Loading…
Loading…
1,431 results • Best match
ONE TIME IMPROVEMENT FOR NANASA BYPASS, KHATEGAON BYPASS, SANDALPUR BYPASS and KHEDI,MAHADGOAN, DHARGOAN, DHSNORA, BHADUS, AT CHHIRAPATLA OF INDORE - BETUL ROAD NH - 47 IN THE STATE OF MADHYA PRADESH ON EPC MODE
Balance work of widening and upgradation to two lane with paved shoulders of Pawai-Saleha-Jasso-Nagod section of NH-943 (Length - 12.49 Km) in the state of Madhya Pradesh on EPC Mode.
Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh.
Strengthening work from km 8.40 to km 20.7 (12.3 km) By Using Waste plastic material on NH-69 on EPC mode under NH division Bhopal in the state of Madhya Pradesh(4th Call)
4-Laning of Khandwa bypass from Rudhi to Deshgaon Km 149.000 to Km 177.680 section of SH-71-NH-347B-NH-753L (Betul-Khandwa Pkg-V) in State of MP on EPC Mode
Construction of Eight Lane access-controlled Expressway from Rajasthan MP Border to Jodmi village of Mandsaur district section of Delhi-Vadodara Greenfield Alignment under BMP in the State of MP on EPC mode
Design and Reconstruction of RE wall Approaches of ROB at km 109.900 and 121.045 in Shivpuri Bypass of Gwalior-Shivpuri Section of NH-46 in the state of Madhya Pradesh on EPC mode
Consultancy Services For AE For Supervision of Four laning of Katni-Bypass of NH-7 from km 359.500 to km 378.500 length 20 km in the State of Madhya Pradesh on EPC Mode
P R work of khurai bypass road from km 129/200 to 139/038 on NH-934 sagar - khurai- bina road (length 9.838 km) in the state of Madhya Pradesh on EPC mode
Construction of AIIMS at Awantipora (Kashmir), Jammu & Kashmir(on EPC Mode 3 basis) etc. (SH:- SITC of Hot and Colt Split ACs and providing EPABX System in Zonal Office, EE&SM(E) Office).
Construction of Fly Over Bridge From Laukhedi Sewage Pump House to Nagar Nigam Visarjan Ghat, Sant Hirdaram Nagar (Bairagarh) in Bhopal City Distt .Bhopal in the state of Madhya Pradesh. on EPC Mode
Supply, Installation, Testing, Commissioning of ICT EQUIMPENTS on Turn key basis bid proposal
Design, EPC Contract for development of 8 MW Ground Mounted SPV Plant at Sanchi, Dist. Raisen, MP incl evacuation arrangement up to DISCOM substation along with 5 Years Comprehensive OandM of plant under KUSUM-C as perRFPinvited by MPUVNL
Landscaping work including tree plantation along Roads, Street Furniture, etc.
One Time Improvement In Bhoura Town Portion, Shahpur Town Portion and Padhar Town Portion on NH 69 (Old) NH 46 (New) Itarsi Betul Road in the State of Madhya Pradesh on EPC mode (4th call)
Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh
Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH543 (Design Length 41.210 Km) under BMP in Madhya Pradesh and Maharashtra on EPC Mode
UPGRADATION AND RECONSTRUCTION OF UJJAIN SIMHASTH BYPASS ROAD FROM DESIGN CH. 0.000 TO CH. 19.815 TOTAL LENGTH 19.815 KM, FOUR LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF MADHYA PRADESH ON EPC MODE
Strengthening work from km 51 to 56 and 60 to 87 total length 34 km on NH-86 (New NH -934) on EPC mode under NH division Sagar in the state of Madhya Pradesh
Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
Periodical Renewal works in km 111 to 117,121,123 to 125,128 to 140,144,148,150 to 152,154 to 159 of Chanderi-Mungawali-Bangla Chouraha road on NH-346 on EPC mode in the State of Madhya Pradesh
Construction of AIIMS at Awantipora (KASHMIR) Jammu & Kashmir (on EPC Mode 3 basis). SH: Providing services of computer operator, MTS and Security Guard for the office of CE cum ED AIIMS (Kashmir) Awantipora, Project.
Construction of AIIMS at Awantipora (KASHMIR) Jammu & Kashmir (on EPC Mode 3 basis). SH: Providing services of Computer Operator, MTS and Security Guard for the office of CE cum ED AIIMS (Kashmir) Awantipora, Project.
Design and Construction of Flyover at Sijwaha Tiraha at Ch 1377.750 on Shivpuri Jhansi section of NH27 for permanent rectification of MoRTH identified Blackspot location in the State of Uttar Pradesh on EPC Mode
Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner-MP-RJ Border Road Total length-46.100 Km section of NH-752B in the State of Madhya Pradesh under EPC mode
Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode
Strengthening of NH-543 Balaghat-Nainpur-Mandla-Dindori-Sagartola-Shahdol road in of Dindori-Sagartola stretch, of Sagartola-shahdol stretch Total Length 47.182 Km in the state of Madhya Pradesh on EPC mode
Construction of additional lanes to act as truck parking/lay bye in Sohagi Ghat stretch on Mangawan to MP/UP border section of NH-30 in the state of Madhya Pradesh on EPC mode (2nd call)
Construction of Bridge in Parakhati Tank Project Spill Chanel at RD 120m.(Turn Key)
Construction of Sambardev Earthen Dam on local nalla District Burhanpur on turn key basis
Construction of High Level Bridges on Lukwasa Chandanpura Ougharpur Road Across Keldhara River in KM 13/6 and Karai River in KM 16/6 in District Shivpuri the State of Madhya Pradesh on EPC mode.
Construction of 2-lane with paved shoulder configuration of Shujalpur Bypass, from Km 33/100 to 43/570, design length 10.47 Km section of NH-752C in the State of Madhya Pradesh under EPC mode
One Time Improvement of existing inner town portion of Vilayat Ghat Chandiya bypass of NH-43 E (Old NH-78) (Total Length 5.72 Km) in the State of Madhya Pradesh on EPC Mode (3rd call)
Balance work for construction of 2-lane with paved shoulder from km 80.800 to km 85.250 (Satna-Maihar) section of NH 135BG (design length 4.450 km) in the state of Madhya Pradesh on EPC mode
Construction of High Level Bridges on Lukwasa Chandanpura Ougharpur Road Across Keldhara River in KM 13/6 and Karai River in KM 16/6 in District Shivpuri the State of Madhya Pradesh on EPC mode.
Design, Construction, Testing, Commissioning of 33 11kV, 2 x 5MVA Substation works and 11 .433kV, 9 x 0.5 MVA Substation works for Government buildings under Smart City Project
Consultancy Services for Authoritys Engineer for Supervision of Construction of High Level Bridge across Jamni River on Tikamgarh-Jhansi road and Betwa River on Orchha-Tikamgarh road in the State of Madhya Pradesh on EPC mode
Consultancy services for Authority Engineer for Supervision of four lane elevated road Fly Over on Swarn Rekha Nalla from IIITM College to Maharani Laxmibai Pratima in Gwalior City ON EPC Mode under Pwd Bridge Division Gwalior
Upgradation of Baktara Bharkachha road to Dehri Bamhori Somalwada Nonbhet Nandner Kheri silgena Jontala Jait Sardarnagar Hathnora Sudaniya Baneta to Shahganj road of Length 55.00 km On EPC Mode First Call Est. Cost Rs. 10035.99 Lacs
Construction of balance work for widening to 2 lane with paved shoulder from km 80.700 to km 93.400 length 12.700 km of NH-76 (Deori- Harpalpur section) on EPC mode in the state of Madhya Pradesh
Construction of Underpasses VUP LVUP SVUP for long term mitigation measures on MoRTH identified blackspots and other Potential Blackspot locations in Lakhnadon section of NH 34 and Sleemnabad to Lakhnadon Section of NH30 on EPC Mode.
CS for AE for Supervision of Cons of 4lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 of NH543(Design Length 41.210 Km)under BMP in Madhya Pradesh and Maharashtra on EPC Mode.
Engagement of user fee collection agency on the basis of CB through e-tender for Vishankhedafor rehabilitation and up-gradation of Jabalpur-Bhopal section of EPC mode under NHDP-III in the state of Madhya Pradesh
Rehabilitation and Upgradation of Kundam to Shahapura section of NH-45 from design Km 68.100 to 103.700 (Total Length- 35.600km) to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC Mode
Strengthening of Service road from Ch. 315.725 to Ch. 323.350 with white topping and reconstruction with PQC from Ch. 323.350 to 324.000 on Bhopal Biaora section of NH46 in the state of MP on EPC mode
CS for AE for Supervision of 7 Nos. of NRCW projects on EPC Mode on Taloda Burhanpur section of NH 753BE Tarsod Fagne Section of NH 53 passing through Jalgaon city in the State of Maharashtra
Construction of Ishwarpur weir scheme in block Deori District Sagar(MP) on TURN KEY basis
Supply, Installation, Testing, Commissioning of (computer lab and stadium chairs) Furniture on Turn key basis
Balance work of rehabilitation and construction of Barela Mandla section of NH-30 from km 22/8 to 89/6 (length - 63.55 Km) two lane with paved shoulder in the State of Madhya Pradesh on EPC mode