Loading…
Loading…
25,879 results • Best match
Prov. SOP to LWSS Jathiana Girthan by prov new 11/0.4 KV, 25 KVA S/Stn a/w HT and LT Line. T.S. No. 07/2025-26 (W.B.S. D-26-07) ON PARTIAL TURN KEY BASIS.
Shifting of 11/0.4 KV, 630 KVA S/Stn (EV Charging) from Old Bus stand Hamirpur to New Bus Stand Hamirpur in ES Local -II under ESD HPSEBL, No. II Hamirpur (ON PARTIAL TURN KEY BASIS).
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from (Nagabang Gamsuk) to km (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-3)
Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh On EPC mode
SH- C/o 40.00 mtrs span double bridge with footpath both side approaches at RD. 0/350under CRF Job No. CRF-H_-2021-22/79 on EPC Mode
Appointment of Design Consultant for Providing Comprehensive Design Services for Construction of Various Infrastructure Works Under Phase III at IIT Bhubaneswar to be Undertaken Through EPC Mode III
Consultancy Services for Authoritys Engineer for construction of major bridges over river Subansiri at Ghunasuti with approaches and Pagladiya with road connecting Kumarikata and Nayabasti on EPC mode
Construction of Phase I Sustainable Undergraduate campus for IIMB New Campus at Survey no.47, Mahanthalingapura Village, Jigani hobli, Anekal taluk, Bengaluru urban district on EPC Mode II
RFP for Selection of Contractor for Design Supply and Establishment of a common STP cum ETP on EPC Mode at BIO 360 Life Sciences Park Thonnakkal Thiruvananthapuram, Kerala
Selection of Contractor for Design, Manufacturing, Supply, Installation and Maintenance of Automated Multilevel Mechanised Parking System at A Block, behind Saphalyam complex, Palayam on EPC Mode ,300 Cars
Widening/Improvement to 4 (Four) Lane with Paved Shoulder) of Kwaram Taro Village - Dillai Section (Package-6) of NH 29 in the state of Assam on EPC mode
Construction of High Altitude Hill Road from Dembuen TO Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal Pradesh on EPC Mode
Development of Integrated Check Post at Sabroom Tripura external development works for road works parking zone footpath and retaining wall Tripura on EPC Mode Design and Build Basis
(Continue..) FOR DEVELOPMENT OF 600MW (2X300MW BLKS) ISTS CONNECTED SOLAR PV PROJECTS AT NTPC REL KHAVDA RE PARK-SOUTH BLK IN RANN OF KUTCH, GUJARAT IN EPC MODE.
Design and Construction of balance service road along Indore Dewas section of NH52 (Length 7.71 km) under road safety improvement in the state of MP on EPC Mode
Balance work for Widening / Improvement to 4 (Four) Lane with Paved Shoulder (Package-I) of Srirampur - Dhubri Section of NH-127Bon EPC Mode in the State of Assam
Improvement and Widening to two lane with paved shoulder of Manu - Simlung section of NH-44A (Length-18.28km) in the state of Tripura on EPC mode - Package-IV
Consultancy Services as AE for Supervision of) Construction of Four Lane Panchgram Bypass and Construction of Four Lane Badarpur Bypass in the State of Assam on EPC Mode
PERIODICAL RENEWAL TO INDAPUR AKLUJ MALINAGAR SHRIPUR MALKHAMBI BONDALE VELAPUR SANGOLA IN KM.10/500 TO 25/00 N.H. 965G IN THE STATE OF MAHARASHTRA under EPC mode
Providing services in the Office of AE(E)-VII, HCU Campus, Gachibowli, Hyderabad. Subwork/Packages: Construction of Lecture Hall Complex G plus 1 Floors on EPC mode Basis
Consultancy services for AE for Supervision of 4-Laning of NH-37 from Nagaon By-pass to Jia Bharali on EPC mode on NH-37 A(4th call)
Turnkey Contract For Fabrication Of Seed Bank ( 1 Unit ), Turnkey Contract For Fabrication Of Conference Hall ( 1 Unit )
Work for 150 fit boring, installation of 01 No submersible 1 HP, installation of 1000 leter capacity water tank with plumbring work to ensure water supply on turn-key basis at S/S Bajrang Nagar, Kasalee and Chhatideeh (Chauree) in the area of SDO-I K
Prov. SOP to HP Shiva Project in Doli by prov new 11/0.4 KV, 25 KVA S/Stn a/w HT and LT Line. T.S. No. 142/2025-26 (W.B.S. D-25-1929) (ON PARTIAL TURN KEY BASIS).
Construction of Steel structure non-residential buildings using pre-engineered construction technology including development of area and all services complete in all respect including maintenance for five years on EPC basis at KG Marg (near Asia House) and Africa Avenue (near Sarojini Nagar depot), New Delhi. Subwork/Packages: (Phase - II) : Additional alteration in Block A Africa Avenue, C/o toilet in KG Marg & Africa Avenue, shed for visitor at Block B KG Marg and other miscellaneous works at defence Office Complex, KG Marg, New Delhi.
Construction Of 2 Nos Of 11kv Link Line From 110/11kv Guledagudda &33/11kv Kandgal Substations For A Distance Of 10.5 Km In Badami Sub Division Of Bagalkot Division On Total Turn Key And Lumpsum Basis (reserved For Sc)
Construction Of 6 Nos Of 11kv Link Lines From New 10/11kv Bommanal Sub Station For A Distance Of 11 Kms In Raibag Sub Division Of Raibag Division On Total Turn Key And Lumpsum Basis. (reserved For Sc Category)
Construction of 4 nos of 11kV link lines for a distance of 19.21 Rkms from 110/11KV Ghatanatti & 110/11kV Satti sub stations in Athani sub division of Athani Division on Total turn key basis. (Reserved for SC category)
Creation Of 12 Nos Of 11kv Link Lines From Variou Substations To Bifurcate The Over Loaded Feeders For A Distance Of 39.3 Kms In Shiggoan And Savanur Sub Division Of Haveri Division On Total Turn Key And Lumpsum Basis.
Construction Of 05 Nos Of 11kv Link Lines From 33/11kv Honkan And 33/11 Kv Siddar Sub Stations For A Distance Of 14.3 Km In Karwar Sub Division Of Karwar Division On Total Turn Key And Lumpsum Basis.
Installation of Sisubari-II Mini Solar RLI scheme by Supply and Installation of Solar PV system with dual axis Manual Tracking system, centrifugal pump sets, Distribution Chamber and construction of spout chamber on Turn Key basis in Alipurduar dist.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At TEKELANJUN SC in Karbi Anglong District.
work for replacement of 33KV and 11 KV VCBs installed at various 33/11 kv Sub-stations against Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh
Construction of HYDT with Lowering and installation of submersible motor pump in Pump House and water supply arrangement at Sub Divisional Jail Barhi under D W and S Division Hazaribag on Turn Key Basis for the year 2020-21
Survey, Planning, Designing, Drawing and Construction of 0.35 MLD STP based on SBR Technology and Sewage Network from the Colony to STP including Operation and Maintenance for 04 years at Kothari Colony of Chirimiri Area on TURN-KEY basis.
Supply, Erection, Testing, Commissioning for Creation of 2 Nos. 100 KVA Sub-Stations alongwith HT/LT Lines for Tubewells at different locations (under AMRUT 2.0) under the Jurisdiction of Electric Division Div.-I (JPDCL) Jammu on Turn Key Basis
For the work of 33 KV and 11 kV line strengthening and 11 KV new line construction work on semi turn-key basis in the Business Plan 2024-25 (Part-2) scheme under the area of EDD-2 Agra.
Construction of Mini Water Supply Scheme through DT/HYDT driven with Solar submersible Pump set at Different Block and Different Panchayat under DWSD No-1, Giridih for the Year 2021-22 on Turn Key basis Group No C-24
Construction of Mini Water Supply Scheme through DT/HYDT driven with Solar submersible Pump set at Different Block and Different Panchayat under DWSD No-1, Giridih for the Year 2021-22 on Turn Key basis Group No C-11
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At SILIMKHUWA SC in Karbi Anglong District.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At Ganeshpather SC in Karbi Anglong District.
Construction of High Level Bridges on Halon river near Gadi on Gadi Motinala road and Kashmiri Nala near Gadi on Sijhora Gadi road on Turn Key basis including construction of approach roads. This includes work of urvey,necessary investigation,
Under Additional Business Plan 2023-24 (Rs. 10 crores) in EDD-Ird, Chandauli, the work of cutting the load of 11 KV Industrial-1 feeder of Jeevnathpur power sub-station and 11 KV Shivam feeder (Semi Turn-Key Basis)
Construction of Mini Water Supply Scheme through DT/HYDT driven with Solar submersible Pump set at Different Block and Different Panchayat under DWSD No-1, Giridih for the Year 2021-22 on Turn Key basis Group No C-29
Running Repairing Operation and Maintenance (Civil and Mech) excluding Raw Water and Energy Charges for Reorganization Urban WSS Jhumritelaiya under D. W. S. Div JMT for the year 2023-24 on Turn Key Basis (Gr JMT/Urban) (3rd Call)
Supply,Installation and Testing of Dual Solarized Pumps with all accessories i.e. Solar PV modules, pump motor set, Solar panels, mounting structure, controller etc. and providing and fitting of GI quick coupling Pipes on turn key basis under procure
The work for Reconductoring of 33 KV Line of S/S Pannalal Park from Dog to Panther in the area of UEDD-Varunapar, Varanasi Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
Tender for Selection of agency/expert for MIS of different component of Swachh Survekshan 2024 (ODF plus-plus, GFC and SS2024) for RMC as per Guide line (attached Survey Tool kit) under Swachh Bharat Mission on turn key basis.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2021-22 31 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At RONGMONGVE SC in Karbi Anglong District.
The work for electrification of New Mini Tubwell connection of 10 HP with 11 KV S/C cable at Kazi Sadullahapur, Varanasi in the area of UEDD-VIII, Varanasi Under deposit work 2020-21 on Semi Turn-Key Basis