Loading…
Loading…
25,857 results • Best match
Construction and upgradation of Tato Menchuka road design chainage km 33 pt 100 to km 41 pt 275 and existing chainage km 36 pt.00 to km 45 pt 410 to 2 lane with hard shoulders under Project Brahmank in the state of Arunachal Pradesh on EPC Mode
UPGRADATIONOF BEGUMGANJ SAGAR ROAD (SH-86A) TO MAHUAKHEDA KLAN-GORKHA-PADARIY RAJADHAR-RATANHARI TO SILWANI SAGAR ROAD (SH-15)L ENGTH-37 KM UNDER CRIF on EPC Mode under PWD (B and R) DIV.RAISEN IN THE STATE OF M.P. Est. cost Rs.6173.55 lacs
Stage strengthening work from km 0.00 to 10.437 (Islampur-Shantipur Road) Extension of NH-37(L-10.437 km)( Starting at Ch.28.563 KM i.e. end of Dhola-Sadiya approach ) in the State of Assam under EPC mode under Dibrugarh NH Division under AP 2019-20
Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH 730H in the State of Uttar Pradesh under EPC mode.
Four Laning with paved shoulders from Km 29 00 to Km 36 25 Section of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu Road NH 703A 7 25 Kms under NH Division Jalandhar on EPC Mode in the State of Punjab for the year 2022 23
Widening to 4 lane from Km 51.600 to 76.200 Hebri to Parkala and from km 85.200 To 88.900 Karavali Junction to Malpe of Thirthahalli Udupi Malpe Section of NH169A in the State of Karnataka on EPC mode Job No NH169A KNT 2021 22 927
Widening of 2 Lane to 6 Lane from Km 56.175 to 56.800 for Permanent rectification of blackspot ID TS 02 053 including improving the Junctions at Km 56.400 and 56.550 on Khammam Aswaraopeta Section of NH 365BB in the state of Telangana on EPC Mode.
One Time Improvement of Mahabubabad Nellikuduru stretch Km 0.0 to 7.0,Km 26.1 to 30.2, Thorrur Nellikuduru stretch Km 0.0 to 3.0,Thorrur Valigonda stretch Km 0.0 to 5.6, Mahabubabad Yellandu stretch Km 0.6 to 2.4 of NH 930P in Telangana on EPC Mode
Widening from two lane to 2 lane with paved shoulders of link road between NH40 and NH440 from Km 0/000 to Km 1/532 of Rayachoty bypass in the state of Andhra Pradesh NH(O) for the year 2023 24 on EPC mode.
RFP for the work of Improvement and upgradation to 2 lane with Paved Shoulder configuration from existing Km 7.410 to Km 56.245(design chainage km 0.000 to Km 49.235)Hadia Chauraha to Karmaini Ghat section of NH328 in the State of U.P.on EPC mode.
Construction and widening of existing ROB (Railway portion and approaches) at km. 76/00 of old NH-116 (New NH-552Extn.) in Sawai Madhopur City in the State of Rajasthan on EPC mode (Job No. NH-116 (New NH-552Extn.)-RJ-2020-21-760)
Consultancy Services for Authoritys Engineer for Supervision of Construction of 4 lane ROB and its approaches at km 14.800 (Jerai), at km 36.800 (Jarua) and km 72.000 of NH 26A on Sagar to Bina road in the state of Madhya Pradesh on EPC Mode
Balance work of Construction of two lane with paved shoulder configuration of kawai bypass of NH-752 from km 41 . 560 to 50 . 650 (Design Ch 0 . 000 to 8 . 700) on EPC mode under Annual plan 2024-25 in the State of Rajasthan.
Upgradation and Strengthening of Road from Gandhigram Junction to Silli-Fatak. (Ch. 0 plus 000 to Ch. 2 plus 420) and Upgradation and Strengthening of Road from Silli Fatak to Gujarat Boader (Ch. 0 plus 000 to Ch. 4 plus 940) (EPC Mode). (3nd Call)
Providing and laying 50mm thick DBM and 30mm thick BC on Moga Ramgarh Barnala Road section of NH-71 new 703 RD 136.360 to 140.145 and 141.340 to 144.795 and Barnala Handiaya Mansa road section of NH-703 RD 140.950 to 144.450 on EPC Mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF THE PROJECT DESIGN AND CONSTRUCTION/IMPROVEMENT OF RD R-T-S ON EPC MODE FROM EXISTING KM 3.90 TO KM 56.951 (DESIGN KM 3.90 TO KM 59.42) (DESIGN LENGTH-55.52) FROM EXISTING IW/CL-9 TO NHDL SPECIFICATIONS
Consultancy Services for AE for the Construction of new 4 lane Bridge parallel to existing Vikramshila Setu from km 8.920 to km 13.375 including approach road across river Ganga on newly declared NH 131B at Bhagalpur in the State of Bihar in EPC Mode
Stage Strengthening from km 98 to km 111.710 including reconstruction of 500 m in selected stretches including rectification of one identified black spot at Sima Bandh WB-02-564 on NH-117 in the district of South 24 Parganas West Bengal on EPC mode.
4-laning of NH-17 from existing Km 475.000 to Km 500.500 (Patradevi to Karaswada Section) on EPC Mode under NHDP-III in the State of Goa.-installation of Automatic Traffic Signal System at 4 Nos. of junctions on NH-66 between Patradevi to Bambolim
SUB SOIL INVESTIGATION, DESIGN, DRAWING AND CONSTR INCL PROOF CHECKING OF 70 MTR SPAN MAJ PMT JUNG BYEPASS BRIDGE WITH STEEL SUPERSTR ON OPEN FDN INCL APPROACH RD OF 151.00 MTR AT KM 4.300 ON JUNG BYEPASS RD THROUGH EPC MODE PROJECT VARTAK IN AP
Periodic Renewal work from Km. 0.00 to Km 2.700, km 4.060 to Km 5.160 and Km 7.00 to Km 14.00 (Except Km 0.058 to Km 0.096 and Km 9.842 to Km 9.950) of NH-730H in the State of Uttar Pradesh under EPC mode.
Engagement of user fee collection agency on the basis of EQ through etender for Marri FP at Km 24.555 of NH 543 for use of Balaghat Gondia sec of NH543 from km 0.000 to km 41.200 under Bharatmala Pariyojana in Madhya Pradesh on EPC Mode
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Widening to 2 lane with Paved shoulder and strengthening from Km 269/300 to 328/200 Km Jharsuguda to Bhojpur of NH-49 on EPC mode in the state of Odisha
selection of Authoritys Engineer for project supervision of Work of widening to 4 lane rigid pavement configuration from km 90.00 to km 100.800 of NH96(km42.00 tokm 53.300 as per new NH330)design length of 11.300 km under EPC mode in the State of UP
SLOPE STABILIZATION/RESTORATION WORK (SRW) AT KM 58.800, KM 60.400, KM 70.200, KM 97.500 AND KM 142.200 ON ROAD O-K-S-R-T UNDER 91 RCC / 14 BRTF OF PROJECT VARTAK IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE OF EXECUTION
CONST. OF SHAITAN SINGH CHOURAHA TO MANISHA MARKET-BANSAL HOSPITAL-SWARAN JAYANTI PARK- BAWADIYA TIRAHA TO KOLAR RD. Ln. 6.12 KM. BPL On EPC Mode under PWD CAPITAL DIV. No-1 BHOPAL the State of M.P. Est.cost Rs.3044.90 lacs work period 540 days
Consultancy services for Authoritys Engineer for Supervision of Work of Construction of two lane with paved shoulder from existing Km. 0.000 to Km. 55.610(Design Km. 0.000 to Km. 54.048) (Mardah to Saidpur) of NH-124D on EPC mode in the state of U.P.
CONS AND UPGRAD TO NHDL SPEC INCL TUNNEL AND MINOR BRIDGE FROM KM 0PT000 TO KM 7PT900 (DESIGN CHAINAGE KM 0PT000 TO KM 7PT900) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR-AGHAM UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 7PT900 KM)
Construction of Cattle Underpass, 750.0m in Length, 5.0m in Height, and 300.0m in Length, 5.0m in Height on Road, MSH-09, Km 97/200 to Km 130/000 in Tahsil, Nagbhid/Sindewahi in Chandrapur District, in the state of Maharashtra on EPC mode (Proposed
One Time improvement of existing bypass road from Km 278 plus 650 to 281 plus 850 obedullaganj and Km 272 plus 200 To 269 plus 000 Goharganj Total Length 9.10 Km of NH-45 old NH-12 in the state of MP under EPC mode
Rebuilding of ex. 2L ROB with 3L ROB at Rly km.421-6-8 between Peddavadlapudi and krishna canal jn. stn. of Gudur Vijayawada sec ast km.431.415 LHS of Chilakaluripeta Vijaywada section of NH 16 in the state of AP on EPC Mode.
CONSTR OF RD HANLE ZURSAR IMISLA FROM KM 0.00 TO KM 48.002(ESISTING RD OF 20.800 KM AFTER KM 38.955 AND NEW RD OF 9.047 KM STARTS AFTER EXISING RD ON 20.800 KM) ESISTING TRACK TO NHSL SPECS OF EPC MODE (NET LENGTH 48.002 KMS)
Empanelment cum Consultancy services for Design Review and Approval and Construction Supervision for the Upgradation and Widening of NH 848B from Ch.8 Plus 180 to Ch.12 Plus 000 and Ch. 14 Plus 100 to Ch.20 Plus 300 in Daman on EPC Mode.
Conducting FWD Survey & Traffic Survey and Pavement Design for the work of Strengthening and Improvement of road Safety from Km.59.2 to 67.2 of Sironcha to Atmakur Section of NH.353C in the State of Telangana under Annual Plan 2021-22 on EPC mode.
Construction of ROB in LIEU of L C No 99 at Km 247 1 2 of bow string 1x62 RCC Girder 2x15M and limited height subway of 1x5x3 M between Selu Satuna Stations on Manmad Mudkhed section in the State of Maharashtra on EPC Mode
Development of six lane accessed controlled in UP portion of Delhi Saharanpur Highway from Akshardham Junction to Delhi/UP in the state of UP on EPC mode under Economic Corridor in ph-U of Bharatmala Pariyojan-Reg Shifting of water utility near ROB-I
Rehabilitation and upgradation of Patur-Balapur-Shegaon section of NH-161G from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (Total Length-49.600 km) to 4LPS configuration in the State of Maharashtra on EPC Mode
Construction of 4-6 approach road from km.217.900-km.219.910 including 6-lane ROB cum viaduct at Km 218.944 in Mahoba greenfield bypass in Sagar-Kabrai Package-V from UP-MP Border to Kabrai (km.197.000-Km.242.991) in Uttar Pradesh on EPC mode
Upgradation of Goras to Shyampur Road section of NH-552 Ext., from Design Chainage 48.400 to 111.800 Km (Total length 63.40 km) to 2 lane with paved shoulder configuration along with OTI of 8.91 km in the state of Madhya Pradesh on EPC mode
Construction of LVUP/VUP at Km. 332.900 Jhirniya at Km 357.420 Hingoni at Km 378.490 Badodia Talab at Km 395.600 Gadiya and at Km. 390.950 Narsinghgarh Junction on Lalghati 315.725 to Biaora 421.325 section of New NH46 in the state of MP on EPC mode
Improvement Construction of existing Class 5 Road to NHIL Spec with Hard Shoulder from existing Km 134pt940 to Km 169pt970 Design chainage from Km 133 to Km 166 Total Length 33 of NH 505 Sumdo-Kaza-Gramphoo Road on EPC mode in HP Package II
Construction of 6 Lane Underpasses (4 nos) and allied works on existing 4 lane Hyderabad-Bangalore section of NH 44 from Km 89 to Km 124 in the state of Telangana on EPC mode, as part of Long Term rectification of MoRTH identified black spots.
Conducting FWD Survey & Traffic Survey and Pavement Design for the work of Strengthening of Hyderabad to Bhupalapatnam Section of NH.163 from Km.215.0 to 231.0, 231.0 to 236.0 & 294.6 to 307.3 in the State of Telangana under Annual Plan 2021-22 on ... on EPC mode .
Construction of Two lane with Paved Shoulder for Fatehpur Bypass (Design Km 0.000 to Km 7.400), Mandawa Bypass (Design Km 20.925 to Km 27.300) and Jhunjhunu Bypass (Design Km 41.625 to Km 54.689) of NH-11 on EPC Mode in the state of Rajasthan
Consultancy Services for Preparation of DPR for Balance Work of Bile-Migging road from Km 0.00 to 15.00 (Bile end) and Km 0.00 to 38.00 (Migging end) to NHDL specifications on EPC Mode under Phase-A of SARDP-NE in the State of Arunachal Pradesh.
Balance work for Rehabilitation and Up-gradation of Sidhi Singrauli from km 82.400 to km 187.993 section of NH-39 (Old NH-75E) (Design Length 105.593 km) to four lane with paved shoulder in the state of Madhya Pradesh on EPC mode under NH(O)
Improvement of Riding Quality of road from km 0/00 to 28/00 of NH-248 (LHS) under NH Division Jaipur in the State of Rajasthan for the year 2021-22 (28 Km) on EPC mode (Job No. NH-248(LHS)/RJ/2021-22/764)
Rehabilitation and Uppradation of Shewali Fata to Kalambhir Section i.e km 0/443 to km 4/500 Nizampur to Chadwel section i.e.km 13/482 to 26/265 of NH-753B 2 Lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Mode.
One Time Improvement for Km. 1 to 23 and Black Spot Near Dudhiya Power House, smooth merging and diverging of junctions and repairs of old drains and RCC drain of Indore Betul Road NH-47 in the State of Madhya Pradesh on EPC Mode
Widening and Strengthening of existing two lane road of bypassed reaches of Punganur town limits from Km.0.000(design Chainage) to Km.10.035 (design chainage) on NH-42 as one time improvement in the state of Andhra Pradesh under NH(O) on EPC mode.