Loading…
Loading…
1,445 results • Best match
Erection of BIFURCATION 33 KV LINE FOR RAILWAY CROSSING JOBAT TO BORI UDAIGARH DC o and m Division ALIRAJPUR On Semi Turn Key basis under SSTD Scheme in UDAIGARH DC o and m Division ALIRAJPUR in Jhabua Circle
Erection of 11 KV Mehatpura Irr feeder from Khachroda to Muradka under Kesur Dc O and M Dn Dhar On Semi Turn Key basis under SSTD Scheme in Kesur DC o and m Dhar Division in Dhar Circle
Erection of 11 KV FEEDER BIFURCATION RUPGAR TO UDAIPURIYA UNDER KAKANWANI DC UNDER O and M DIVISION JHABUA On Semi Turn Key basis under SSTD Scheme in KAKANWANI DC UNDER O and M DIVISION JHABUA in Jhabua Circle
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run and Commissioning of 2X2.5 MVA, 33kV/3.3kV Substation including Operation and Maintenance during DLP of 60months on Turnkey Basis at KANCHAN OCP, JOHILLA AREA, SECL
Supply Installation Testing and Commissioning of fully electronic computerized lorry weighbridge 60 MT capacity lorry weighbridge on turnkey basis at FGD Chhola Bhopal Inclusive of 2 years guarantee period and 3 years Comprehensive AMC
Erection/Testing and Commissioning of new 33KV/11KV/LT Lines/distribution substations etc and other miscellaneous work, on turnkey basis in rural/urban areas of Satna District AND Maihar Distt. under ONM Circle, Satna.
Execution of Khalwa lift micro Irrigation project Phase-II in Lumpsum for Turnkey contract for irrigation 7910 Ha. Up to 2.5 Ha. Chak as per detailed scope of work (But not limited of that)
Construction of 9 Nos. New 33/11kV Substation and installation of 1 No. 3.15 MVA Additional PTR with associated 33kV and 11kV lines on Semi turnkey basis in Agar OnM Circle of MPPKVVCL, Indore.
Operation and Maintenance for 3 Years ( 36 Month ) of Simrol Ambachandan Micro Lift Irrigation Scheme on Turnkey basis for irrigation in 4000 Ha. up to 2.5 Ha. chak as per detail scope of work.
Operation and Maintenance for 3 Years ( 36 Month ) of Choundi Jamuniya Micro Lift Irrigation Scheme on Turnkey basis for irrigation in 4000 Ha. up to 2.5 Ha. chak as per detail scope of work.
Operation and Maintenance for 3 Years ( 36 Month ) of Amba Rodiya Micro Lift Irrigation Scheme on Turnkey basis for irrigation in 9915 Ha. up to 2.5 Ha. chak as per detail scope of work.
TURNKEY CONSTRUCTION OF VAN CHOUKI SAMARDHA
SELECTION OF EPC CONTRACTOR FOR DESIGN AND DEVELOPMENT WORK i.e. INTERIOR, ELECTRICAL, IT, FIRE, HVAC AND OTHER ASSOCIATED WORKS AT THE PROPOSED IT OFFICE FACILITY i.e., CENTER OF EXCELLENCE OF M/s BHARAT ELECTRONICS LIMITED (BEL) IN IT PARK
SELECTION OF EPC CONTRACTOR TO DESIGN, DEVELOP, IMPLEMENT,OPERATE, MAINTAIN AND TRANSFER SMART MULTI-LEVEL 2 - WHEELER (450 NOS) MECHANIZED PARKING WITH SIX (06) MONTHS OPERATION AND MAINTENANCE AND 5 YEAR AMC AT KHAJURI BAZAR BEHIND RAJWADA 3rd Call
Consultancy Services for Authoritys Engineer for Supervision of Upgradation and Construction to 2Lane with paved shoulders with Flexible Pavement on Khalghat to Sarwardewla Road NH 347C Design Length 79.59 Km in the State of Madhya Pradesh on EPC Mod
Supply Estimate for Additional PTR 3 15 MVA under SSTD 2024 25 Scheme at Kunjrod Ss under Bagdi Dc OM Dn Dhar On Semi Turn Key basis under SSTD Scheme in Bagdi DC of DHAR Dn in DHAR Circle
Erection of 11 kv bifurcation Bakhatgarh old2 feeder Emineting from 3311 kv sub station Walpur UNDER Sondwa DC OandM DIVISION Alirajpur On Semi Turn Key basis under SSTD Scheme in UNDER Sondwa DC OandM DIVISION Alirajpur in Jhabua Circle
Erection of EST FOR NEW 11KV LINE AT PITHANPUR FEEDER BIFURCATION UNDER SSTD WORK LOCATION PARA TO PITHANPUR UNDER PARA DC O M DIVISION JHABUA Semi Turn Key basis UNDER PARA DC O M DIVISION JHABUA in Jhabua Circle
SETUP OF SCIENCE, TECHNOLOGY, ENGINEERING, ARTS AND MATHEMATICS (STEAM) INTEGRATED ROBOTICS LAB WITH AR AND VR ALONG WITH TEACHER TRAINING IN 52 SCHOOLS ON TURNKEY BASIS IN THE STATE OF MADHYA PRADESH UNDER STARS PROJECT
Design, Engineering, Construction, and Commissioning for Up-gradation of Central Workshop, Jayant, NCL consisting of all Civil, Structural, Electrical and Mechanical works in all respects on turnkey basis and Maintenance of plant for five years.
On Turnkey Basis Construction of Roads including High Level Bridge, Slab Culvert, Hume Pipe Culvert affected by submergence area under Banda Major Irrigation Project, as per detailed scope of work but not limited to that.
Construction of 132kV Substation at Satnoor with Borgaon- Satnoor and Pandhurna (220kV)- Satnoor 132kV DCDS Transmission lines and associated 132kV bays at Borgaon and Pandhurna (220kV) S/s on turnkey basis against TR-50/2019
Planning, Design, Installation, commissioning and operation of automatic fixed sprinkler system along newly constructed Jayant- Singrauli CC Coal Transport road (3.2 Km) including operation, maintenance and watch and ward for 5 years on Turnkey basis
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run and Commissioning of 2 x 6.30 MVA, 33/6.6 kV Dhankasa Substation on Turnkey Basis at Amalgamated Dhankasa and Jamunia Under Ground Project, Pench Area, WCL.
On Turnkey Basis Construction of 07 Nos. Gated Barrages (Sironj Barrage cum Causeway, Ranayar Barrage, Daknakhedi Barrage, Patada Barrage cum Causeway, Tigariya Goga Barrage, Barod Pipliya Barrage and Gajnodkheda Barrage) across Shipra River and its
Construction of Khoriya Ema tank without canal on Turnkey basis Earthen dam including Sluice and spill channel etc. Excluding compaction work and Including watering on local nalla near village Khoriya Ema Tehsil Shajapur District Shajapur
Survey, Designing, Planning, drawing and construction of 1.00 MLD STP on SBR Technology and Sewerage Network including O/M for 5 years at Govinda Colony, Kotma Govinda Sub Area at JnK Area on Turnkey Basis.
Survey, Designing, Planning, drawing and construction of 1.50 MLD STP on SBR Technology and Sewerage Network of 29,567.00 meters, including O and M for 5 years at Jamuna Township of JnK Area on Turnkey Basis.
TR-33/2020 for Construction of 132kV 2P-2W lines for RTS Katangi, RTS Ishnagar, RTS Sank, and RTS Simariyatal alongwith construction/shifting of 132kV FB at corresponding S/s of MPPTCL on turnkey basis.
TR-21/2021 for various 132kV T.L. works associated with Metro Rail Project and Smart City Project at Bhopal on Underground XLPE Cable including design of Cable Termination (DC/CT) Monopole/tower on turnkey basis.
Custom Bid for Services - Outcome activity based Turnkey contract work for Provision of OBHS in trains on Coach Mitra pattern for primary maintenance train of Coach Care Complex DADN for a period of 4 year
Custom Bid for Services - Outcome measured turnkey work of Coach Cleaning Contract CCC including cleaning of Coaching Depot Premises Passenger Amenity Fitting in Coaches Cleaning Watering Locking Unlocking activities for PF returnSTR trains at DADN ..
Construction of RCC Overhead tank (2 Nos.) at ward no. 01 and 09 Alirajpur. Overhead tank capacity 300 KL, 15 MTR staging 1/C inlet, outlet, scour, overflow connections, required sluce valve, white wash colour ETC. Complete (Turn key job)
Erection of 33 KV BIFURCATION OF 33 KV JOBAT FEEDER FROM 33 11 SS CHANDPUR TO 3311 SS AMKHUT FEEDER UNDER KATTHIWADA DC O and M Division ALIRAJPUR Semi Turn Key basis under SSTD Scheme in ALIRAJPUR in JHABUa circle
Erection of Prepared New Grid Ss of 3 15 MVA PTR at Location New Grid Ss Kanwada under Jobat Dc OM Division Alirajpur Semi Turn Key basis under SSTD Scheme in Kanwada under Jobat Dc OM Division Alirajpur in Jhabua Circle
Erection of BIFURCATION 11 KV FOR SECTION TIMARWANI TO MUNJAL OF SUBSTATION SUJAPURA THANDLA DC o and m Division Jhabua On Semi Turn Key basis under SSTD Scheme in THANDLA DC o and m Division Jhabua DIVISON in Jhabua Circle
Supply Erection of Estimate for bifurcation of overloaded 11 KV Aali Irr feeder from Bagdi to Meghpura Village under Bagdi Dc OM Dn Dhar On Semi Turn Key basis under SSTD Scheme in Bagdi DC of DHAR Dn in DHAR Circle
Erection of BIFURCATION 11 KV FOR SECTION MUNJAL TO NAGARI OF SUBSTATION SUJAPURA THANDLA DC o and m Division Jhabua On Semi Turn Key basis under SSTD Scheme in THANDLA DC o and m Division Jhabua DIVISON in Jhabua Circle
Erection of New 3.15 MVA substation under SSTD scheme in village MALPURA of SUSARI DC O and M Division KUKSHI Semi Turn Key basis under SSTD Scheme in Kukshi under SUSARI Dc O and M Division Kukshi in Dhar Circle
Supply and Erection of New 33 KV Line On PCC Pole From Bagdi to Billoda7.00 km 33 KV Line On PCC PoleOn Semi Turn Key basis under SSTD Scheme in Bagdi DC of O and M Division Dhar in Dhar Circle.
Supply Estimate for Adarsh Gram Paduniya 1914 Meter Sreet light with Poll And Transfarmer at village Paduniya Under Badnawar R Dc O M Division Badnawar On Semi Turn Key basis under Deposit Scheme in Badnawar R Dc O M Division
Rehabilitation and up-gradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 108.00 start of Pawai Bypass to km 119.65 end of Chandia Ghat realignment of NH 43Extn, length 11.65 km along EPC
Survey, Site Investigation, Design, Construction, Procurement, Installation, Commissioning of 2.50 MLD capacity ZLD based Common Effluent Treatment Plant with 10 Years O and M at PM Mitra Park Dhar, MP on EPC plus O and M (DBO) mode at Location B
Construction of AIIMS at Awantipora (KASHMIR), Jammu & Kashmir (on EPC 3 Mode basis) etc. SH: (Providing services of four wheeled inspection vehicle for the office of Executive Engineer & Senior Manager (Elect.), AIIMS, Awantipora (Kashmir) Project Zone, CPWD, Srinagar (J&K).
Construction of AIIMS at Awantipora (Kashmir), J & K (on EPC 3 Mode basis) etc. (SH: Providing services of four wheeled inspection vehicle for the O/o Executive Engineer & Senior Manager (Elect.), AIIMS Awantipora (Kashmir) Project Zone, CPWD, Srinagar (J&K).
On Turnkey Basis Construction of Hiran Barrage No-2, Moriyagaon Barrage, Sukta Barrage, Hathni Barrage No-2, Begalgaon Barrage (without canal), Achpai tank (Without Canal), Sukhibavdi Tank (Without Canal), Ranjeet Tank (Without Canal), and Badgaon Ta
Construction of Prahald Oriya Minor Irrigation Tank including Waste Weir, approach and spill channel, head sluice and canal work including its structures as per detailed scope of work but not limited to that On Turnkey Basis
Planning, Designing, Construction including Surveying,Geo-Technical and Hydrological Investigation for Construction of RCC Bridge of length 40m and 11.50m overall width across Dhankasa Nallah at Dhankasa UG, Pench Area,WCL on Turnkey basis (2nd Call)
Execution of the Rewa Branch Canal from R.D. 0.00 km. to R.D. 24.00 Km including its complete distribution system upto 40 Hact. Chak of Bargi Diversion Project On TURNKEY Basis as per detail scope of work.
Construction of Barrage on Gambhir River near Ratankhedi Village Tahsil Sanwer District-Indore, (M.P.) For Gross capacity of 0.52 MCM Water capacity on TurnKey Basis. As per detailed scope of work but not limited to that.