Loading…
Loading…
1,432 results • Best match
Consultancy Services For AE For Supervision of 4-laning of Balwara to Dhangaon section of NH-347BG and 753L (Indore to Boregaon-Pkg III) Design Ch. 42.260 to Design Ch. 82.810 under Bharatmala Pariyojana Phase-I in the State of MP on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.
Construction of 4 lane divided carriageway of Missing link section of NH 39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH9 (design length 13.100km) under BMP in the State of MP on EPC mode.
Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode
Balance works of 4 lane divided carriageway of Missing Link section of NH-39 (Rewa Bypass) from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH-9 (length 13.100 km) on EPC Mode under BMP in Madhya Pradesh
One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode
Upgradation of MP/RJ border-Sheopur-Goras road section of NH-552E from Design Chainage 0.000 to 48.400 Km (Total length 48.40 km) to two Lane with paved shoulder configuration along with OTI of 16.6 km in the state of Madhya Pradesh on EPC mode
Upgradation of old NH-7 from 2-Lane to 4-Lane Divided Carriageway in Seoni Town for a Length of 12.67 Km. and Construction of New ROB for a Length of 630m (approx.) in Seoni Town in the State of Madhya Pradesh on EPC Mode.
Construction of 6-lane LVUP and its approaches with slip road at km 206.420 on Rewa to MP/UP Border section of NH-30 (Old NH-07) at junction with intersecting road Baikunthpur Mangawan, district Rewa in the state of Madhya Pradesh on EPC Mode
CONSTRUCTION OF UPGRADATION OF MAU PADNA TALEN ROAD UNDER CRIF LENGTH-25.50 KM ON EPC Mode under PWD (B and R) DIVISION RAJGARH IN THE STATE OF MADHYA PRADESH Estimated cost Rs. 6563.38 lacs work period 540 days I/c rainy season First call
On Turn Key Basis Construction of Motipura Barrage as per details in scope of work but not limited to that.
Construction of Dholana Khurd Barrage on turn key basis as per detailed scope of work but not limited to that.
On Turn Key Basis Construction of Keshari Barrage, as per details in scope of work but not limited to that.
On Turn key basis Construction of Basariya Nala Barrage as per detailed scope of work but not limited to that.
On Turn Key Basis Construction of Patania Barrage, as per details in scope of work but not limited to that.
On turn key basis- Construction Takhaji Micro Medium project, as per detailed scope of work but not limited to that.
On Turn key basis Construction of Hanumandhara Stop Dam as per detailed scope of work but not limited to that.
Construction for Slab culvert for Pachdhar Garvha Road Near Second CD in Submergence of Parasdoh Medium Irrigation Project (Turn Key) .
On Turn key basis Construction of Narel Nala Barrage as per detailed scope of work but not limited to that
Construction of Handiya Kundiya Barrage on turn key basis as per detailed scope of work but not limited to that.
C/o 100 Bedded ESIC Hospital and Residential Quarters at Pithampur. (MP) Package-I) SH-1 (a) Planning, Designing and C/o various RCC Buildings for setting of a 100 bedded Hospital along with ancillary buildings viz. canteen etc...... in EPC Mode-1 ... etc........in EPC Mode -1 ...
Turnkey construction of line quarter in sheopur under Kuno Wildlife Division
Supply, Installation and Commissioning of Other Equipment on Turn Key basis at item wise for Govt.Model PG College, Jhabua - 457661 (GMPGC).
Supply, Installation, Integration, Commissioning and Maintenance of Integrated Security Surveillance Systems in 05 cities of Madhya pradesh (On turn-key basis)
4-laning of Indore to Raghav Garh section of NH-59 (Indore-Harda package-1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design 26.653 Km) under Bharatmala Pariyojana Phase-I (EC) in Madhya Pradeshv on EPC Mode
Strengthening of Four Lane with Earthen Shoulder Flexible Highway from Bogda Pull at km 4/2 to Start of Ayodhya Bypass at km 9/10 on NH-86 Extn. of Total Length 5.340 km with Earthen shoulder configuration in the state of Madhya Pradesh on EPC mode
Consultancy Services for Authoritys Engineer for Supervision of Construction of 4-lane from Barela to NH-45 section of NH-30 from Km 2.900 to Km 39.180 (Jabalpur Ring Roa PKG-1 and PKG-2) under Bharatmala Pariyojna in the State of MP on EPC Mode
Construction of Balance New Service Road MNB Culverts Drain VUP-LVUP-SVUP and its work Km 656.000-Km725.185 of Rewa Katni Jabalpur section (P-1) and from Km 725.185-Km774.068 and Km793.065-Km813.257 (P-2) of NH-30 in the State of MP on EPC Mode
On Turn Key Basis Construction Serimar earthen dam with canal as per details in scope of work but not limited to that.
On Turn Key Basis Construction of Kukretha Stop Dam as per details given in scope of work but not limited to that.
On Turn key basis Construction of Kumharra Stop Dam Cum causeway as per detailed scope of work but not limited to that
Construction of Solsindhi Ghat on Kshipra river on Turn-Key Basis as per detailed scope of work but not limited to that.
Construction of Kesharipura ghat on katkiya river on Turn-Key Basis as per detailed scope of work but not limited to that.
Construction of Bhundwas ghat on Kshipra river on Turn Key Basis As per detailed scope of work but not limited to that.
Strengthening of Road from km 36 to 43 Km 51 to 55 and Km 72/2, To 72/4 Total Km 13.40 of NH-12A Extn. Damoh-Heerapur Road in the State of Madhya Pradesh on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
One Time Improvement Of pkg-1 at Morena Porsa Bhind Road, Ambah Town 1.22 Km, Ater Town 3.04 Km, Pratappura 0.91 Km, Tor Ka Pura 0.65 Km Bhind Town 2.70 Km Total Length 8.52 Km Of Nh-552 Ext. In The State Of MP Under Epc Mode. 2ND CALL
C o Centre for Disability Sports at Gwalior M P through EPC mode SH providing services of Two nos Computer Operator One No Chowkidar and Two Nos Peon for day to day functioning up keep and maintenance of records of the Gwalior Project Division Sub Division CPWD at Gwalior
Supply, Installation and commissioning of 01 No. New IMWB, Having 140MT Capacity as per RDSO Specification No WD-29-MISC-19 on EPC Basis with all accessories and associated system on rail line between Bir to Power House, SSTPP, MPPGCL, Dongalia
SUPPLY INSTALLATION AND COMMISSIONING OF 4 TPH GAS PLUS FURNACE OIL DUEL FUEL BOILER AT DAIRY PLANT UJJAIN ON TURN KEY BASIS 3RD CALL
On Turn Key Basis Construction of Birpur minor Project Dam and Canal, as per details in scope of work but not limited to that.
On Turn Key BasisConstruction of Bakhari Storage Tank on local nalla, as per details in scope of work but not limited to that.
Construction of Arjun Baroda ghat on Kshipra river on Turn Key Basis As per detailed scope of work but not limited to that.
Construction of Badi Kalmer Ghat on Gambhir river on Turn-Key Basis as per detailed scope of work but not limited to that.
Construction of Betwasa Barrage across Dohi river near village Betwasa Tehsil Jobat, Distt. Alirajpur on turn key basis as per detailed scope of work but not limited to that.
Construction of 4 lane ROB and its approaches at km 14/800 (Jerai) on NH 26A in lieu of existing level crossing No. 19 on Katni Bina section Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar Dist in the state of Madhya Pradesh on EPC Mode
Strengthening work of Road from km 73/4 to 81 Km 83 to 92, 95 to 97.300, 99,100, 104, 105 107, to111, 113, 114, 117 to 119 and 123 Total Km 36.70 of NH- 12A Extn (New NH-539) Shahgarh- Tikamgarh Road on EPC mode in the state of Madhya Pradesh
CS For AE For Supervision of balance work of 4-laning of Indore Gujarat/MP Border from km 106.210 to km 115.250 km 121.740 to 127.140 and Forest portion km 149.800 to km 150.850 km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in Madhya Pradesh
CS for AE for Supervision of 4laning of Indore to Raghav Garh section of NH 59 (Indore-Harda Pkg 1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design Length 26.653 Km) under BMP Phase-I (EC) in MP on EPC Mode
Balance work of Construction of 2lane ROB and its approaches at Km 36/800 (Jarua) on NH-26A in lieu of existing level crossing no. 11 on Katni-Bina Railway line on Railway ch 1011/6-7 on Sagar to Bina Road in the state of Madhya Pradesh on EPC mode.
C/o Centre for Disability Sports at Gwalior (MP) through EPC mode. (SH:- Providing services of Two Nos. Computer Operator, One No. Chowkidar and Two Nos. Peon for day to day functioning up-keeping and maintenance of records of the Gwalior Project Division, Sub-Divisions, CPWD at Gwalior) (3rd Call)