Loading…
Loading…
3,379 results • Best match
Replacement of old and damaged 11 KV switchgear panel at 33/11 KV Sub-Station Kushinagar and 33/11 KV Sub-Station Kotwa, Distt.-Kushinagar on Turnkey Basis under Business Plan Year 2018-19
Construction of 33 K.V. (U/G) line from 132 K.V. Sub-Station Mohaddipur, Distt. - Gorakhpur to 33/0.4 K.V. Sub-Station Railway Locoshed, Distt. - Gorakhpur on Turnkey Basis under Deposit Scheme Year 2018-19
UNDERGROUND CABLING WORK ON TURNKEY BASIS
LINE SHIFTING ON SEMI TURNKEY BASIS
UNDERGROUND CABLING WORK ON TURNKEY BASIS
1. Construction of Artisan centre, Kachhpura, Agra
As per Bid Doc. No. CS-0011-940-9
Shifting of 02 Nos. Tower at 132 KV DC Fatehabad-Bhimnagri and 132 KV DC Agra (4) Taj Line including supply of monopole, Fittings, Line material but excluding conductor and earthwire on turn-key basis. under ETD-I Agra
The work for Bifurcation of 11 KV Ramghat Feeder U/G line 3x185 sq mm XLPE Cable in the Area of UEDD-III, Varanasi Under EE, UECD-II, Varanasi on Turn-Key Basis in Grismkalin Business Plan-2022-23.
Execution of erection works for Dismantling of part of existing and diversion shifting of part of section of existing 220KV 132KV lines ON TURN-KEY BASIS for the purpose of construction of Maryada Puroshottam Shri Ram International Airport Ayodh
Construction of Approx. 17.0 Kms. 33 KV line from 132 KV Ss. Chakar Nagar to 33-11 KV Ss., Dhhakataal and from 220 KV Ss. to 33-11 KV Ss., Navedi Kalan in Distt.-Etawah on Turn-key basis.
Set of wire brush easy to fit on hand drill machine for cleaning of components (EPC and others) in Relay Section. Consist of three type of brush. 1.) Disc type brush Dia.: 2" - 3 Nos. 2.) Disc type br
The Work for Shifting of 11 KV/LT Line by MVDA Mathura at Newly Constructed Jan Suvidha Kendra Goverdhan Mathura on Semi Turnkey Basis under Deposit Scheme in the jurisdiction of EDD-IV, Goverdhan, Mathura
work of making New 100 kva connection on Semi Turnkey basis for Oxygen Plant in CMS Womens MMG Hospital in the Area of EE, EUDD-VII, GZB. Under the jurisdiction of SE, EUDC-III, GZB.
Work of 11 KV Lines Bifurcation, Strengthening and System Protection Works on Semi-turnkey basis in Business Plan 2024-25 (Part-02) under the Jurisdiction of the Electricity urban Distn. Division-I/II/III, Moradabad
Execution of work for PROTECTION OF L.T. EQUIPMENT SUCH AS 100 KVA and above DISTRIBUTION TRANSFORMER (on semi turnkey basis) IN THE AREA OF Electricity Distribution Division-ii, Gorakhpur against Business plan scheme 2024-25
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S Jhirilakashipur Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
Quantum of work for involved in shifting of existing diff. Lines at Nawai to Jasmada Marg due to Road widening under P.M.G.S.Y. by FDR Technology under the area of EDD-V Hasanganj, Unnao. (Turnkey basis).
Replacement of Jarjar 33 KV Underground cable from 132 KV N.K.N. to Hanuman Marbles for 33 11 KV S S New University Campus and assoicated work On Semi turnkey basis Under Business Plan 2024 25
CONSTRUCTION NEW ADDITIONAL 33 KV LINE HARAHUA, 33 KV U/G LINE TO MAKE D/C OF EXISTING 33 KV LINE BETABER AND CONSTRUCTION OF 33 KV GANJARI AND GANGAPUR VARANASI ON SEMI TURNKEY BASIS
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S karchana Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
TURNKEY WORKS OF SUPPLY INSTALLATION AND ASSOCIATED CABLING OF RACKS PANELS ENCLOSURE FOR DEVELOPMENT OF NEW NOCC SERVER ROOM INFRASTRUCTURE ALONG WITH THE ASSOCIATED JOBS OF SHIFTING OF GAILTEL SERVER ROOM NOCC MUX ROOM EQUIPMENT
Tapping of Sec-25 Indira Nagar Line Enamating from 132 Khurram Nagar, Badri Saraf Exposure to 33/11 KV S/S Vikas Nagar and assoicated work On Semi turnkey basis Under Business Plan 2024-25.
CONSTRUCTION OF 33KV LILO ARRANGEMENT AT 33/11 KV SUBSTATION KARKHIYAON, VARANASI FOR M/S BHEL C/O SRI RAJBIR SAINI, H1 B/2, (PACKAGE A) INDUSTRIAL AREA, AGRO PARK, KARKHIYAON, VARANASI SEMI TURNKEY BASIS.
Construction of proposed 33 KV RADHA KUND Link Line by tapping at 33 KV Aanyor line for providing double source supply at 33/11 KV S/S RADHA KUND District- MATHURA. On Semi-Turnkey Basis.
Supply of Materials and Erection for Increasing Capacity of 33/11 KV S/S Ajuwa, Devakharpur, Ghatmapur , Bharwari , Gopsahasa and Purkhas Distt. Kaushambi in Business Plan 2024-25 on Semi Turnkey Basis under EDC Kaushambi
WORK OF increasing capacity of TF, Installation of New TF, 11 KV/LT Line erection and strengthening of other work in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.
Work of incoming and outgoing VCB replacement work and improvement work of switchyard at 15 places under the area of EDD-I/II/III/IV Ballia on semi-turnkey basis (under 20 crore work plan)
construction of proposed 33 KV SITE-B LINE from Newly Constructed 132 KV Sub-Station Farah for Providing Double Source Supply at 33/11 KV S/s Site-B District- MATHURA. On Semi-Turnkey Basis.
After the expansion of Khalilabad Municipality, under the deposit scheme for the Executive Engineer Power Distribution Section, construction works of 3 Nos. of feeders on semi-turnkey basis by connecting new villages Sadikganj, Bargo, Saraiya,
Supply of material for Shifting of 33KV, 11 KV and LT lines and other electrical equipments in Pradhanmantri Sadak Yojna under EDC Etah in EDD-I, II and EUDD Etah on turnkey basis (Deposit Scheme)
CONSTRUCTION OF 33KV LINE GANGAPUR VARANASI, 33KV LINE GOPALAPUR JAUNPUR, INCREASING CAPACITY OF 33/11 KV SUBSTATION SUJABAD CHANDAULI AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSTATION SUJABAD, DIST-CHANDAULI ON SEMI TURNKEY BASIS.
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S Gaura Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
Work of Capacity enhancement 5 MVA To 10 MVA of 33/11 KV Sub-station at Dubhar sub station under the area of EDD- IV Ballia on semi-turnkey basis (under Business plan 2024-25)
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S Hathigan Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
Electrification works of 33 KV Line and other associate works for issuing 33 KV connections three nos. for Jal Jivan Mission Plan in the area of EDD-Mant, Mathura under Deposit Scheme on turnkey basis
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S hata Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S Dahi Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
Installation of 04 Nos. Additional 05 MVA T/f at 33/11 KV S/s Rawatpur, Hariharganj, Khaga Rural and Hathgaon Distt. Fatehpur in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur
Work of strengthening of 04 sub-stations in 33/11 KV electrical sub-station Dhanaghata tehsil Molnapur Mukhlishpur Hansar under Executive Engineer Electricity Distribution Division Khalilabad on semi-turnkey basis (under 20 crore work plan)
33 KV line strengthening work, 11 KV line strengthening work and 11 KV New line construction work on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDD, Kiraoli and Kheragarh, Agra
For the execution of ongoing works on a semi turnkey basis specifically regarding the electrification and issuance of new connections during the year 2026-27 the Jhatpat portal under the Deposit Scheme EDD GULHARIYA BAZAR
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING, AND CONSTRUCTION OF NEW LINE AND MISC. WORKS (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-CHAURI CHAURA, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
for EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER, INSTALLATION OF SECOND POINT DISTRIBUTION TRASFORMER (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-Chauri Chaura, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Supply of Material and Erection for Installation of Additional 5 MVA T/F at 33/11 KV S/S Jari Distt. Prayagraj in Business Plan 2023-24 on Semi Turnkey Basis under EDC-I, Prayagraj
SUPPLY AND ERECTION PRICES OF MATERIALS FOR CONSTRUCTION OF 08 KM. 33 KV LINK LINE FROM 132 KV S/S PATTI TO 33/11 KV S/S SAIFABAD DISTT. PRATAPGARH WORK ON SEMI TURNKEY BASIS.
Separation of overloaded 11 KV Pataraa Feeder (Presently emination from 33/11 KV Sub-Station Medical College) from 33/11 KV Sub-Station Khutahan, Distt.- Gorakhpur on Turnkey Basis under Business Plan Year 2018-19
Separation of overloaded 11 KV Siktour Feeder (Presently emination from 33/11 KV Sub-Station F.C.I. Gorakhpur) from 33/11 KV Sub-Station Sarahri, Distt.- Gorakhpur on Turnkey Basis under Business Plan Year 2018-19
Construction of new 33 KV line from 132/33 KV Sub-Station Purnachapar, Distt.-Deoria to existing 33/11 KV Sub-Station Bhingari Bazar, Distt.- Deoria on Turnkey Basis under Business Plan Year 2019-20
Replacement of old and damaged 11 KV switchgear panel at 33/11 KV Sub-Station Sewai Bazar and 33/11 KV Sub-Station Pipiganj, Distt.-Gorakhpur on Turnkey Basis under Business Plan Year 2018-19