Loading…
Loading…
1,538 results • Best match
CONSTRUCTION OF 32 NOS SI QUARTERS AT KADUGODI, BANGALORE UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.59 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), CONTRACTORS OWN DESIGN TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (Stilt,GF & 7 Floors)
Replacement of 1X6.3 and 1X8MVA, 66/11KV Power Transformer by 2X20 MVA Power Transformer at 66/11KV Gowrasamudra S/S in Challakere Taluk and Chitradurga District including supply of equipments/materials, Dismantling and erection (including civil ... Partial turnkey basis
Augmentation of 2X20MVA, 66/11KV Power Transformer by 2X31.5 MVA, 66/11kV Power Transformers at 66/11KV Channagiri Sub-Station in Channagiri Taluk and Davanagere District including supply of equipments/materials, Dismantling and erection (including ... Partial turnkey basis
CONSTRUCTION OF 18 NOS (12 PC & 06 PSI) QUARTERS AT CHINTHAMANI IN CHIKKABALLAPURA DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.89 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS-CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE)(GF,FF,SF)
CONSTRUCTION OF 18 NOS (12 PC AND 6 PSI) QUARTERS IN HAVERI DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.72 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 54 QUARTERS (48 PC & 6 PSI) AT VARIOUS LOCATIONS IN KALABURAGI DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.77 ON LUMPSUM, NO VARIATIONS (FIXED PRICE),TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 48 QUARTERS (36 PC & 12 PSI) AT VARIOUS LOCATIONS IN MYSURU DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.62 ON LUMPSUM, NO VARIATIONS (FIXED PRICE),TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE (GF,FF,SF)
CONSTRUCTION OF 12 NOS (12 PC) QUARTERS AT DODDABALLAPURA IN BANGALORE RURAL DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.87 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Comprehensive Annual Maintenance of Existing LAN Networking, CCTV Surveillance, Wi-Fi, Network Equipments, Video Conference Equipment, Online UPS and OFC Backbone with Internet 50 MBPS Leased Line for BTDA Campus for All Office Building. For Year ... on Turnkey Basis
CONSTRUCTION OF 64 PC QUARTERS AT BEGUR IN BANGALORE UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.61 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), CONTRACTORS OWN DESIGN TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (STILT, GF & 7 FLOORS)
Work of Design construction, commissioning of 50 MLD STP with additional secondary sludge from existing 50 MLD STP based on SBR with BNR with tertiary Treatment and power generation odour control units at Kadabeesanahalli including Operation and ... years.( Turnkey contract).
Construction of balance work of 4L with paved shoulder of Bellary Bypass from Ch. 254.630 to Jn at Ch. 266.837 (Length 12.207 Kms) and 1 Km Stretch From Ch. 277.690 to Ch. 278.690 at D. Hirehal of NH150A of Bellary Byrapura Sec in Karnataka on EPC
Construction of a 6 Lane Flyover with approaches and slip road at Ganesh Nagar Cross Km.226.160 between Km 225.800 and Km 226.960 on the 4 lane Bijapur-Hungund section of NH 50 in the state of Karnataka, to be executed on Standalone basis under EPC m
Construction of LVUP at Chikkanahalli at grade Junction Ch.111.000 KA 02 221 under road safety for rectification of Black spot in the stretch of Tumkur Chitradurga section from Km 75.00 to 189.000 of NH 48 Old NH 4 in the state of Karnataka on EPC mo
Procurement, Installation & Commissioning of Electric Operated Steam Cooking System (TURNKEY)
Reconductoring Of Old Deteriorated Rabbit Acsr By Coyote Acsr Of 33kv Surathkal-mulki (surathkal Industrial) Feeder Emanating From 110/33/11kv Mulki Sub-station To Katipalla G.o.s For The Distance Of 13rkms In Surathkal Sub-division, Kavoor Division ... Partial Turnkey Basis
Rectification of hazardous locations by Replacing of existing HT/LT bare Overhead Conductor with HT covered conductor/ LT AB Cable in Hosakote Division of Bangalore Rural Circle, BESCOM for a period of one year on Rate Contract under Total Turnkey Pecentaghe Quoting Basis.
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Magadi sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Tavarekere sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Bevoor sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Channapatna Rural sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Chikkaballapura Rural sub-division
Conversion Of Three Pole Structure To Spun Pole At Kudalkar 250kva Dtc Medar Oni (under Hubli - Dharwad Smart City Project Package-2) In Mantur Road Section Sub-division-2 Of O & M Urban Division, Hescom Hubli Under Dcw Scheme On Total Turnkey Basis
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Kolar urban sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Kanakapura urban sub-division
Work Of Re-conductoring Of 33 Kv Line (rabbit To Coyote) From Chowdapur Four Pole Structure To Ankalga 33/11 Kv Sub-station In C&m Division, Gescom, Kalaburagi On Partial Turnkey Basis In Which 20kms Coyote Conductor Will Be Supplied Departmentally
Arranging power supply to an extent of 3200 KVA HT Installation in the name of the Register, Airport Authorities of India, Sambra, Belagavi on 33KV Voltage Class System in O & M Rural Division HESCOM Belagavi on Total Turnkey and Lump sum basis
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in channapatna urban sub-division
Creation Of Necessary Electrical Infrastructure For Providing Street Light/ Metering Along With Timer Switch On Partial Turnkey Basis (acsr Rabbit Conductor Will Be Supplied By The Bescom) Under Item Wise Fixed Rate Con Tract On Percentage Quoting Basis In Sathnur Sub-division
Strengthening Of Ht And Lt Distribution Network By Providing Link Lines Using Ht Ug Cable Wherever Necessary And Replacing Age Old Conductor By Rabbit Conductor And Lt Ab Cable At Kanakpura Division, Bescom For A Period Of One Year On Total Turnkey Basis
Strengthening Of F-11 Ganakallu Feeder By Replacing Existing Overhead Conductor To Htug Cable In Kengeri O&m Unit 22 Of K1 Sub Division Of Kengeri Division Of Bangalore West Circle, Bmasz, Bescom For A Period Of One Year Under Partial Turnkey Basis
Establishing 1x8mva, 33/11kv Substation At Koila By Drawing 33kv Single Circuit Line Using Coyote Acsr Conductor From Proposed 110/33/11kv Karvelu (nekkilady) Substation For The Distance Of 11rkm In Puttur Urban Sub-division Of Puttur Division On ... Total Turnkey Basis
Painting of NGEF make 100MVA power Transformer -1 and 2 at 220/66/11 kV Hebbal Sub Station, pertaining to Hebbal Operations Division, KPTCL, coming under the jurisdiction of Transmission Operation Circle-North, Bengaluru on Total Turnkey, Two Part and Percentage Basis
Providing additional 1x100MVA, 220/110kV power transformer at 220/110/11kV sub-station at Ghataprabha in Gokak taluk, Belagavi district on Total Turnkey basis including Supply of all Materials/ equipments, Mandatory Spares, Erection (Including Civil Works) of all materials/equipments, Testing and Commissioning
CONSTRUCTION OF 18 NOS (12 PC & 06 PSI) QUARTERS AT BIDAR CITY IN BIDAR DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.78 ON LUMPSUM, NO VARIATIONS (FIXED PRICE),TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 30 NOS (24 PC & 06 PSI) QUARTERS AT VARIOUS LOCATIONS IN BELAGAVI DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.71 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Turnkey Lump Sum fixed Price No variation Tender based on Tenderers own design for the work of Design, Supply, Installation, Commissioning ,Construction and Operation and Maintenance of Leachate Treatment Plant of 5 KLD Capacity at Avaragolla Solid Waste Processing site, City Corporation Davangere
CONSTRUCTION OF 18 NOS (12 PC AT MUNDARAGI & 06 PSI AT BETAGERI) QUARTERS IN GADAG DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.75 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 30 NOS (24 PC & 6 PSI) QUARTERS AT VARIOUS LOCATIONS IN RAICHUR DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.79 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Strengthening of Earthing system of 220/110/11kV Nittur Receiving Station, in Nittur Nodal Centre, Operations Division, Tumakuru, District Tumakuru, including supply of Equipments / Materials, and Erection (including civil works), under Partial ... Partial Turnkey Basis, ...
CONSTRUCTION OF 48 NOS (36 PC AND 12 PSI) QUARTERS AT VARIOUS LOCATIONS IN DHARWAD DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.73 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 18 NOS (12 PC AT SHORAPUR & 06 PSI AT SHAHAPUR) QUARTERS IN YADGIRI DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.80 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 18 NOS OF QUARTERS (12 PC & 6 PSI) AT ASHOKANAGARA IN SHIVAMOGGA CITY UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.81 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
CONSTRUCTION OF 54 QUARTERS (48 PC & 6 PSI) AT VARIOUS LOCATIONS IN DAKSHINA KANNADA DISTRICT UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE NO.67 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), TURNKEY BASIS -CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (GF,FF,SF)
Providing Project Management Consultancy Services including Supervision, Quality Assurance, Progress Monitoring/Reporting, Measurement, Billing and Documentation for the Work of Construction of 24 PC Quarters at Koratagere in Tumkur District on ... Lumpsum Turnkey Basis-Conventional ...
Strengthening of Earthing system of 66/11kV Hosakere Sub-Station, in Nittur Nodal Centre, Operation Division, Tumakuru, District Tumakuru, including supply of Equipments / Materials, and Erection (including civil works), under Partial Turnkey Basis, on item-wise Tender Basis in Transmission (Operations) Zone.
CONSTRUCTION OF 32 NOS SI QUARTERS AT SHIVAJINAGAR (SHIFTED FROM VYALIKAVAL), BANGALORE UNDER POLICE GRUHA 2025 (PHASE-5) SCHEME PACKAGE No.60 ON LUMPSUM, NO VARIATIONS (FIXED PRICE), CONTRACTORS OWN DESIGN TURNKEY BASIS - CONVENTIONAL METHOD OF CONSTRUCTION (FRAMED STRUCTURE) (Stilt,GF & 7 Floors)
Providing Project Management Consultancy Services including Supervision, Quality Assurance, Progress Monitoring/Reporting, Measurement, Billing and Documentation for the Work of Construction of 24 PC Quarters at Madhugiri in Tumkur District on ... Lumpsum Turnkey Basis-Conventional ...
eTender for Supply, Installation and Commissioning of Machineries and Equipments with necessary accessories Automatic Roasting Machine Flour mill unit Pasta Making Machine Extrusion Cold Complete extrusion unit for puffing and extruded products ... on Turnkey basis ...
Replacement of existing LT overhead by LT arial Bunched Cable in Hazardous location, Theft prone areas, slums, crowded public place, Narrow Roads, High interruption feeders, NJY Feeder crossing locations and schools / collages /Hostels premises etc. ... Total turnkey basis ...