Loading…
Loading…
1,431 results • Best match
Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi (Km. 105.700 to Km. 106.800) on NH25 (New NH27) and Interchange at Km. 97.100 on NH25 (new NH27) for Shivpuri Kanpur Road (Jhansi Bypass) section in Uttar Pradesh on EPC mode
Balance work of four laning of Gwalior Shivpuri from existing Ch. 215.000 (design Ch. 100.757) to existing Ch. 221.500 (design Ch.107.350) section of NH3 passing through Madhav National Park (Total length-6.593 km) in MP on EPC Mode basis.
CS for AE for Supervision of Const of 4laning of NH 45 to Amjhar Road from km 38.400 to Km 98.950(Jabalpur Ring Road Pkg 3 and 4)under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in Madhya Pradesh
Construction of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode.
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Upgradation of Jharkheda- Berasia - Dholkhedi from km 0/000 to km 87/900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode
Construction of 2-lane ROB and its approaches at km 36/800 (Jarua) on NH-26A Katni-Bina Railway line on Sagar to Bina road of Sagar District in the state of Madhya Pradesh on EPC Mode under Setu Bharatam.
Construction of AIIMS at Awantipora (Kashmir), Jammu & Kashmir (on EPC Mode 3 basis) etc. (SH: Providing services of Multi Skilled Computer Operator, MTS etc. for the office of EE&SM(E), AIIMS, Awantipora (Kashmir) Project Zone, CPWD, Srinagar Kashmir, (J&K)
Construction of AIIMS at Awantipora (Kashmir), Jammau and Kashmir (on EPC Mode 3 basis) etc. SH: Providing services of four wheeled inspection vehicle for the O/o Assistant Engineer (Elect.), AIIMS, Awantipora (Kashmir) Project Zone, CPWD Srinagar Kashmir, J and K
Construction of AIIMS at Awantipora (KASHMIR), Jammu & Kashmir (on EPC Mode 3 basis) etc. SH: Providing services of Multi Skilled Computer Operator, MTS etc. for the office of EE & SM(E), AIIMS, Awantipora (Kashmir) Project Zone, CPWD, Srinagar (J&K)
Construction of Road From Tilau Village to Picchore Dinara Road at KM 14/8 to Gajora Village via Chandu Pahari, Manka, Gadrauli, Khurai, Jungipur, Bhitargawa, Manpur Road Total Length 22.90 KM. in the State of Madhya Pradesh on EPC Mode (First
Construction of MSME Technology Centre at Jabalpur (Madhya Pradesh) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 year during DLP
Construction of High Level Bridge including approach road across Jarwahi Nalla on the approach road and approach road of Son River Bridge on Beohari Katni road Via Vijaysota in K.M. 37/10 Distt. Shahdol in the state of Madhya Pradesh. on EPC Mode
Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16km) and Ater realignment to Bhind bypass (Total length 21.50 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of MP on EPC MODE
Engagement of user fee collection agency on the basis of CB at Vishankheda Fee Plaza at Km 283.600 for rehabilitation upgradation of Jabalpur-Bhopal Section of NH-12 to 4lane with provision of rigid pavement on EPC Mode in the state of MP
Construction of Railway Over Bridge in Lieu of Crossing No. 300 in Km 957/16-18 on Bhopal-Bina Railway Section at Km 7/10 (in Mandi-Bamora) on Kurwai-Gudawal Road. District Sagar in the state of Madhya Pradesh. on EPC Mode
One time improvement of existing bypass road from Km 161.700 to 163.100 ( Udaipura) Km 141.200 to 142.000 (Deori) and Km 181.200 to 184.900 (Khargone) Total length 5.09 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode
Consultancy services for Authoritys Engineer for Supervision of Balance work for Rehabilitation and Upgradation of Sidhi-Singrauli section of NH-39(Old NH-75E) Length 105.593 km)to 4 lane with paved shoulder on EPC mode in the state of Madhya Pradesh
Consultancy services for Authoritys Engineer for Supervision of Balance work for Rehabilitation and Upgradation of Sidhi-Singrauli section of NH-39(Old NH-75E) Length 105.593 km)to 4 lane with paved shoulder on EPC mode in the state of Madhya Pradesh
Strengthening work in km 12 to 28, 31, 32, 34 to 47, 50 to 53, 55 to 58 total Length 41.00 km of NH-12A Extn (New NH-539) (Tikamgarh-Prithvipur-Orchha Road) on EPC mode in the state of Madhya Pradesh
CS for AE for Supervision of Construction of 2lane with Paved Shoulder or 4laning of Harda Betul sec of NH47 from Temagaon Ch. km 30.000 to Chicholi Ch. km 80.952 (length 50.952 km) (Harda Betul Pkg2) in Madhya Pradesh on EPC Mode
Construction of 2Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH 19 Km 26.530) near Hinotiya Village near Mehulwa village Sec of NH 346 Vidisha Talbehat of length 48.700 kms in MP (Package 2) on EPC Mode.
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
4-laning of Balwara to Dhangaon section of NH-347BG-753L (Indore to Boregaon-Pkg III) Design Ch.42.260-Existing Ch.45.000 to Design Ch.82.810-Existing Ch.86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on EPC mode
Planning Designing and obtaining all local body approvals and Construction of Lecture hall complex 2 G plus 1 consisting of all Civil E and M works and Services as per conceptual plan and development of BIM models on EPC mode IISER BHOPAL
Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.59km to 2 Lane with paved shoulder configuration along with one time improvement in 5.88 km length in the State of Madhya Pradesh on EPC Mode
construction of centre for disability sport at gwalior mp SH : construction of inddor sport complex hostel bldg out door sports aquatic centre and site development including all services and development work on EPC mode contingecies SH : pdg. services of hired vehicle for gwalior
Excavation, loading of Pond Ash from Ash Dyke of SSTPP and Transportation for Construction of 6- Lane Fly over at MR-10 and best price junction and Overpass and construction of 6-lane VUPs under EPC mode, in the state of MP
Design, EPC Contract for development of 88 MW (UNIT-D) FSPV plant at Omkareshwar Reservoir, dist. Khandwa (MP) along with 5 years Comprehensive O and M of Plant in the solar park developed by RUMSL invited through RFP phase-I
Design and Construction of Industrial Effluent Treatment Plant) based on ZLD including Collection gravity pipe network, Effluent pumping stations, Master Balancing Reservoir(ESR) and Recycled Water Disposal Pipe Network on EPC basis and its Operat
Construction of Nayapada Barrage on turn key basis as per detailed scope of work but not limited to that.
On Turn key Basis Construction of Palsodi Earthen dam on local nalla near village Palsodi tehsil Ratlam district Ratlam
Red oxide and aluminium paint works on fabricated steel material in semi turn key mode under OnM Circle Mandsaur.
Construction of Slab Culvert for Pachdhar Garvha Road Near First CD in Submergence of Parasdoh Medium Project (Turn Key)
Construction of Boriya Barrage on turn key basis as per detailed scope of work but not limited to that.
Construction of Tirmau Barrage on Turn Key basis, as per detailed scope of work but not limited to that.
On Turn Key Basis Construction of Chhatri Barrage as per detailed scope of work but not limited to that.
Red oxide and aluminium paint works on fabricated steel material in semi turn key mode under ONM Circle Neemuch
Planning, design and Construction of composite dam on river Ken of approx height 96.7 m above deepest foundation level and its ancillary works on EPC basis.
CONSULTANCY SERVICES AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 Total Leangth 81.300 km in the State Of Madhya Pradesh On EPC Basis Total Leangth 81.300 km
UPGRADATIONOF BEGUMGANJ SAGAR ROAD (SH-86A) TO MAHUAKHEDA KLAN-GORKHA-PADARIY RAJADHAR-RATANHARI TO SILWANI SAGAR ROAD (SH-15)L ENGTH-37 KM UNDER CRIF on EPC Mode under PWD (B and R) DIV.RAISEN IN THE STATE OF M.P. Est. cost Rs.6173.55 lacs
Consultancy Services for Authoritys Engineer for Supervision of Construction of 4 lane ROB and its approaches at km 14.800 (Jerai), at km 36.800 (Jarua) and km 72.000 of NH 26A on Sagar to Bina road in the state of Madhya Pradesh on EPC Mode
Engagement of user fee collection agency on the basis of EQ through etender for Marri FP at Km 24.555 of NH 543 for use of Balaghat Gondia sec of NH543 from km 0.000 to km 41.200 under Bharatmala Pariyojana in Madhya Pradesh on EPC Mode
CONST. OF SHAITAN SINGH CHOURAHA TO MANISHA MARKET-BANSAL HOSPITAL-SWARAN JAYANTI PARK- BAWADIYA TIRAHA TO KOLAR RD. Ln. 6.12 KM. BPL On EPC Mode under PWD CAPITAL DIV. No-1 BHOPAL the State of M.P. Est.cost Rs.3044.90 lacs work period 540 days
One Time improvement of existing bypass road from Km 278 plus 650 to 281 plus 850 obedullaganj and Km 272 plus 200 To 269 plus 000 Goharganj Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode
Upgradation of Goras to Shyampur Road section of NH-552 Ext., from Design Chainage 48.400 to 111.800 Km (Total length 63.40 km) to 2 lane with paved shoulder configuration along with OTI of 8.91 km in the state of Madhya Pradesh on EPC mode
Construction of LVUP/VUP at Km. 332.900 Jhirniya at Km 357.420 Hingoni at Km 378.490 Badodia Talab at Km 395.600 Gadiya and at Km. 390.950 Narsinghgarh Junction on Lalghati 315.725 to Biaora 421.325 section of New NH46 in the state of MP on EPC mode
Balance work for Rehabilitation and Up-gradation of Sidhi Singrauli from km 82.400 to km 187.993 section of NH-39 (Old NH-75E) (Design Length 105.593 km) to four lane with paved shoulder in the state of Madhya Pradesh on EPC mode under NH(O)
One Time Improvement for Km. 1 to 23 and Black Spot Near Dudhiya Power House, smooth merging and diverging of junctions and repairs of old drains and RCC drain of Indore Betul Road NH-47 in the State of Madhya Pradesh on EPC Mode
CS for AE for Supervision of Const of 2Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 near Hinotiya Village to Design Km 75.700 near Mehulwa village Sec of NH346 Vidisha Talbehat of length 48.700 km in MP(PKG2) on EPC Mode