Loading…
Loading…
1,538 results • Best match
CONSTRUCTION OF 12 PC QUARTERS AT KUSHTAGI IN KOPPAL DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.86 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Comprehensive strengthening/improvement of HT/LT Distribution network of various feeders in KGF division, Kolar circle, Bangalore Rural Area Zone (BRAZ), BESCOM on Partial turnkey basis (Distribution Transformers will be supplied by BESCOM) under percentage quoting basis
ESTIMATION FOR THE REORIENTATION OF F3 SIDDARUDANAGARA FEEDER BY REPLACING OVERHEAD RABBIT TO 11KV 240 SQMM UG CABLE TO AVOID THE INTERRUPTION FROM F2 TALUK OFFICE F4 LAXMIPURA F5 BABALLI FEEDERS AT SEEGEBAGI STATION IN UNIT2 CSD BHADRAVATHI ON TOTAL ... TOTAL TURN KEY
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 3-LANE BI-DIRECTIONAL ROAD UNDERPASS ON BELLARY ROAD BETWEEN HEBBAL JUNCTION AND UNIVERSITY OF AGRICULTURE SCIENCES UAS STAFF QUARTERS VIA KARNATAKA VETERINARY ANIMAL AND ... ON EPC
Construction of Single Flyover on RHS at Katamanallur Ch.71.885 KA02 290 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH 75 from Km.237.7 to Km.318.0 in the State of Karnataka under EPC
4 laning of Channarayanapatna BP from km 140.449 to km 149.596 and Hassan BP from km 175.935 to km 185.684 and providing Grade Separator Structures Service Road and other safety measures in Devihalli to Hassan of NH75 (old NH48) on EPC in Karnataka
CS for AE of 4 laning of Channarayanapatna Bypass from km. 140.449 to km 149.596 and Hassan Bypass from km 175.935 to km 185.684 and providing Grade Separator Service Road and Devihalli km 108.486 to Hassan (km. 185.684) on EPC in Karnatak
A/p/s To Lt-3 10 Kw Load To Divisional Electrical Engineer Guntakal South Center Railway At Kamarwadi Village In Sulhalli Halli Station Wadi Rural Section Of Shahabad Sub-division Under E&i On Total Turnkey Basis
Comprehensive strengthening/improvement of HT/LT Distribution network of various feeders in Nelamangala division, Bangalore Rural circle, Bangalore Rural Area Zone (BRAZ), BESCOM on Partial turnkey basis (Distribution Transformers will be supplied by BESCOM) under percentage quoting basis
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for T.Narasipura Sub division (Lot-1)
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for Bannuru Sub division (Lot-1)
Work Of Providing 11kv Link Line Of Load Divided From F10 Gour Ip Feeder From 110/11kv Karajagi Mus To Nandarga Ip Set Dtc In Karjagi Section In Afzalpur Sub-division Under E&i On Total Turnkey Basis
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for T.Narasipura Sub division (Lot-4)
Comprehensive strengthening/improvement of HT/LT Distribution network of various feeders in Hosakote division, Bangalore Rural circle, Bangalore Rural Area Zone (BRAZ), BESCOM on Partial turnkey basis (Distribution Transformers will be supplied by BESCOM) under percentage quoting basis
Conversation Of 33kv Over Head Saunshi Line To Ug Cable At Government High School Near Dattathreya Temple Feeding From 220kv Srs Hubballi In O & M Rural Division Hescom Hubballi Under Hazardous Location On Total Turnkey And Lumpsum Basis
Arranging power supply to 25KW Commercial Lighting installation in the name of OM FUELS HIDAKAL (IOCL) (Survey No.245/246/6) at Hidakal area in Hidakal Section in Harugeri Sub-Division of Raibag division on Total Turnkey Basis.
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for T.Narasipura Sub division (Lot-2)
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for T.Narasipura Sub division (Lot-3)
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for Bannuru Sub division (Lot-2)
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for Bannuru Sub division (Lot-3)
Construction of 04 Nos of 11kV link lines for a distance of 19.5 Km from 110/11 KV Rohinihal Sub Station in Nidagundi sub divisions of B. Bagewadi division on Total Turnkey Basis. (Reserved for CAT-IIA category)
CONSTRUCTION OF 36 PC QUARTERS AT VARIOUS LOCATIONS IN VIJAYAPURA DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.76 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Construction of 4 BHK and 3 BHK Housing Project at Sy. No. 25,26,27,28,29,30,31 and 32 of Mediagrahara Village in DSKL Layout, Bangalore North Taluk on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Providing 1x100MVA, 220/110kV Power Transformer at 220kV Haveri sub-station in Haveri taluk & district on Total Turnkey basis including Supply of all Materials/ equipments, Mandatory Spares, Erection (Including Civil Works) of all materials/equipments, Testing and Commissioning
Formation Of 33kv Link Line Using 3 Core, 400 Sq.mm. Xlpe Ug Cable For The Distance Of 5.8kms From 110/33/11kv Guruvayanakere Substation To 33/11kv Belthangady Substation In Belthangady Subdivision Of Bantwal Division On Total Turnkey Basis
Running 11kv Link Line For Evacuation Of Power To Reduce Load On Overloaded Feeders On Item Wise Fixed Price Rate Contract In Magadi Division Jurisdiction Of Ramanagara Circle, Bescom For A Period Of One Year Under Total Turnkey Basis
Rearrangement Of Existing 33kv Single Circuit Murgod Line Passing In The Vicinity Of The College/ School/ Goshala/ Temple/ Hostel Premises To Avoid Hazardous Locations At Inchal Village In O&m Division, Bailhongal Under Total Turnkey Basis Under Pmrea Scheme
Re-conductoring of 33KV from Rabbit to Coyote conductor for 11Kms from existing 110KV Ilakal Substation to 33/11KV Bandragal Substation in C&M Sub Division GESCOM Hanumansagara/Kushtagi of C&M Division GESCOM, Koppal under total turnkey basis.
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for Nanjanagudu-2 Sub division (Lot-1)
Construction Of 05 Nos Of 11kv Link Lines From Proposed 110/11kv Hireharakuni Sub-station For A Distance Of 9.8 Kms In Kundgol Sub Division In Hubli Rural Division On Total Turnkey And Lumpsum Basis (reserved For Sc Category)
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for Nanjanagudu-2 Sub division (Lot-2)
carrying out of the work of Providing Street Light control wire, providing of Intermediate poles, LT/HT Line Extension and replacement of damage Poles in Varuna Vidhanashaba constituency under Total turnkey basis for Nanjanagudu-1 Sub division (Lot-1)
Construction of 05 Nos. of new 11KV lines using 11KV UG cable from 110/11 KV Fort and Neharunagar for a distance of 9.02 RKms in Belagavi CSD-3 Subdivision of Belagavi Urban Division, HESCOM, on Total Turnkey Basis.
Construction of 4 BHK and 3 BHK Housing Project at Sy. No. 47/1,2,3,4 and 46 of Kalathammanahalli Village in DSKL Layout, Bangalore North Taluk on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
CONSTRUCTION OF 12 PC & 06 PSI QTRS AT HOSAPETE IN VIJAYANAGARA DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.85 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 12 PC QUARTERS AT DAR PREMISES MANDYA IN MANDYA DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.63 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Design engineering supply, packing forwarding, transportation, unloading, storage, installation, testing, commissioning and free Operation and Maintenance for 1 year of 50 KWp Roof top Solar PV plant with net metering at IOCL Belgaum Depot Karnataka
Custom Bid for Services - One Time Repair of 1000 KVA Transformer of LS1 Substation at HAL-ARDC as turnkey project Similar Category Repair and Overhauling Service Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Tender For (1) Providing 11kv Link Line Work For Bifurcation Of Overloaded F4 Sindanur Raod Industrial Feeders From Old Chagi Rice Mill To Sindanur Road Wel Come Gate At Sindanur Road Over A Distance Of 2.5kms Duly Creating Doubling Of F4 Feeder & ... Partial Turn Key (ptk) ...
Construction of Single Flyover on LHS at Narasapura CH.41.774 KA 02 231 under road safety for rectification of blackspots in the stretch of Bangalore Hoskote Mulbagal Section of NH 75 from Km.237.700 to Km.318 in the State of Karnataka under EPC
Construction of LVUP at Javanagondanahalli at grade Junction Ch.141.150 KA 02 005 and Gorladaku at grade Junction Ch.144.500 KA 02 099 Under road safety for rectification of Block spot of Tumkur Chitradurga from Km.75.00 to 189.000 of NH 48 Under EPC
Setting up of a Data Centre on turnkey basis
Planning Designing & C/o Chemistry and Life Sciences Dept. G Plus 3 floors i/c firefighting works, Services IWS and SI, working tables, WS and EDS for labs, Civil External Service Connections, IEI, Elect External Service Connections, Local Body ... on EPC basis .
Estimate For Arranging Power Supply To 52 Nos. Of Residential Blocks At Sy. No 7, Hebbarnagara In Mundagod Town Limits In The Name Of Chief Officer Pattana Panchayath, Mundagod, Developed By Executive Engineer, Slum Board, Subdivsion, Belgaum On ... Partial Turnkey Basis
Arranging power supply to an extent of 1200 KVA HT Installation in the name of the Register, Airport Authority of India, Hubballi on 33KV Voltage class in O&M Urban Division, HESCOM, Hubballi on Total Turnkey and Lump sum basis
Estimate For Arranging Power Supply To 43 Nos. Of Residential Blocks At Sy. No 128, Hebbarnagara In Yellapur Town Limits In The Name Of Chief Officer Pattana Panchayath, Yellapur, Developed By Executive Engineer, Slum Board, Subdivsion, Belgaum On ... Partial Turnkey Basis.
Construction of 04 nos of 11kV link lines using UG cable from 110/11 KV Anandnagar, Navanagar and Gamanagatti substations for a distance of 3.5 RKm in Hubli CSD-3 4 subdivisions of Hubli Urban division on Total Turnkey Basis
Construction of 03 Nos. of new 11KV lines using 11KV UG cable from 110/11 KV Sadashivnagar and Fort substations for a distance of 9.27 RKms in Belagavi CSD-1 Subdivision of Belagavi Urban Division, HESCOM, on Total Turnkey Basis.
CONSTRUCTION OF 18 NOS (12 PC & 06 PSI) QUARTERS AT MADIKERI IN KODAGU DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.69 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Repair of punctured 110kV 240 sqmm XLPE UG Cable of 110kV SRS-PHC line near Settlement area in Hubballi City, Dharwad District in Operation Division, KPTCL Hubballi including Supply of materials/ equipments, Erection, Civil works, Testing & ... Partial Turnkey Basis