon in the State of Assam on EPC mode, Job No 052(New NH-15)/AS/2018-19/185)
Stage Strengthening from km 411/000 to 419/900 and from km 420.00 to 437.00(L-25.90km) of NH-52 (New NH-15) under Annual Plan for the year 2019-2020 on EPC Mode in the State of Assam, Job no 052/AS/2020-21/210
Upgradation of Existing NH-115 from 2-lane Configuration to 2-lane with Paved Shoulder from km 44.369 to km 54.806 (L 10.437 km) in Tinsukia District under Dibrugarh NH Division in the state of Assam under EPC mode (Job No. 115/AS/2024-25/283)
DESIGN AND CONSTRUCTION OF CL 9 ROAD AS PART OF ICBR WORKS FROM BANGA JANGA GOMPA BJG TO NAGA GG NGG BETWEEN CHAINAGE KM 20PT00 TO KM 54PT00 NET LENGTH 36PT694 KM THROUGH EPC MODE OF EXECUTION TO INCLUDE FORMATION PERMANENT AND SURFACING WORKS IN ARE
Strengthening of 2 lane with paved shoulder of NH-54 from 12th km to 40th km(Length-22.20 km) under Annual plan for the year 2018-19 under EPC mode under PWD, NH Division, Silchar in the state of Assam, Job.054/AS/2018-19/184
CONSTRUCTION OF NELYA PT 4340 RC ROAD FROM KM 0.000 (STARTING POINT MANDIR TIKRI) TO KM 16.275 (RC POST) (APPRX NET LENGTH 16.275 KMS) AND ADDITIONAL LINK TO PT 4340 OF 0.950 KM TO NHSL SPECIFICATION UNDER 42 BRTF/(P) VTK IN AP STATE IN EPC MODE
Construction of ROB and its approaches in replacement of existing level crossing at Km 843.205 of NH-17(New)/NH-31(old)under Abhayapuri Construction Division in the state of Assam under Annual plan 2021-22 under EPC mode.(Job No.-17/AS/2021-22/235).
DESIGN AND CONST OF ROAD AS PART OF ICBR WKS FROM SURVANSAMBA TO KANAKSPUR FROM CH KM 0.000 TO KM 6.550 (NET LENGTH 6.550 KM) THROUGH EPC MODE TO INCLUDE FMN WKS, PMT WKS, MINOR BRIDGES AND SURF WKS IN AOR OF PROJECT VARTAK IN ARUNACHAL PRADESH
Construction of Six Lane Standalone Flyovers at Bongaigaon Chapaguri Pathsala Simalguri Chowk and Baihata Bypass Junctions on stretches of NH 31 and NH 31C (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis
Construction of Six Lane Standalone Flyovers at Raha Demow Borghat Kathiatali junctions and ROB at Jagiroad on stretches of NH 36 and NH 37 (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis
Dibrugarh Town Water Supply Scheme Phase II under AMRUT 2 on EPC mode
CS for AE for Supervision of Construction of Standalone Flyovers and ROB on stretches of NH 31 NH 31C NH 36 and NH 37 in the state of Assam under BMP (Pkg-1 and Pkg-2) on EPC Basis
Construction of BPHU at Boithalangso BPHC in West Karbi Anglong District for FY 2022 23 under PM ABHIM on Turn Key Basis
Construction of Pile Foundation (DMC piling works) of DPS Numaligarh (G plus 2 Storied Building) on Lump Sum Turn Key (LSTK) Basis
Construction of Proposed Boys Hostel G2 at Diphu Medical College and Hospital Diphu Karbi Anglong under NHM Assam on Turn Key Basis
Construction of PH II Works of Diphu Medical College Auditorium Admin Block G Plus 1 provision under NHM on Turn Key Basis
Strengthening and Reconstruction of NH 154 from Km 67/600 to Km 88/225 in the district of Hailakandi in the State of Assam under Annual Plan 0f 2020-21under karimganj NH Division on EPC mode in the State of Assam, Job No 154/AS/2020-21/217
Strengthening and Reconstruction of NH 154 from Km 67/600 to Km 88/225 in the district of Hailakandi in the State of Assam under Annual Plan 0f 2020-21under karimganj NH Division on EPC mode in the State of Assam, Job No 154/AS/2020-21/217.
RFP for Improvement and widening to two Laning with Paved Shoulder of National Highway 127B from Km. 0.000 to Km 31.500 in the State of Meghalaya on EPC basis under NE Road Network Connectivity Improvement through JICA ODA Loan Phase-VII
Construction of one no. 5 Bedded Dispensary, Plant Drying Area, PE PTF Lab, Extension of One floor of Animal House Building, Natural Products Lab and optional items for TIES and GMP for NIPER Guwahati at Changsari, Guwahati, Assam on EPC Basis
Construction of (G plus 5) 200 Bedded ESIC Hospital at Beltola, Guwahati, Assam including internal and external Civil, Electrical and Mechanical services and external development work on EPC basis, SH Providing Computer Services for Office of the Chief Engineer- Guwahati.
Construction of (G plus 5) 200 Bedded ESIC Hospital at Beltola, Guwahati, Assam including internal and external Civil, Electrical & Mechanical Services and External Development work on EPC Basis, (SH: Providing running Inspection Vehicle with driver for ADG, Regional Guwahati, CPWD, Guwahati.
North Lakhimpur Town Water Supply Scheme Phase II under AMRUT 2 on EPC mode
CONSTRUCTION OF BUIDINGLESS SUB HEALTH CENTRE AT SARISAKURI IN CACHAR DISTRICT UNDER PMABHIM FOR FY2021-22 UNDER NHM ASSAM ON TURN KEY BASIS
CONSTRUCTION OF BUIDINGLESS SUB HEALTH CENTRE AT JANJARBALI IN CACHAR DISTRICT UNDER PMABHIM FOR FY2021-22 UNDER NHM ASSAM ON TURN KEY BASIS
Construction of PH II Works of Diphu Medical College Girls Hostel (One Unit) G plus 2 provision under NHM on Turn Key Basis
Construction of PH II Works of Diphu Medical College Boys Hostel (One Unit) G plus 2 provision under NHM on Turn Key Basis
Strengthening under Annual Plan for the year 2019-2020 from km 316/00 to km 330/00 and from km 345/00 to km 350/00 (total length-19km) of NH-15 under Nagaon NH Division in the State of Assam on EPC Mode, Job No 015/As/2019-20/194
Periodic Renewal to NH-315(New)/NH-38(Old) from Ch 4.86 Km to 20.00 km and 53.00 km to 56.35 km (L - 18.49 km) for the year 2021-22 under Dibrugarh NH Division in the State of Assam in EPC mode (Job No. TA-315-AS-2021-22/265)
Periodic Renewal from Km 18.800 to Km 28.550 and Km 37.950 to Km 48.550 on NH-6 (New)/ NH-154 (Old) (Total Length - 20.350 Km) under ARP for the year 2021-22 under Karimganj NH Division in the state of Assam in EPC mode. Job No 154/AS/2021-22/229
Stage strengthening to NH-53 (Silchar Badarpur section) from Km 3.65 to Km 6.25 and NH-54 at 21st km, 27th km to 30th km, 35th km, 36th km and 40th km in stretches for 2019-20 on EPC mode under PWD, NH Division, Silchar in the state of Assam
Construction of BPHU at JALAH BPHC in (in Jalah CHC) in Baksa District for FY 2022 23 under PM ABHIM on Turn Key Basis
CONSTRUCTION OF BUIDINGLESS SUB HEALTH CENTRE AT KACHUTALI IN KAMRUP M DISTRICT UNDER PMABHIM FOR FY2021-22 UNDER NHM ASSAM ON TURN KEY BASIS
CONSTRUCTION OF BUIDINGLESS SUB HEALTH CENTRE AT ALIGAON PATHAR IN BARPETA DISTRICT UNDER PMABHIM FOR FY2021-22 UNDER NHM ASSAM ON TURN KEY BASIS
CS for AE for Supervision of Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC basis
Construction of (G plus 5) 200 Bedded ESIC Hospital at Beltola, Guwahati, Assam, i/c internal and external civil, electrical and Mechanical services and external development work on EPC basis. SH: Providing running inspection vehicle with driver for ADG, Region - Guwahati, CPWD, Guwahati.
Construction of (G plus 5 )200 Bedded ESIC Hospital at Beltola, Guwahati (Assam), including internal and external civil, electrical and mechnical services and external development work on EPC basis, SH: Providing Computer services for O/o Chief Engineer (Ghy), CPWD, Guwahati- 35.