Loading…
Loading…
418 results • Best match
Permanent Rectification of 04 Nos. of Blackspots (TN-(02)-117, TN-(02)-064 /143, TN-(02)-567 and TN-(02)-025) in Madurai to Tuticorin section of NH-38 (Old NH-45B) in the State of Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-02-217 by constructing a VUP at Km 19 250 (Mettupatti village) in the project of Salem -Ulundurpet section of NH-79 (Old No. NH-68) in the State of Tamil Nadu on EPC Mode
Construction of Type VI Quarters, 06 Nos of 1 Block and Type V Quarters 12 Nos of 2 Blocks (06 Quarters Each) in AVNL-HVF Estate, Avadi, Chennai (T.N) on EPC Basis (Pkg-IB)
EPC contract as per NIT
Design, Engineering, SITC of 6.0 MW Wind Farm on EPC Mode at VOCPA, Tuticorin along with Civil works and Power evacuation system to be connected with Grid as per DISCOM TNPDCL norms including Comprehensive Oand M for 11yrs with 02yrs Guarantee period
Permanent Rectification of 5 Nos. of Blackspots (TN-02-665, TN-02-565, TN-02-566, TN-02-504 and TN-02-084) in Tuticorin to Tirunelveli section of NH-138 (Old NH-7A) in the State of Tamil Nadu on EPC mode
Construction of approaches to ROB at Km.51/700 (159-A and B at Km.55/6-10 between Singaperumalkoil and Paranur Stations) in the Tambaram Tindivanam section of NH-32 (Old NH 45) in the state of Tamil Nadu on EPC Mode.
Permanent Rectification of Black Spot TN(02)189, TN(02)406, TN(02)079 by Constructing VUP at Orrappam Km.8.617 with Service Road extended upto Chettipalli at Km. 9.850, LVUP at Kandhikuppam Km.11.720 on Krishnagiri to Walajahpet section on EPC mode
Permanent Rectification of 5 Nos. of Blackspots (TN-(03)-091, TN-(02)-568, TN-(02)-506, TN-(02)-728 and TN-(02)-049) in Madurai to Tuticorin section of NH-38 (Old NH-45B) in the State of Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-02-110 by constructing a Small Vehicular Underpass (SVUP) (1x7m x 4.5m) at Km.175.550 (Iruvelpattu Junction) in Tindivanam Ulundurpet section of NH-45 (New No.NH-38) in the State of Tamil Nadu on EPC mode
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu- Package-III (km 9.700 to Km 14.185)
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-IV (km 14.185 to Km 20.223)
Consultancy services for AE for Supervision of 4-Laning of existing 2-4 laning stretch of Mohol-Alandi (Pkg-IV) from Dharmapuri-Lonand (design Chainage 117.000 km-166.400 km with design length 49.400 km) Section of NH-965 in Maharashtra on EPC Mode
Providing and laying of 33 KV HT Electrical line for Power Supply from 33 KV Mannur Industrial Feeder fed from 110/33 KV Sriperumbuthur Sub Station to MMLP Chennai at Mappedu, Tiruvallur District in the State of Tamil Nadu on EPC Mode
Construction of 1 Nos ROB 2 Nos VUPs Service roads provision of lighting and construction of other miscellaneous works at various stretches on section of NH-4 from AP/Tamil Nadu Border (Km. 134.890) to Nalagampalli village (Km.172.000) under EPC mode
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-I (km 0.342 to Km 4.604)
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-II (km 4.604 to Km 9.700)
Construction of MSME Technology Centre at Coimbatore (Tamil Nadu) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 year during DLP Per
Widening of existing two lane to four lane with paved shoulders road and improvements from Km 302/60 to Km 306/60 of NH 948 including CD works Drain works in Tamil Nadu on EPC basis
Strengthening from Km 0/000 to Km 3/200 on NH-87 and from Km 46/275 to 48/175 of NH85 on (EPC) Basis Contract under Annual Plan 2024-25 in the state of TamilNadu
Long term remedial measures for Elimination of Black Spots ID TN(02)-441,TN(03)-08,TN-028, TN-(02)-308 at isolated locations from Chengalpattu (Km51.000) Tindivanam (Km121.000) section of NH-45 (New NH-32) in the state of Tamil Nadu on EPC Mode
Construction of approaches to ROB at Km 27/800 (95 A and B at Km 31/19-23 in Tambaram and Perungalathur Railway Stations) in the Tambaram Tindivanam section of NH-32 (Old NH 45) in the State of Tamil Nadu on EPC mode
Improvement Augmentation of Two lane with Paved Shoulders from Km 1.600 to Km 16.690 and Km.29.850 to Km.80.133 of Nagapattinam Thanjavur Section of NH 67 Old New NH-83 Total Design Length 65.373 Km in the State of Tamil Nadu on EPC Mode
Completion of Balance works (item rate and EPC mode) and Operation of Maintenance of Tirupati-Tiruttani-Chennai Section of NH-205 from Km 274/800 to Km 338/030 in Andhra Pradesh and from Km 0/000 to Km 61/470 in Tamil Nadu
Permanent Rectification of Blackspots TN-02-574, TN-02-395, TN-02-268, TN-02-092, TN-02-464, TN-02-153, TN-02-320 in Salem - Ulundurpet Section of NH-79 (Old NH-68) in the State of Tamil Nadu on EPC mode
Permanent Rectification of Black Spot TN-02-131 by constructing a Vehicular Underpass 12m x 5.5m at Km 93 704 in the project of Kumarapalayam Chengapalli section of NH-544 (old No. NH-47) in the State of Tamil Nadu on EPC mode 2nd Call
Permanent Rectification of Black Spot TN-(02)-115 by constructing a Vehicular Underpass (VUP) (20m x5.5m) at Km 80200 (Sikkaraimedu Jn.) in the project of Hosur-Krishnagiri section of NH-7 (New No. NH-44) in the State of Tamil Nadu on EPC Mode
Description read as Supply ,Erection,Installation and commissioning of limited functionally Hot Axle Box Detector system on turn key basis.
Widening from Two Lane Paved Shoulder to Four Lane with Paved Shoulder Km 81/300 - 110/700 of NH-81 and Strengthening from Km 81/300 - 86/500 and Km 87/600 - 96/300 of NH-81 on EPC mode in the State of Tamil Nadu
DESIGN CONSTRUCTION COMMISSIONING STARTUP AND PERFORMANCE RUN OF 4MLD CAPACITY WASTE WATER TREATMENT PLANT WWTP BASED ON AN ECOLOGICALLY APPROVED TREATMENT METHODOLOGY OF EPC CONTRACT ON DBOT BASIS ADJACENT TO FLOWER MARKET AT MATTUTHAVANI IN WARD 33
Project Management Consultancy Services for the post award EPC contract for completion of balance works in 1x660 MW Supercritical Etps Expansion Thermal Power Project till completion of the entire project and pre and post award consultancy services
Permanent Rectification of Black Spot TN-02-246, TN-02-387, TN-02-533 and TN-02-266 by constructing a LVUP at Km 209 475 (Nallikalpatti Junction) in the project of Thumbipadi - Salem - Namakkal section of NH 44 in the state of Tamil Nadu on EPC Mode
Permanent Rectification of Black Spot TN-02-640, TN-02-211, TN-02-128 by Constructing VUPs at Km.27.450, Km.110.000 and Km.126.700 in the project of Salem - Ulundurpet section of NH-79 (Old No. NH-68) in the State of Tamil Nadu on EPC mode
Permanent Rectification of 03 Nos. of Blackspots TN-02-194, TN-03-088 and TN-02-141 by constructing 6 Lane VUPs, and 4 Lane LVUP in Madurai to Kayathar section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode (2nd Call)
Permanent Rectification of Blackspot TN-(02)-236 and TN-(02)-300 by Constructing VUP (1 x 20 x 5.5m) and SVUP (1 x 10.5 x 4.5m) in Kayathar to Kanniyakumari Section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC Mode (2nd Call)
Widening of service road in Mettupalayam side approach of Periyanaickenpalayam flyover including Land Acquisition from Km.31/600 to 32/000 of NH-181 (Coimbatore - Ootty - Gundlupet Road) - on EPC Basis Contract Under Annual Plan 2024-25 in the Stat
Permanent Rectification of Black Spot TN-02-078 by construction of 2 Flyovers at Entry and Exit of Hosur New Bus Stand location at Km.43.400 and SVUP at Km.43.900 in Hosur Krishnagiri section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode
Permanent Rectification of 05 Nos. of Blackspots TN-02-282, TN-02-083, TN-02-162, TN-02-232, TN-02-292 by Constructing VUP, LVUP, and FOBs in Madurai to Kayathar section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode (2nd Call)
Strengthening selected stretches from Km 1/2 to Km 23/6 (9.50 Km) of NH-81 and Strengthening selected stretches from Km 6/0 to Km 23/0 (1.8Km) of NH-181 including junctions improvement at Km 6/0 to Km 6/4 of NH-181 on EPC mode in the Tamil Nadu
Works Contract On Turn Key Basis for Survey Supply Erection Testing and replacement of existing DOG conductor in existing 33 KV Kullampalayam Feeder Perundurai Division.
EPC contract for 1No. of Wind Turbine Generator with a rated capacity of 2.0MW and above to be installed at the premises of VOCPT Tuticorin Tamil Nadu with Operation and Comprehensive Maintenance for a period of 10 yrs including 1 yr Warranty period
Widening to Four lane in km 309/600-313/850, 315/0-318/300 and Km 331/0 332/2 (Palladam Karanampettai Chinthamanipudur L and T Bypass stretch) of NH 67 in the State of Tamil Nadu on Engineering, Procurement Construction (EPC) Basis Contract
Production and Supply of Polyester Based Hologram Excise Labels on Turn-key basis for a period of three years to the Prohibition and Excise Department,Government of Tamil Nadu
Periodical Renewal from Km 24/0-33/0 (Except Km 26/6-26/8), Km 35/0-37/8, 38/940-39/120, 39/900-40/500 and 42/280-42/710 of NH 234 (Mangalore-Villupuram Road) New NH-75 on Engineering, Procurement and Construction (EPC)
e- TENDER FOR SUPPLY OF UNIQUE QR CODE STICKERS ON TURN KEY BASIS FOR THE SCHEME OF BUYING BACK EMPTY LIQUOR BOTTLES IN TASMAC RETAIL VENDING SHOPS FOR A PERIOD OF THREE (03) YEARS
Design, Engineering, Procurement and Construction including Hydraulic Testing, Satisfactory Trials and Commissioning of 5MLD Capacity Sewage Treatment Plant (STP) based on Sequencing Batch Reactor (SBR) Technology followed by Ultra Filtration Tertiar
Periodical Renewal in Km72/7 - 89/500 of NH 45A in the state of TamilNadu on EPC mode.
Four laning of Ottanchatram to Palani section from km 30/700 to km 55/000 of NH 209 (New NH-83) including footpath and way side amenities except km 37/870 to 38/130, 39/200 to 41/000, 43/400 to 44/100, 47/400 to 51/000 and 52/200 - 52/965 on EPC mode
EPC TWG AT MADURAI
Design, Engineering, Procurement and Construction including hydraulic testing, satisfactory trials and commissioning of 2 MLD Capacity Sewage Treatment Plant (STP) based on Sequencing Batch Reactor (SBR) Technology followed by Ultra Filtration Techno