Loading…
Loading…
25,857 results • Best match
Widening and strengthening of Existing 2L plus PS to 4lane plus PS from Km 150.000 to Km 159.000 and Km 165.400 to Km 186.000 of NH163 Old NH202 under NH O TSP for the year 2020 21 on EPC Mode in the State of Telangana
Rehabilitation of existing distressed Irrinchi Bridge at Km 32.80 Sepua Bridge at Km 67.53 Kharipukuria Nachinda Bridge at Km 39.32 and Henria Bridge at Km 27.528 of NH-116B in the District of Purba Medinipur in EPC Mode. Job No. NH116B WB 2025 26 5
Construction of 6 lane flyover for Long Term Rectification of the Blackspot ID-MH-(06)-167 at Kohmara Junction from km 436.036 to km 437.895 on Wainganga Bridge to CH/MH border section of NH-53 in the state of Maharashtra on EPC mode
Long term remedial measures for Elimination of Black Spots ID TN(02)-441,TN(03)-08,TN-028, TN-(02)-308 at isolated locations from Chengalpattu (Km51.000) Tindivanam (Km121.000) section of NH-45 (New NH-32) in the state of Tamil Nadu on EPC Mode
Construction of 05 nos. of VUP i.e. at Km. 434.150, Km. 452.150, Km. 456.000, Km.462.670, Km. 466.270 and 01 no. Flyover at Km. 442.610 with Approach Roads, in Puintola to Icchapuram Section of NH 16 in the State of Odisha on EPC Mode
Construction of approaches to ROB at Km 27/800 (95 A and B at Km 31/19-23 in Tambaram and Perungalathur Railway Stations) in the Tambaram Tindivanam section of NH-32 (Old NH 45) in the State of Tamil Nadu on EPC mode
UPC N/02010/03003/TS Construction of 6Lane Underpasses (3 Nos) and allied works on Existing 4Lane Hyderabad to Bangalore Section of NH44 from km 162.915 to km 188.540 in the State of Telangana on EPC Mode, as part of Long-term Rectification of MoRTH
SSI, DEVELOPMENT, LAYOUT, DSGN, DWG AND CONSTR OF 12 NOS TYPE- III AND 06 NOS TYPE- IV PMT MARRIED ACCN FOR SUBORDINATE OFFRS OR OFFRS AT CGDHQ- 10N LAL TEKRI, CAMPBELL BAY IN ANDAMAN AND NICOBAR ISLAND UNDER 46 BRTF PROJECT PUSHPAK THROUGH EPC MODE
CONSTR AND UPGRADATION OF RD KHALSAR AGHAM SHYOK TO DOUBLE LANING FM AGHAM TOWARDS SHYOK FM EXISTING CHAINAGE KM 34PT14 TO KM 70PT15 (DESIGN CHAINAGE KM 32PT04 TO KM 66PT620) (NET LENGTH 3PT58 KM) ON EPC MODE UNDER PROJECT HIMANK IN UT OF LADAKH
Improvement Augmentation of Two lane with Paved Shoulders from Km 1.600 to Km 16.690 and Km.29.850 to Km.80.133 of Nagapattinam Thanjavur Section of NH 67 Old New NH-83 Total Design Length 65.373 Km in the State of Tamil Nadu on EPC Mode
CS for AE for Supervision of Development of 6 lane access control GF highway of Delhi-Saharanpur-Dehradun under BP from Junction of EPE Vill-Mavikalan Design Chainage 0 to 56.500 Vill-Karaunda Mahajan in UP on EPC Mode under BP Phase-I PKG-I
CS for AE for Supervision of 4 laning of Jagadhri Tajewala road sec from Yamunanagar bypass (Design Ch.0.223) to Tajewala (Design Ch.32.300) of NH 907(Old NH 73A) under NH(O) (Design length 32.523 km)(Pkg 1) in Haryana on EPC Mode
Completion of Balance works (item rate and EPC mode) and Operation of Maintenance of Tirupati-Tiruttani-Chennai Section of NH-205 from Km 274/800 to Km 338/030 in Andhra Pradesh and from Km 0/000 to Km 61/470 in Tamil Nadu
CS for AE for Supervision of Const of 2Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 near Hinotiya Village to Design Km 75.700 near Mehulwa village Sec of NH346 Vidisha Talbehat of length 48.700 km in MP(PKG2) on EPC Mode
Elevated Kagal Satara Const. of 6L EC from KM 612.582 to KM 617.540 incl. const. of flyover towards Kolhapur City on NH48 in FAZ of Kolhapur Descoped work of Kagal Satara PKG1 Second level Ramp KM 0.000 to KM1.263 in MH on EPC mode.
Permanent Rectification of Blackspots TN-02-574, TN-02-395, TN-02-268, TN-02-092, TN-02-464, TN-02-153, TN-02-320 in Salem - Ulundurpet Section of NH-79 (Old NH-68) in the State of Tamil Nadu on EPC mode
CS for AE for Supervision of Construction of 4L GF Highway from Chatrapur on NH16-Gopalpur port (Km 0.000-km 4.500) and upgradation to 6L elevated configuration of existing NH16 (Km 429.025-km 430.990) under BMP in Odisha State on EPC Mode (2nd Call)
CONS AND UPGRAD TO NHDL SPEC INCL MINOR BRIDGES FROM KM 24PT500 TO KM 33PT460 (DESIGN CHAINAGE KM 22PT400 TO KM 31PT360) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR AGHAM SHYOK UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 8PT960 KM)
Construction of Eight Lane expressway from SH-175 near Baletiya village of Panchmahal to SH-63 near Pratap Nagar village of Vadodara (Ch. 803.420 to 824.920 design Ch. 351.000 to Ch.372.500)Delhi-Vadodara GA (NH-148N) on EPC Mode under BMP in Gujarat
Engagement of user fee collection agency on the basis of competitive bidding through for Peont Fee Plaza on Jind-Karnal section i.e. junction with Narwana road at Subhash Chowk and ends at ITI Chowk of NH-709A on EPC mode in the State of Haryana
CS for AE for Road Safety Improvement of existing Four Lane Section of Dehradun Lal Tappar Nepali Farm Section of NH-7 (501.930 to 531.330) and Nepali Farm Motichur Section of NH-34 (531.330 to 538.750) on EPC Mode in Uttarakhand under NH (O).
Upgrad to 2 Lane with paved shoulder 4lane of SHirwal to Lonand sec from Km 159.900 to Km. 186.828 of NH965DD and 2lane with paved sholders of Lonand to Satara Sec from Km 184.994 to Km 2287.131 of NH965D in Maharashtra on EPC mode.
Permanent rectification works at MoRTH identified Black Spots of 2015-18 at Thipparthy (ID TG 02 192) by constructing Service Roads from Km.112.800 to Km.113.730 on BHS on Hyderabad-Vijayawada section of NH 65 in the State of Telangana on EPC mode.
construction of VOP at Ch 217 400 along with slip road from Ch 217 06 to Ch 217 68 and slip road from Ch 194 71 to Ch 195 08 at Sangli Borgaon section of NH 166 in the state of Maharashtra on EPC mode
Construction of 6-lane access controlled GH from km35.000 to km67.000 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP(Phase-I)AJ-RGBS-Package-2
Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JK (Phase II-PKG-XVIII)
Consultancy Services for AE for SC of 6-lane access controlled Greenfield highway from km 67.000 to km 130.073 of RGBS section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in Gujarat on EPC mode under BMP (Phase-I) Package-10
Construction of Balance work of 2 Laning with Paved Shoulder from Km 30.800 to Km 70.800 and 2 Laning without Paved Shoulder with Rigid Carriageway from Km 70.800 to Karnataka-Goa Border km 84.120 of NH-4A in the State of Karnataka on EPC mode
CS for AE for Supervision of Construction of 6-laning from Belgaum to Sankeshwar Bypass from Km.515.000-Km.555.017 (Package-I) and Sankeshwar to MH-KNT Bypass from Km.555.017-Km.592.853 of NH-48 in Karnataka under BMP (Package-II) on EPC mode
Permanent Rectification of Black Spot TN-02-131 by constructing a Vehicular Underpass 12m x 5.5m at Km 93 704 in the project of Kumarapalayam Chengapalli section of NH-544 (old No. NH-47) in the State of Tamil Nadu on EPC mode 2nd Call
Construction of Long Term Measures for Rectification of MoRTH Identified Blackspots at location 1) Lambha Junction at ch. 9.568, 2) Bhumel at ch. 66.150 3) Channi at ch. 108.160 on Ahmd-Vadodara Section of NH-48 in the state of Gujarat on EPC Mode.
Construction of 6-lane access controlled GH from km4.888 to km35.000 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP (Phase-I)AJ-RGBS-Package-1
Permanent Rectification of Black Spot TN-(02)-115 by constructing a Vehicular Underpass (VUP) (20m x5.5m) at Km 80200 (Sikkaraimedu Jn.) in the project of Hosur-Krishnagiri section of NH-7 (New No. NH-44) in the State of Tamil Nadu on EPC Mode
Construction of Elephant Underpass (from km. 153.853 to km 153.953) Flyover (from km 137.966 to km 138.034) 2 no. Box Culverts (km 153.679 and km 137.761) and other road safety works in Kharagpur Chichra section of NH-06 in West Bengal on EPC Mode
Consultancy Services For AE For Supervision of 4-laning of Balwara to Dhangaon section of NH-347BG and 753L (Indore to Boregaon-Pkg III) Design Ch. 42.260 to Design Ch. 82.810 under Bharatmala Pariyojana Phase-I in the State of MP on EPC Mode
Construction of 2 nos of Flyover on Omarpur Junction of NH34 from Design Ch. 245.50 to Design Ch. 247.500 (Length2.0 km) and on Dhulian Junction of NH 34 from Design Ch. 274.300 to Design Ch. 276.500 (Length2.2 km) in West Bengal on EPC Mode
Consultancy Services for AE for SC of 6-lane access controlled Greenfield highway from km 4-888 to km 67-000 of RGBS section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in Gujarat on EPC mode under BMP Package-9
Consultancy services for AE for Supervision of Construction of New Twin tube 6-lane tunnel at Khambatki Ghat section of NH-4 and its approaches from existing km.771.730 to existing km.782.000 in the state of Maharashtra under NHDP Phase-V on EPC Mode
Consultancy services for AE for Development of 6-lane green field Ring Road (Package-III) starts from Ch.51.200-Ch.68.650 around Kanpur City and Construction of 4-lane Airport link road at 62.090 of Kanpur ring road in Uttar Pradesh on EPC mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.
Construction of 2 no. of Grade separated interchanges at Km 113.730 (Ranchi-Hazaribagh Road) and Km 139.225 (Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in Jharkhand on EPC Mode under NH(O).(Total Length 6.06 km)-2nd call
Consultancy Services for AE for Supervision of 4 Laning of existing 2 laning stretch from A Mohol at Pkg-I B Wakhri to Khudus a Pkg-II C Khudus to Dharampuri Pkg-III sections of NH 965 in the State of Maharashtra on EPC Mode
AE for Construction of 6lane Greenfield corridor from Ramnagar to Kacchi Dargah NH 119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
Cons of Flyover for LongTerm Rectification of 4 MoRTH Identified Blackspots at Jolhupur jn Km. 1534.215 Chaura Bakra Mandi Km 1544.300 Patel Chowk jn Km 1556.285 and Premium Factory Kota jn Km 1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Consultancy Services for AE for Supervision of 8 Lane ACE starting from Junction with NH-47 near Bhamaiya village with NE-1 near Dodka village of Vadodara Dist of Delhi-Vadodara Greenfield NH-148N on EPC Mode under BMP in the State of Gujarat
Construction of 2.20 Km Long Service Road and a Foot over Bridge at Km 374.270 near ECEK Union High School for Permanent Rectification of MoRTH identified blackspots on Kochi to Kollam section of NH 66 in the state of Kerala on EPC Mode. Pkg 8
Construction of LVUP at Ajjagondanahalli at grade Junction Ch.82.410 KA 02 466 and Nelahal at grade Junction Ch.91.000 KA 02 175 Under road safety for rectification of Block spot of Tumkur Chitradurga from Km 75.00 to 189.000 of NH 48 Under EPC Mode
CS for AE for Supervision of Construction of 6-lane from km 72.0 to km 150.0 of Deogarh to Rajasthan-Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under BMP AJ/Construction Supervision/Pkg-7
AE For Rehabilitation and upgradation of existing road to 2-lane with paved shoulders configuration in Purulia-Chandil section of NH-32(Km 70.524-Km 84.000) and from Km 94.300-Km 153.705 with NH-33 in West Bengal and Jharkhand(NHDP Ph-4B EPC Mode)
Construction of new link of Sahibganj Bypass in Jharkhand to Km 15.885 Junction of NH-133B and 131A on Manihari Bypass Km 0.000 Junction of NH-133B and 131A near Narenpur of NH-131A in including Ganga Bridge to 4 lane standard on EPC mode.