Loading…
Loading…
419 results • Best match
Strengthening / Overlaying of Four laning of Madurai - Paramakudi Section from Km 5.000 to Km 81.064 of NH- 85 and 87 (Old NH-49) in the State of Tamil Nadu on EPC mode
Four Laning of left-over works including Additional Structures in Kerala-Tamil Nadu Border Kanyakumari from Km.43.000 to Km.96.714 of NH-47 in the State of Tamil Nadu on EPC Mode
Widening the left out existing 2L to 2L PS and Strengthening the selected stretches from Km 9/6 to Km 15/6 of NH 381A (Vellakovil - Sankari road) on EPC mode in Tamil Nadu
REQUEST FOR PROPOSAL for the "Construction of 3rd and 4th New Railway BG line between Attipatu and Gummudipundi for Civil Engineering, Signalling & Telecommunication, Electrical General & OHE Electrification works including utility shifting" on EPC MODE...
Permanent Rectification of Black Spots TN-(02)-522, TN-(05)-062, TN-(05)-065 in Puducherry to Tindivanam section of NH-32 (Old NH-66) in the State of Tamil Nadu on EPC Mode
Establishment of new 33/11kv ss at Sengaduin Tiruvannamalai EDC(civil works) under turn key
Strengthening from Km 0/000 to Km 12/300 (length 12.300 km) of NH-38 (Old NH 234) Mangalore-Villupuram Road on EPC mode in the state of Tamil Nadu under Annual Plan 2024-25
Authority Engineer Services for Balance Works for Four laning of Vikravandi to Sethiyathope section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC mode (2nd Call)
Constructing a Vehicular Underpass (VUP) (12m x 5.5m) at Km.64 750 (Samiyarkinaru) in the project of Salem Ulundurpet section of NH-79 (old No.NH-68) in the State of Tamil Nadu on EPC mode
Establishment of new 33/11kv ss at Nagadasampatty in Dharmapuri EDC(civil works) under turn key
Establishment of new 33/11kv ss at Noolahally in Dharmapuri EDC (Civil works) under turn key
Establishment of new 33/11kv ss at Thellanandal at Tiruvannamalai EDC(civil works) under turn key
Establishment of new 33/11kv ss at Kilvelliyur in Tiruvannamalai EDC(civil works) under turn key
Establishment of new 33/11kv ss at Kattampatty in Dharmapuri EDC(civil works) under turn key
Establishment of new 33/11kv ss at Kelur in Tiruvannamalai EDC (civil works) under turn key
Establishment of new 33/11kv ss at Kozhipuliyur (civil works)in Tiruvannamalai EDC under turn key
Establishment of new 33/11kv ss at Pallavaram in Tiruvannamalai EDC (civil works) under turn key
Establishment of new 33/11kv ss at Kadamadai in Dharmapuri EDC(civil works) under turn key
Establishment of new 33/11kv ss at Periyakolapady in Tiruvannamalai EDC(civil works) under turn key
Establishment of new 33/11kv ss at Kovoor in Tiruvannamalai EDC (civil works) under turn key
Permanent Mitigation of Black Spot TN-03-243, 244, 241 by Constructing VUP at Km115.760 (Agaram Junction), Km118.635 (Kerakodahalli Junction) and Km 132.140 (Gundalpatty Junction) and Construction of FOB at Km119.960 and Km127.335 on EPC Mode
Permanent Rectification of Black Spots TN-(05)-077, TN-(05)-078, TN-(05)-076, TN-(05)-075 in Salem to Ulundurpet section of NH-79 in the State of Tamil Nadu on EPC mode - 2nd Call
Permanent Rectification of 7 Nos. Blackspots in Madurai - Tuticorin Section of NH-38 and Permanent Rectification of 4 Nos. Blackspots in Tuticorin - Tirunelveli Section of NH-138 in the State of Tamil Nadu on EPC Mode
Permanent Rectification of Black Spot TN(02)039 by Constructing a LVUP (12m X 4m) at km.130.200 (Poottuthakku) in the project of Krishnagiri -Walajahpet section of NH-48 (Old No NH-46) on EPC mode
Ancillary Civil works in New Staff Quarters in connection with Non Compliance of Agreement Conditions of EPC Contract in the newly constructed Staff Quarters at Coimbatore International Airport.
Appointment of EPC Contractor for Airslide Conveyor System balance work Completion on turn-key basis at Ariyalur Cement works Ariyalur District
Permanent Rectification of Black Spots TN-(05)-066, TN-(02)-456, TN-(05)-063, TN-(05)-059 in Puducherry to Tindivanam section of NH-32 (Old NH-66) in the State of Tamil Nadu on EPC Mode
Permanent Rectification of Black Spot TN(02)089 by Constructing a LVUP (12m X 4m) at km.55.815 (Girisamuthiram Jn) in the project of Krishnagiri -Walajahpet section of NH-48 (Old No NH-46) on EPC mode
Balance Works for 6 Laning of Sriperumbudur to Karapettai Sec of NH4 (New NH-48) from Km 37.000 (Exist Km 37.000) to Km 71.015 (Exist. Km 71.000)in Tamil Nadu on EPC Mode under NHDP Phase V
Strengthening from Km 78/200 to Km 106/200 on NH-136 Thanjavur-Perambalur-Atthur road on EPC basis Contract under Annual Plan 2024-25 in the state of TamilNadu
4-Laning of existing 2-laning stretch from Dharmapuri at km.117.000 to Lonand at km.166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode
Permanent Rectification of Blackspot (TN-02-481) by Construction of 4-lane VUP at Km 105.335 (Budhalur Junction) in Thanjavur to Trichy section of NH-67(New NH-83) in the State of Tamil Nadu on EPC mode
Permanent Rectification of Black Spots TN-(05)-050, TN-(05)-191, TN-(02)-091 in Tindivanam to Ulundurpet Section of NH 32, 132, 38 (Old NH-45) in the State of Tamil Nadu on EPC Mode - 2nd Call
AE For Supervision of 4-Lane divided carriageway from Vadipatti (Design Ch. 0.000) to Chittampatti (Design Ch. 29.960) Stretch of Madurai Ring Road Section of NH-744A on EPC mode under Bharatmala Pariyojana Phase-I in Tamil Nadu
Construction of Foot Over Bridges with Lift facility at 07 Nos of locations between Km 30.100 to Km 47.840 on Tambaram to Chengalpattu section of NH-32 (Old No. NH45) in state of Tamil Nadu on EPC Mode
Construction of 4 lane elevated corridor in Grand Southern Trunk Road from Km 6/0 9/2 Teynampet to Saidapet through EPC Mode of contract
Construction of Additional infrastructure at National Institute of Technology Trichy Tamil Nadu SH 1 Construction of Laboratory Annex building for Civil Engineering Department G plus 2 including separate structural laboratory building of height 14m ... on Engineering procurement and construction EPC contract basis ...
Permanent Rectification of Black Spots TN-(05)-848, TN-(05)-849, TN-(06)-110, TN-(06)-089, TN-(06)-091 in Salem to Ulundurpet Section of NH-79 in the State of Tamil Nadu on EPC Mode - 2nd Call
CS for AE for Construction of New Double Tier 4lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km 0.342 to Km 20.223 on EPC mode under BMP in the State of Tamil Nadu(2nd Call)
Improvement to the existing carriage way at Km 33/610 -44/010 of Pudukkottai -Trichy road (NH-336) on (EPC) Basis Contract under Annual Plan 2024-25 in the state of Tamilnadu
Repair and Rehabilitation of High Level Bridge at Km21/200 of NH-32 (Thoothukudi - Tiruchendur- Kanyakumari road) on (EPC) Basis Contract under Annual Plan 2025-26 in the state of Tamil Nadu
Permanent Rectification of Black Spot TN-(02)-269, 595 and 539 by construction of VUP at Km.260.820 (Keerambur Junction), at Km.268.516 (Oviyampalayam Junction) and Service Road from Km.272.200 to Km.274.200 (Association Petrol Bunk) on EPC Mode
Construction of 03 Nos. of Foot Over Bridge at Km 141.150 Sengodagoundenpudur, Km 142.800 Mudilipalayam Pirivu and Km.143.950 Neelambur in the project stretch of Chengapalli Walayar section of NH-544 in the State of Tamil Nadu on EPC Mode
Permanent Rectification of Black Spot TN-(02)-269, 595 and 539 by construction of VUP at Km.260.820 (Keerambur Junction), at Km.268.516 (Oviyampalayam Junction) and Service Road from Km.272.200 to Km.274.200 (Association Petrol Bunk) on EPC Mode
CS for AE services for 4laning of(i)Thirumangalam Vadugapatti section from Km. 0.000 to Km 36.000 of NH744(PckgI) and (ii)Vadugapatti Therkuvenganallur section from Km36.000 to KM71.600 of NH744(PckgII) in Tamil Nadu on EPC Mode under BMP
Rectification of Blackspots TN-03-069 (Thadakoil), Accident Spot (Kakkathoppu) and Blackspot TN-02-604 (Agaram Junction) by Construction of VUPs and Service Road in Karur to Dindigul Section of NH-44 in the State of Tamil Nadu on EPC Mode
Permanent Rectification of Black Spot TN(02)69 and TN(02)514 by Constructing a Vehicular Underpass (VUP) (12mx5.5m) at Km 03 791 (Neikarapatti Junction) in the project of Salem - Kumarapalayam section in the State of Tamil Nadu on EPC Mode
Consultancy services for AE for Supervision of Four Laning of Natham-Tuvarankurichi section of NH-785E from Design Chainage 36.690 to 61.115 (Length-24.425 Km) under BP Phase-I (Feeder Route category) on EPC mode in the State of Tamil Nadu
Permanent Rectification of Black Spots TN-(05)-037, TN-(02)-175, TN-(05)-040, TN-(02)-169 in Tindivanam to Ulundurpet Section of NH 32, 132, 38 (Old NH-45) in the State of Tamil Nadu on EPC Mode - 2nd Call
AE Services for Balance Works for 6Laning of Sriperumbudur to Karapettai Sec of NH-4(New NH-48) from Km 37.000 (Exis Km 37.000) to Km 71.015 (Exis Km 71.000) in Tamil Nadu on EPC Mode under NHDP Phase-V