Loading…
Loading…
25,857 results • Best match
Long-term Rectification of MoRTH identified Blackspots by 1. TG 03 23 ii. TG 03 26. iii. TG 04 24. iv. TG 04 26 on Nagpur to Hyderabad section of NH 44 from Km.412 to 439 in the state of TG on EPC mode.
Consultancy Services for AE for Construction of new 6-Lane Access Control Prayagraj Southern GF Bypass from design Km 34.400 (near Dandupur) to design Km. 43.200 (near Mahuwari) Total length 8.800 Km PKG-1 under Phase-I in UP under NH(O) on EPC mode
CS for AE for supervision of (i) Operation and maintenance of 4Laning of Udhampur Ramban Section of NH1A(now NH44) from Km67.00 to Km89.00 Km130.00 to Km. 151.00 on EPC Mode in J and K under NHDP PhaseII during Defect Liability Period ii Construction
Providing the laying of Optical Fiber Cable from km 697.220 (MP-Gujarat) to km 844.800 of Delhi-Vadodara expr. and km 26.600-378.722 of Mumbai-Vadodara Expressway and from km 0.000-79.900 of spur to JNPT on EPC mode in Gujarat and Maharashtra (PKG-II
Upgradation andrehabilitation of road stretch from 1Athal Jun to Luhari Jun Ch.0 plus 000 to Ch2 plus 000and Luhari Jun to Kanadi JunCh.2plus 000 toCh5 plus100 and 2 Naroli Jun to Kanadi Jun toAnklas Border Ch00 plus 000 toCh 03plus730 EPC Mode
Restoration and rehabilitation of road from km. 134/00 to km. 202/00 (Length 68.00) on NH-102A i/c protection/slide slope works by retaining wall etc. at essential places and 50 nos. of HP culverts on EPC mode in the state of Manipur
Balance work of Widening to 2 lane with geometric improvement from km 60.00 to km. 64.825 (Actual chainage as per site km. 59.700 to km. 64.525 on NH-507 in the State of Uttarakhand under EPC Mode in NH(O) the year 2023-24
RECONSTRUCTION OF MINOR BRIDGES AT KM 99.800 TO KM 100.600, KM 98.400 TO 98.800 GEEDAM NALLA AND MAJOR BRIDGE AT KM 59.000 TO 59.600 GUTER NALLA ON NH-30 OLD NH-221 JAGDALPUR SUKMA KONTA ROAD IN THE STATE OF CHHATTISGARH ON EPC MODE
Construction of proposed 2 lane ROB and its approaches in lieu of existing Level Crossing No.120 at Km.56.700 of NH18 (New NH40)under Setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021 22 on EPC MODE
Up- gradation and Rehabilitation of Section of NH 361F- Parli- Gangakhed- Loha Road for up- gradation to Two Lanes with paved shoulder / Four lane configurations on EPC mode Km. Parali (71/050) to Gangakhed (40/650) Design Chainage Km. 0/00 to Km. 30
Construction of 2 Lane Barpeta Bypass from Km 77.900 (Baradi) to Km 86.150 (Deurikuchi) (Length 8.25 Km) on NH-427 in the state of Assam under EPC Mode (Job No.427/AS/2022-23/245) (Construction of Site Camp cum Office under contingency provision)
Construction of Bhabhua Bypass from Ch.10.800 to Ch.19.860 and Chand Bypass from Ch.38.060 to Ch.40.460 and widening of existing road to 2lane with Paved shoulder from Ch. 40.460 to Ch.46.860 of NH219 Total length16.150 Km under EPC Mode in Bihar.
Work of widening to two lanes with paved shoulder (except in flyover part of 500m) from Km 122.15 to Km 138.20 of NH-114A within available RoW in the State of Jharkhand under EPC mode (working length of the project as per TCS 14 Km).
Widening and Strengthening/ Reconstruction of Existing Pavement to Two Lane with Paved Shoulder including Replacement of Culverts, for NH-22 (Old NH-99) from Km-11.200 (Bihar-Jharkhand Border) to Km-30 Km Under NH(O) on EPC mode in the state of Jhark
Rehabilitation Upgradation 2 lane PS Existing Chaing km 166.100 to 192.980(DC km 146.600 to 162.800)(PKGVII)incl constn of Bhimber Gali tunnel (length 1.100) under 31 TF on Akhnoor Poonch road (NH144A)in the UT of JK under Project Sampark on EPC mode
WIDENING and STRENGTHENING OF 2/4 LANE TO 4 LANE CARRIAGEWAY FROM KM 6/0 TO 15/0 OF KURNOOL GUNTUR ROAD (NH-340C) IN KURNOOL DISTRICT (KURNOOL MUNICIPAL CORPORATION LIMITS) IN THE STATE OF ANDHRA PRADESH THROUGH EPC MODE OF CONTRACT UNDER NH(O).
Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km. 133.025 to Km. 133.875 on on Jalna- Pulgaon Road NH753C (total Length 850 m) Tal. Malegaon, Dist. Washim on EPC mode in
Widening to 2-lane with Paved shoulders of Dornala to Kunta Junction from Design Chainage Km 244.000 to Km 267.990 (Existing Km.244.000 to 268.700) section of NH-765 (Package-2) in the State of Andhra Pradesh on EPC mode for the year 2022-23
Strengthning of Panvel-Mahad-Panji Road N.H 66 from Km. 450 170 to 471 300 (Zarap to Patradevi Section) in streches from Km. 452/000 to Km.455/500 Km. 460/000 to Km.471/300 in the state of Maharashtra on EPC mode
Widening to Four Lane with Paved Shoulders from Design Chainage Km 27.78 SH Chainage Km 459.5 to Km 57.32 SH Chainage Km. 489.04 Belur Hassan section of NH 373 in the State of Karnataka in EPC mode JOB No NH 373 KNT 2022 23 988
Construction of 6-lane access controlled GH from km99.000-km130.073 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP(Phase-I)AJ/RGBS-Package-4
Construction of 4 lane divided carriageway of Missing link section of NH 39 (Rewa Bypass) from Junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH9 (design length 13.100km) under BMP in the State of MP on EPC mode.
Construction of 6lane elevated flyover inclu reconst. rehab of exist pavement Km 406.100 to Km 411.150 at Gobindpur area in the Barwa Adda Panagarh sec of NH19 from Km.398.240 to Km.521.120 inclu Panagarh Bypass in the State of Jharkhand on EPC Mode
Treatment of landslide zone 02 Location (Ch 100.572 to 100.792 KM on NH-09 and Ch. 170.075 km to 170.150 km and Ch. 170.350km to 170.325) on NH-125 (New NH-09) in the state of Uttarakhand under Annual Plan 2024-25. (under EPC mode
Rehabilitation and Upgradation of Nongstoin Wahkaji section of Project Road Km 0.00 to Km 43.060 To intermediate lane with earthen shoulder under SARDP NE phase A in the state of Meghalaya on EPC mode. Job No. SARDP NE Nong Dong Maw MG 2020-21 294
Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode
Reconstruction Of Existing Pavement To Two Lane With Paved Shoulder of two LCs RBK-24 From KM 160.121 To KM 161.861 andRBK-26FromKM 163.768 To KM 165.568 Of NH 75-E (New NH 20) under Special repair in The State of Jharkhand on EPC mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Balance works of 4 lane divided carriageway of Missing Link section of NH-39 (Rewa Bypass) from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH-9 (length 13.100 km) on EPC Mode under BMP in Madhya Pradesh
Rehabilitation and Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 and km.35.400toKm.52.345(Design len.-24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to Bihar Border and Bihar Border to Majhauli)on EPC mode in the State of UP
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex, New Delhi under EPC Mode-I (SH - Providing Various Services for the Office of CEcumED, IITDPZ and EEandSM, IITPD-1, CPWD, New Delhi).
Planning, Design and Construction of 3 Nos Police Stations 6 Nos Police Posts and Womens Hostel for Delhi Police including all Civil, E and M, Plumbing, Horticulture and Development work on EPC mode-I basis (Design and built). (SH- Providing Third Party Quality Assurance Services)
Planning, Design and Construction of Two nos. of Academic Blocks 16A & 16B, (2 Basements, Stilt, 7 Floors) at Delhi School of Economics Complex, North Campus, University of Delhi, Delhi including Civil, E&M, Plumbing, Horticulture and Development ... on EPC Mode -1 ...
Balance work of Rectification of Blackspot by Construction of Approach road with RE Wall at Sathoor Junction Flyover from Ch. 201.050 to 202.005 (BHS) on Deoli Kota section from Km 167.624 to Km 250.144 of NH 52 in the State of Rajasthan on EPC mode
Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 760 BRTF on road SBU NH01 in UT JK under project BEACON BRO on EPC Mode
One time improvement of existing bypass road from Km 216 plus100 to 224 plus 249 Badi Km 195 plus 127 to 203 plus 250 Bareli Total length 16.27 Km of NH 45 old NH 12 in the State of Madhya Pradesh under EPC mode
Construction / Improvement of Patrolling Track (Paver block) along BS Fence including strengthening of BFL Poles and Culverts in entire IB under Jammu Ftr. (SH: Works under Jammu Ftr. in District Jammu, Samba & Kathua on EPC mode, Package-II. BOP Jai Kishan to BOP OP Chenab).
Upgradation of MP/RJ border-Sheopur-Goras road section of NH-552E from Design Chainage 0.000 to 48.400 Km (Total length 48.40 km) to two Lane with paved shoulder configuration along with OTI of 16.6 km in the state of Madhya Pradesh on EPC mode
Upgradation of old NH-7 from 2-Lane to 4-Lane Divided Carriageway in Seoni Town for a Length of 12.67 Km. and Construction of New ROB for a Length of 630m (approx.) in Seoni Town in the State of Madhya Pradesh on EPC Mode.
CONSTRUCTION OF UPGRADATION OF MAU PADNA TALEN ROAD UNDER CRIF LENGTH-25.50 KM ON EPC Mode under PWD (B and R) DIVISION RAJGARH IN THE STATE OF MADHYA PRADESH Estimated cost Rs. 6563.38 lacs work period 540 days I/c rainy season First call
Construction of 4-lane Gauripur Bypass starting from Km. 852.560 of NH-31 and Terminating at Km. 862.170 via khudimari Pt-II, Fulkumari, Charaldanga, Sajuakuti, Geramari PtIII and meeting at Km 862.170 of NH-17(New)/NH-31(Old) in Assam under EPC Mode
Construction of 6-lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under Bharatmala Pariyojana (Ph-I)(AJ/DRGB-Pkg-4
Construction of 6-lane LVUP and its approaches with slip road at km 206.420 on Rewa to MP/UP Border section of NH-30 (Old NH-07) at junction with intersecting road Baikunthpur Mangawan, district Rewa in the state of Madhya Pradesh on EPC Mode
1.Construction of 2 flyovers of 4lanes at Chhatauni Chowk and Awadesh Chowk 2. Reconst of 3no. of gantry girder gates.3 Const. of Service Road and Drain near Piprakothi on NH27 (Under TOT) in the district of East Champaran in Bihar on EPC Mode
Construction of 250 Nos. Type-II qtrs. (S plus 6), in EPC mode 1, at CISF SSG Campus Geater Noida (UP). (SH: Providing skilled/semi-skilled and Unskilled workers for smooth functioning of Additional Director General Lucknow) office and Sub-Division-06 office) Subwork/Packages: civil work
Widening of existing two lane to four lane with paved shoulders road and improvements from Km 302/60 to Km 306/60 of NH 948 including CD works Drain works in Tamil Nadu on EPC basis
CONSULTANCY SERVICES AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 Total Leangth 81.300 km in the State Of Madhya Pradesh On EPC Basis Total Leangth 81.300 km
6 Laning of Pune Hyderabad section of NH 65 from km 493.000 to 524.000 from Sangareddy X roads to Madinaguda excluding BHEL flyover from km 520.000 to 521.650 in the State of Telangana on EPC Basis
Design, Construction, Testing, Commissioning of Potable Water Supply Network and Sewerage Collection Systems including Sewage Treatment Plant with associated works for ABD Area on EPC Basis including 5 year of Operation and Maintenance at Port Blair
Solid Waste Processing Treatment and Scientific Disposal Facility on EPC Basis at Gat No 864 Avahane Shivar Site for JCMC and its comprehensive Operation and maintenance of the said project for a period of 7 years