Loading…
Loading…
25,015 results • Best match
Construction of bridge across Simuli nallah (missing link) at km 107.470 of NH-220 in the State of Odisha on EPC mode.
Strengthening of NH-709 (Extn.) from Km. 80.848 to Km. 87.00 in Rohtak Distt. on EPC Mode in the state of Haryana
CONSTRUCTION OF 172.50 MTR (SPAN 05) AT NAGREE GAMANDER BRIDGE (Balance portion) in the UT of Jammu and Kashmir on EPC mode.
Installation of Crash Barrier on various stretches of National Highways in the state of Arunachal Pradesh under Road safety on EPC mode.
Construction of Bypass at Kuknoor Yelburga Gajendragada of Bhanapur Gaddanakeri Section of NH 367 in the State of Karnataka on EPC mode
Construction of Yadgiri Bypass from Km 70.9 to 79.65 Design Chainages of NH 150 in the State of Karnataka on EPC mode
One time improvement of Gauribidanuru town Bypassed stretch of NH 69 Old NH 234 in the state of Karnataka on EPC Mode
CONSTRUCTION OF THAL SENA BHAWAN AT DELHI CANTT ON EPC MODE UNDER GE (P) B/R THAL SENA BHAWAN DELHI CANTT-10
Construction of 2 Nos of VUP in Trichy Karur section of NH 67 in the State of Tamil Nadu on EPC mode
Construction of High Level Bridge across Anas River on A/R Mahudi Dhuliyagarh VR1228 on EPC Mode. Complete work as per RFP
RECTIFICATION OF 03 NO. OF BLACKSPOTS ON JAIPUR-REENGUS-SIKAR SECTION OF NH-52 IN THE STATE OF RAJASTHAN on EPC Mode
Construction of toll plaza at km 175.900 on Ramdas-Gurdaspur section of NH-354 in the State of Punjab on EPC mode.
Improvement and Rehabilitation of Lucknow-Ayodhya Section of NH28(New NH27) from Existing km68.900 to km121.600 in Uttar Pradesh on EPC Mode.
Four Laning of Banihal Bypass from Km 187.000 to Km 189.350 section of NH-1A in Jammu and Kashmir on EPC Mode.
EOI - SELECTION OF CENTRAL/STATE GOVERNMENT ORGANIZATION / PSU FOR CONSTRUCTION PROJECTS, MANAGEMENT, SUPERVISION AND EXECUTION OF PHASE-1B PROJECTS (THROUGH EPC MODE)
Design Engineering and Procurement of Construction of Vitta Bhawan at Sector 7 Gomti Nagar Vistar at Lucknow Uttar Pradesh on EPC mode
Strengthening Work from Km 16.000 to 19.860 and 38.060 to 40.000 of NH 219 on EPC mode in the state of Bihar
Construction Of Access Controlled Multi Modal Corridor from Navghar to Balavali in the State Of Maharashtra on EPC Mode For Package MMC10
Design Engineering Procurement for Construction of Mahatama Buddh Technical and Agricultural University Phase 1 at District Kushinagar UP India on EPC MODE
New Construction of Major Bridge at Nagavali River on NH-326 at Ch-192.830 in the state of Odisha on EPC mode
Construction of C.C. Village Roads in Gram Panchayat - Khanvel, Surangi, Amboli, Kherdi, Kilvani, Kharadpada and Kauncha at Silvassa (EPC Mode) (4th call)
Construction of C.C. Village Roads in Gram Panchayat - Khanvel, Surangi, Amboli, Kherdi, Kilvani, Kharadpada and Kauncha at Silvassa (EPC Mode) (2nd call)
Construction of animal underpass on Gadchiroli to Mul road, NH -930 ch. 210/800 in the State of Maharashtra on EPC Mode
Strengthening work in Km 38.84 to 59.00 of NH-333 on EPC Mode in State of Bihar for the year 2019-20
Periodical Renewals from km 68.0 to 73.6 of Khammam Aswaraopeta Section of NH 365BB in the State of Telangana under EPC mode.
PMC work for Construction of Green Eco Friendly Office at Headquarters of Forest Department at District Lucknow UP India on EPC Mode
Construction of Anti Erosion Bunds across 11 villages in Tal Dahanu Vasai and Palghar of Palghar Dist in Maharashtra on EPC Mode
Construction of Bypass to Naragund Town on NH52 Old NH-218 Bijapur Hubballi Section in the state of Karnataka on EPC mode
Landslide treatment work of 08 location on NH-07 under EPC mode in the State of Uttarakhand under Annual Plan 2024-25
Construction Of High Level Pedestrian Suspension Bridge Across Narmada River Near Jhula Bridge (Mamleshwar Setu) at Omkareshwer District Khandwa in EPC Mode.
Request for Proposal for Appointment of Financial Consultant for Various projects to be undertaken with financial assistance of MDBs under EPC Mode
Construction of Start-up and innovation Centre at Gauhati University on Engineering and Procurement and Construction EPC Mode-lll Basis under SOPD
Widening 2-lane to 4-lane from km. 155.100 to 160.700 (ISBT to Ajabpur Railway Crossing on NH-72 on EPC mode
Construction of Working Women Hostel on EPC mode and thereafter DLP of 36 months, Sector-1 at IMT Manesar under CSR Scheme.
Construction of three-storey building for Department of Sowa-Rigpa Medicine and Surgery, Leh UT of Ladkh (EPC Mode-1) (Package-1)
Development of New Civil Enclave at Bihta SH Construction of New Integrated Terminal Building, Utility Building, Elevated Road etc. on EPC mode
Construction of C.C .Village Roads in Gram Panchayat Khanvel, Surangi, Amboli, Kherdi, Kilvani, Kharadpada and Kauncha at Silvassa (EPC Mode) (3rd call)
Construction of Lumding Town Phase 1 and Phase 2 water supply project including operation and maintenance for 5 years on EPC mode
Design Engineering Procurement and Construction of four nos of RCC Overhead Storage Tanks and providing and laying of potable water distribution pipeline feeder main _ with Defect Liability Period of entire scheme for 3 year in Satna
Design and Construction of Light Vehicular Underpass at Km. 80.800 Design Ch. 81.026 Karara Ganj Junction on Jhansi to Khajuraho section of NH 39 in the State of Madhya Pradesh on Engineering Procurement and Construction Mode
DEVELOPMENT OF SATNA AIRPORT FOR 19 SEATER AIRCRAFT. SH Detailed Designing, Engineering, Procurement and Construction of New Passenger Terminal Building cum ATC Tower, ESS Building, Fire Station, Fire Pit, Boundary Wall and Cooling Pit and Associat
Sewerage network and pumping stations in newly developed areas of Bhubaneswar City (left out area at Durgamadhabnagar(P), Shampur, Sijuput, Kalingavihar K-4 Backside, K-6 B, Tomando etc (Package-X) on (EPC)
Sewerage network and pumping stations in newly developed areas of Bhubaneswar City (left out area at Pokhariput, Bhaktamadhunagar, Pokhariput DAV backside area, Baramunda village, Jagamara Road, Krishna Garden etc (Package-VI) on (EPC)
CONSTRUCTION OF ROAD FROM WANGTI TO BP 150, FROM KM 0.000 TO KM 5.700 (NET LENGTH 5.700 KM) TO NHSL SPECIFICATIONS UNDER 100 RCC/15 BRTF IN NAGALAND STATE UNDER EPC MODE
Design and Construction of 4 lane ROB at N.C.R. Mathura-Alwar Rail Section K.M. 1423/4-5 of L-xing no. 22-C on Kosi-Nandgaon-Barsana-Goverdhan Sonkh Mathura Road in Distt. Mathura (U.P.) on EPC MODE
Sewerage network and pumping stations in newly developed areas of Bhubaneswar City (left out area at Nayapalli, Police Colony, Madhusudan Nagar, Nilakanthanagar, Sastri Nagar and Zone 7 and 9 etc (Package-I) on (EPC)
Sewerage network and pumping stations in newly developed areas of Bhubaneswar City (left out area at Mahaveer Nagar, Kapileswar area, Sunderapada, Lingaraj Temple area, Kunjapatnasahi, Mahatab Road, Dumduma, Bhadalpur etc (Package-V) on (EPC)
EPC NSK-II (27B) - Improvement to Khiroda Chinawal Balwadi Bodwad Jamthi Fattepur Tondapur Wakod road SH46 Km.50/00 to 109/550 (Sect.Bodwad to Wakod) Tal.Jamner Dist.Jalgaon on EPC mode
EPC NSK- II (29C) - Improvement to Wawade Javkhede Ranaiche Bahadarpur Parola Kasoda Talai Utran road MDR-46 Km.14/00 to 75/400 Tal.Erandol and Parola Dist.Jalgaon on EPC mode
EPC NSK-II (31C) - Improvement and Widening of Rahata Lohare Nimgaon Jali aashvi Mandava Road (SH 61) Km. 0/00 to 38/00 Tal. Rahata Dist. Ahmednagar on EPC mode