Loading…
Loading…
419 results • Best match
Development of Multi Cargo Berth No.10 at V.O.Chidambaranar Port on Engineering, Procurement And Construction Contract (EPC) Basis
Construction of Marine Bridge connecting Vivekananda Rock Memorial Island and Ayyan Thiruvalluvar Statue Island and associated works at Kanniyakumari on Engineering, Procurement and Construction EPC mode of contract
Construction of At Grade road connecting Chennai Port Maduravoyal elevated corridor (CPM) and other Internal roads and improvement of the intersections (Phase-I) on Engineering, procurement and Construction (EPC) basis.
ENGINEERING PROCUREMENT AND CONSTRUCTION EPC OF DEFICIENT MARRIED ACCOMODATION AT CGRA TUTICORIN UNDER GE I CG CHENNAI
Appointment of Contractor for Design, Engineering, Procurement and Construction of Global Sports City in EPC 1 Mode
Strengthening from km 0/000 to 1/500 and km 30/830 - 32/230 of NH 383 (Kottampatti - Thiruppathur Section) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu
Construction of Additional 2-lane High Level Bridge across the river Kamandala at Km 92/8 of NH-234 (New NH-38) (Mangalore-Villupuram Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu
Construction of Bypass to Madurai - Achambathu - Viratipathu in between km 6/850 to 10/382 of NH 49 Extn. (New NH 85) including Land Acquisition on Engineering, Procurement and Construction (EPC) Basis contract in the state of Tamil Nadu.
Widening Minor Bridge at km 477/6, Reconstruction of Minor bridge at km 480/2 including Reconstruction of Slab culvert at km 474/4 of NH 67 on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu
Elimination of identified Black Spot TN-(02)-076 by permanent remedial measures at km 306/4 (Panapalayam Junction) of NH 67 (New NH 81) (Coimbatore to Chidambaram Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of
Construction of an additional two lane bridge with approaches at km 249/6 of NH-948 (old NH-209) (Bangalore-Coimbatore section) on Engineering, Procurement and Construction (EPC) basis contract under Annual Plan 2022-23 in the state of Tamil Nadu
Construction of bypass to Bagalur town branching from Km.3/0 (Kothapalli) and joining at km 9/350 (Jee Mangalam) including Shifting of Utilities of NH 207 (New NH 648) on Engineering, Procurement and Construction (EPC) Basis Contract in the state TN
DESIGN, ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) INCLUDING OPERATION AND MAINTENANCE OF TERTIARY LEVEL CBRN MEDICAL MANAGEMENT CENTRE WITH BONE MARROW TRANSPLANT CENTRE AT CHENGALPATTU MEDICAL COLLEGE, CHENGALPATTU, TAMIL NADU
TENDER FOR CONSTRUCTION OF SEAFARERS CLUB INSIDE KAMARAJAR PORT THROUGH ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) MODE
Design, Engineering, Procurement, and Construction (EPC) of various Lubes, Greases, and specialty oil manufacturing facilities, process plant and Control System including comprehensive AMC for 5 years for setting up Lube Complex
REDEVELOPMENT OF KATPADI JUNCTION RAILWAY STATION (BALANCE WORK) ON EPC MODE
REDEVELOPMENT OF KATPADI JUNCTION RAILWAY STATION (BALANCE WORK) ON EPC MODE
PROVISION OF MARRIED ACCN AT AFAC COIMBATORE ON EPC MODE
CONSTRUCTION OF DEFICIENT MARRIED ACCN AT AFAC THANJAVUR ON EPC MODE
Strengthening from Km 22/0 to 78/0 of NH-38 (Length54.223km) (Mangalore-Villupuram Road) on EPC mode in Tamil Nadu on EPC Basis Contract under Annual Plan 2024-2025 in Tamil Nadu (Job No. NH-38-TN-2024-25-1039
Construction of flyover along South Usman Road and CIT Nagar 1st Main Road in Div136 and 141, ZoneX by Design, Engineering, Procurement and Construction method
Construction of ROB in lieu of existing LC No.2B at Manali road in Dn. 41, Zone IV by Design, Engineering, Procurement and Construction DEPC method.
CS for AE for Supervision of 6laning of Tuticorin Port Road sec of NH7A (New NH138) from Km 0.000 to Km 6.140 Effective Length 5.16 km on EPC Mode in Tamil Nadu on EPC mode
Construction of ROB in lieu of existing LC No 2A at Ennore High Road in Dn 38 Zone IV by Design Engineering Procurement and Construction DEPC method
Construction of Limited use Subway in lieu of LC No.11A at Bojaraja Nagar in Dn53 ZoneV (GCC portion only) by Design, Engineering, Procurement and Construction (DEPC) method
Construction of flyover over the existing subway at Ganesapuram near Vyasarpadi Jeeva Railway Station in Div45 and 70, ZoneIV and VI on Design, Engineering, Procurement and Construction method
Development of Rail Connectivity to Multimodal Logistics Park (MMLP) Chennai on EPC mode from Kadambattur Railway Station.
Construction of Grade Separator at Km 144.2 of NH 234 (at Junction with Tindivanam to Krishnagiri Road New NH 77) on Engineering, Procurement and Construction (EPC) Mode.
Appointment of contractor for construction of 2 Nos of closed Coal Storage Shed at Ariyalur Cement Works, Ariyalur under EPC contract basis
Design, Engineering, Procurement and Construction including Hydraulic Testing, Satisfactory trials and commissioning of 0.75 MLD Capacity Sewage Treatment Plant (STP) based on Sequential Batch Reactor (SBR)/MBR or any equivalent Technology followed b
Design, Engineering, Procurement, and Construction of Civil, Electrical, CCTV and Access Control, Fire fighting, HVAC and LAB Equipment works including comprehensive AMC for 5 years for setting up LC at Villages Amullavoyal and Vaikkadu, Chennai
Construction of Departure Terminal Building along with Covered Driveways and Walkways of Katpadi Junction Railway Station, Vellore, Tamil Nadu on EPC Mode
Construction of 2 Nos of VUP in Trichy Karur section of NH 67 in the State of Tamil Nadu on EPC mode
Widening from Two Lane to Four Lane and Improvements of the stretch from Km 370/5 - 373/400 and 374/2 - 375/0 of Old NH 67 (Km 37/500 - 40/400 and 41/2 - 42/0 of New NH 181) in the State of Tamil Nadu on Engineering, Procurement and Construction (EPC
Design supply erection testing commissioning and 3 years maintenance of 50KWp on grid solar ground mounted power project nearby switchyard South West side fencing at MTPS1 under turnkey basis EPC contract
Providing Architectural and Engineering Consultancy services for the project of Major Upgradation Redevelopment of Katpadi Railway Station Katpadi Tamil Nadu on EPC Mode
Construction of Bypass to Gangaikonda Cholapuram in Kallagam to Meensurutti section of NH-81 (Old NH-227) in Tamil Nadu on EPC Mode
Strengthening the selected stretches from Km 58/700 to Km 68/900 of NH-381A (Vellakovil - Sankari road) on EPC mode in Tamil Nadu
Construction of Design and Development Centre (D2C) Building at AVNL complex, Avadi, Chennai (T.N) on EPC Basis (Package-IA)
Construction of Additional Structures in Kerala/Tamil Nadu Border Kanyakumari section (From Km 43.300 to Km. 96.714) of NH47 in Tamil Nadu on EPC Mode
Reconstruction of Additional Two Lane Bridge across Bhavani river at Km 229/2-4 of NH 209 (in Sathyamangalam town) in the state of Tamilnadu on EPC mode
Construction of Light Vehicular Under Pass (LVUP) including approaches at Km 109/10 of NH-4 (New NH 40) (Chennai-Chittoor-Bangalore Road) on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu
Construction of Vehicular Underpass (VUP) at Km.288.450 (Manmangalam Village) in the project of Namakkal Karur Section of NH-44 in the State of Tamil Nadu on EPC mode
Four Laning of Thirumangalam-Vadugapatti Section of NH-744 (Old NH-208) (Package-I) from Km 0.000 to Km 36.000 in the State of Tamil Nadu on EPC mode
Four Laning of Vadugapatti-Therkuvenganallur Section of NH-744 (Old NH-208) (Package-2) from Km.36.000 to Km.71.600 in the State of Tamil Nadu on EPC mode
Development of Bunkering and Refueling facility for Green Methanol 750 meter cube on Pilot basis including five years Operation and Maintenance contract through EPC mode at VOC Port Authority
Balance Works for Four Laning of Vikravandi to Sethiyathope Section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC Mode
SHORE UNLOADER PACKAGE ON EPC BASIS AND OPERATION and MAITNENANCE OF COMPLETE SHORE UNLOADERS FOR 1 YEAR FOR 2x660 MW ENNORE SEZ PROJECT
Rectification of Blackspot TN-03-303 by Construction of 6 lane VUP at Km 203.995 in Madurai - Kanniyakumari section of NH-44 in the State of Tamil Nadu on EPC Mode
Six laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km 0.000 to Km 6.140 (effective length 5.2 km) on EPC Mode in the state of Tamil Nadu