Construction Of 3 Nos. Of 11kv Link Lines Over A Distance Of 20 Kms From New 220 Kv Muss Bannur In Ramdurga Sub Division Of Hescom Ramdurg Division Under Turnkey Basi
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Nidagundi, Kolhar Sub Division in B Bagewadi Division on total turnkey and lumpsum basis (Reserved for SC category)
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Raibag Sub Division in Raibag Division on total turnkey and lumpsum basis (Reserved for CAT-II(A) category)
Construction Of New 33kv S/c Line Of 07kms From 110/33/11kv South Muss To The Existing 33/11kv Ggh Gis Sub Station In Kalaburagi City On Total Turnkey Basis
Work of providing 2 nos of capacitor banks, ACDB & DCDB in 33/11KV Khajuri sub-station in Aland sub-division of O&M Division-I, GESCOM, Kalaburagi on Total Turnkey Basis
Work of providing 2nos of Capacitor banks, ACDB and DCDB in 33/11KV V.K.Salgar sub-station in Kamalapur sub-division of O&M Division-I, GESCOM, Kalaburagi on Total Turnkey Basis
Enhancement Of 1x5mva Power Transformer-2 (bank-2) By 1x10 Mva Power Transformer At 33/11kv 2x5mva Koppa Sub-station In Koppa Sub-division In Koppa Division On Partial Turnkey Basis
Enhancement Of 1x5mva Power Transformer-2 (bank-2) By 1x10 Mva Power Transformer At 33/11kv 2x5mva Belthangady Sub-station In Belthangady Sub-division In Bantwal Division On Partial Turnkey Basis
Construction of 6 No.s of 11KV Link lines for a distance of 22.33 Kms from various substations in RSD-1 subdivision of O&M Rural Division, HESCOM, Belagavi on Total Turnkey Basis.
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Bagalkot Rural Sub Division in B Bagalkot Division on total turnkey and lumpsum basis (Reserved for CAT-I category)
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Sindagi, D Hippargi Sub Division in Indi Division on total turnkey and lumpsum basis (Reserved for CAT-I category)
Construction of 04 nos of 11kV link lines for a distance of 30.25 RKm from 110/11KV Hiremural Sub Station in Muddebihal sub division of B. Bagewadi division on Total Turnkey Basis.
Conversion Of Lt Overhead Line Into Aerial Bunched (ab) Cable In E-12 Sub Division Of Whitefield Division, Bangalore East Circle, Bmaz (north), Bescom On Total Turnkey Basis Under Percentage Quoting Basis
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Karwar, Ankola Sub Division in Karwar Division on total turnkey and lumpsum basis (Reserved for CAT-II(A) category)
System Strengthening Works Sanctioned Under Scp Tsp Scheme For Fy 2024-25 In Csd-2 & 3 Sub Division In Hubli Urban Division On Total Turnkey And Lumpsum Basis (reserved For Sc Category)
System Strengthening Works Sanctioned Under Scp Tsp Scheme For Fy 2024-25 In Rsd-1 & 2 Sub Division In Belagavi Rural Division On Total Turnkey And Lumpsum Basis (reserved For Sc Category)
Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Mundargi & Laxmeshwar Sub Division in Gadag Division on total turnkey and lumpsum basis (Reserved for CAT-II(A) category)
Formation of new 11kV Markanja, Elimale, Madappady and Guthigar town feeders from the existing 33/11kV Guthigar Sub-station in Guthigar Section of Subramanya Sub-division, Puttur Division on Total turnkey basis
Enhancement Of 1x5mva Power Transformer-2 (bank-2) By 1x10 Mva Power Transformer At 33/11kv 2x5mva Kumbra Sub-station In Puttur Rural Sub-division In Puttur Division On Partial Turnkey Basis
Work of Design construction, commissioning of 10 MLD STP based on SBR with BNR with Tertiary Treatment and odour control units at Basavanapura including Operation and Maintenance of 7 years.(Turnkey contract).
Replacement of existing Hazardous overhead LT line by 1.1kV, 3 phase 5 wire power line on 9 Mtr supports Arieal Bunched Cable (ABC) at various places in Gopanakoppa section,CSD-1,Hubballi on Total turnkey and lumsum Basis
Construction of 02 nos of 11kV link lines for a distance of 17.00 Rkm from 110/11 KV Atharga substation in Indi subdivision of Indi Division on Total Turnkey Basis(reserved for ST).
Construction of Laboratory building compound wall and security room for ICMR-NIV, Bangalore unit at KVAFSU campus, Bebbal Bangalore. SH: 1 A. Building portion i/c internal water suppl, sanitary installations, External Service connections, security ... in EPC mode ( ...
Construction of 04 Nos of 11kV link lines for a distance of 19.9 Km from 110/11 KV Malaghan Sub Station in Nidagundi sub division of B. Bagewadi division on Total Turnkey Basis.
Providing Link Line From Chitali Pati To Telkuni Village To Take The Load On New 110 Kv Muss Bangarga In Rudrawadi Section Of Aland Sub-division Under Link Line On Total Turnkey Basis
Construction of 2 Nos. of 11KV Link lines for a distance of 16.52 Kms from 33/11KV Kalloli Substation in Ghataprabha sub division of O&M Division HESCOM Ghataprabha on Total Turnkey Basis.
Electrification of 392 Un-electrified Households in 42 villages/habitations under Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DA-JGUA) Scheme in GESCOM Sindanur O&M Divisions in Raichur District on Total Turnkey basis
System strengthening works sanctioned under SCP TSP scheme for FY 2025-26 in Belagavi-1 Sub Division in Belagavi Rural Division on total turnkey and lumpsum basis (Reserved for CAT-II(A) category)
Construction Of 07 Nos Of 11kv Link Lines For A Distance Of 7.07 Kms Using 66kv Towers For River Crossing In Ankola Sub Division In Karwar Division On Total Turnkey And Lumpsum Basis
Construction of 09 nos of 11kV link lines for a distance of 28 Rkm from 110/11 KV Inchageri, Jigajivanagi and Kerur substations in Chadchan subdivision of Indi Division on Total Turnkey Basis.
Replacement 166 Nos of Existing Deteriorated/Hazardous LT Feeder Pillar Boxes and associated Materials in CSD-1 and CSD-2 subdivisions of Dharwad Urban Division, HESCOM, Dharwad on Total Turnkey and Lumpsum basis.
Design, Supply, Installation, Testing And Commissioning Of Rotary Map Machine With Accessories, One Set Of Related Spares And Control System On Turnkey Basis For Tumkur Dairy As Per Our Terms And Technical Specification
Appointment of PMC for the work of Turn Key, Lump Sum, Fixed price, no variation Tender based on Tenderers Own Design for the work of Treatment and disposal of legacy leachate accumulated in Mittaganahalli & Kannur Landfill sites
Electrification of 667 Un-electrified Households in 44 villages/habitations under Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DA-JGUA) Scheme in GESCOM Raichur Rural O&M Divisions in Raichur District on Total Turnkey basis
Work Of Re-conductoring Of 33kv Muchlamba Line From Sastapur 110/33-11kv Muss To 33/11kv Muss Muchlamba In Basavakalyan C&m Nodal Centre Of Bidar C&m Division On Total Turnkey Basis
Preventive And Breakdown Maintenance Of All Makes Of Das And Non Das Rmus Of All Configurations In North Circle Area Of Bescom For A Period Of Two Years On Total Turnkey Percentage Quoting Basis
Conversion of existing HT/LT OH line into Covered conductor/AB Cable in Bevoor, Channapatna Urban & Channapatna Rural sub-divisions in Ramanagara Division, Ramanagara Circle, BESCOM on Total Turnkey basis under Percentage Quoting basis.
Preventive And Breakdown Maintenance Of All Makes Of Das And Non Das Rmus Of All Configurations In East Circle Area Of Bescom For A Period Of Two Years On Total Turnkey Percentage Quoting Basis
Preventive And Breakdown Maintenance Of All Makes Of Das And non Das Rmus Of All Configurations In West Circle Area Of Bescom For A Period Of Two Years On Total Turnkey Percentage Quoting Basis
Preventive And Breakdown Maintenance Of All Makes Of Das And Non Das Rmus Of All Configurations In South Circle Area Of Bescom For A Period Of Two Years On Total Turnkey Percentage Quoting Basis
Transportation Of Existing 5 Mva Power Transformer From 33/11 Kv Srimangala Substation To 33/11 Kv Siddapura Substation And Erection Along With Connected Equipment At 33/11kv Siddapura Substation Under Partial Turnkey Basis.
Conversion of existing LT Overhead lines into LT Aerial Bunched cable in 4 feeders in Pavagada Sub-division of Madhugiri Division, Tumkur circle, CTAZ in BESCOM on Total Turnkey basis under Percentage Quoting basis
Supply, Installation, Testing and Commissioning of 60MT capacity fully electronic computerized lorry weighbridge (with Cabin) on turnkey basis by demolishing the existing 40 MT ELWB-II at FSD Bommapur for the FY 2025-26.
Supply, Installation, Testing and Commissioning of 60MT capacity fully electronic computerized lorry weighbridge (with Cabin) on turnkey basis by demolishing the existing 40 MT ELWB-II at FSD Bellary for the FY 2025-26.
Conversion of LPG to PNG of Billet Cutting Machine (BCMC) and Axle End cutting Machine (ACMC) in Old Axle Forge Line (OAFL) on turnkey basis as per the Technical Specification and Scope of work.
Reconditioning of 100MVA, 220/66/11kV Power Transformer-2 Make BHEL, SL No 2041611), Pertaining to 220kV Station, Somanahalli at KPTCL repair bay Peenya, Commissioning at 220kV station Somanahalli, Bengaluru on Total Turnkey Basis
Work of Design construction, commissioning of 60 MLD STP based on A2O with BNR with Tertiary Treatment and Power generation & odour control units at Bellandur including Operation and Maintenance of 7 years.(Turnkey contract).
CS for AE for supervision of Construction of 6Lane Bridge across Palguni River at km 368.849 of length 182.50m and improvement works from Design Chainage km 368.356 to Design Chainage km 369.132 on NH66 on EPC in Karnataka
Reconductoring Work Of Existing 33kv Navunda- Byndoor Sc Line From The Heroor Six Pole Structure To 33/11kv Byndoor Substation To A Distance Of 17.07rkms In Byndoor Subdivision Of Kundapura Division On Total Turnkey Basis