Loading…
Loading…
3,379 results • Best match
Works for construction of 18.8 Km. 33 KV link line from new constructed 132/33 KV S/s., Madhogarh to 33/11 KV S/s., Iton in District-Jalaun on Turn-key Basis (under Business Plan).
C/o. Lecture Hall Complex G plus 1 floors on EPC Mode-I basis with civil works i/c internal water supply & sanitary installations, sewerage system, drainage & development works, internal roads with foot paths, parking areas, signages, external water supply & sewer lines, storm water drains, UG sump, OHT, STP, Rain water harvesting etc., and Electrical works i/c internal external electrical installations, power wiring & plugs, fans, fire fighting with wet riser and automated sprinkle & fire alarm and public addressable system, SITC of 630KVA substation equipment i/c Lt panels, SITC of 400KVA DG Set, SITC of UPS system, SITC of 100 Kwp solar photo voltaic power generation system, SITC of IP based CCTV system and IP based EP-BAX, SITC of VRV/VRF AC with AHU and split air conditioning in server room and UPS room system, SITC of Lan and Wi-Fi system, audio visual / conference system, SITC of lift and SITC of integrated building management system Led street lighting, water supply..........
As per Bidding Doc. No. CS-1150-001(R)-2
Refer to Tender Description
Development of 6Lane AC Highway from Ranipur Barsi Saharanpur dist to Adhoya Musalmana Ambala dist Ch. 45.500 to 84.400 of Shamli Ambala sec of Bareilly Ludhiana EC on EPC under BMP Ph-1 in Haryana Pkg-2
Installation and Energisation of 3 MVA 11/0.4 KV T/F alongwith 11 KV V.C.B. in Full Turn Key Basis, for giving connection to Bio C.N.G. Plant, Arail, Naini, Prayagraj under the jurisdiction of E.U.D.D., Naini, Prayagraj
Work of installation of additional transformers (as per attached list) in 61 villages/localities under the area of EDD-I/II/III/IV Ballia on semi-turnkey basis (under 20 crore work plan)
Vidhut Vitran Khand Muradnagar ke Anterget Nav Sarjit/Vistarit Nagar Nikayo main nirdharit Ghante Vidhut Aapurti ke dristigat DPR Main 11 KVA Town Dhedha and Abupur Feeder Vibhaktikaran Work on Semi Turnkey base
Design, Supply, Installation, Commissioning, Training of various type of equipments for ESDM (Electronic System Design and Manufacturing) of MSME Training Centers located at Greater Noida, Bengaluru, Puducherry and IDEMI Mumbai on turnkey basis
Work of 11 KV Feeder Bifurcation, Installation of various Distribution Transformer, Damaged ABC cable, 11 KV incoming and outgoing VCB in Business Plan 2023-24 again Semi Turnkey basis under EDD-II, Prayagraj
EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER, SECOND POINT DISTRIBUTION TRANSFORMER AND INSTALLATION OF NEW DISTRIBUTION TRANSFORMER (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SAHJANWA, GORAKHPUR AGAINST BUSI
EXECUTION WORK FOR SHIFTING OF LINE AT VILLAGE BASGAON TO BHITAULI, KAURIRAM GOLA ROAD TO JANIPUR AND VISHUNPUR TO SINGHA ON SEMI TURNKEY BASIS IN DEPOSIT HEAD UNDER ELECTRICITY DISTRIBUTION DIVISION KAURIRAM, GORAKHPUR
Work of installation of additional transformers (as per attached list) in 30 villages/localities under the area of EDD-I/II/III/IV Ballia on semi-turnkey basis(under Business plan 2024-25)
Construction of new 33 KV Line(2.5 Km.) from New 220 KV Sub-Station Jaitpur Mahoba to 33/11 KV Sub-Station Ajnar in Distt-Mahoba Under Business Plan 2025-26 (Semi-Turnkey)
Increasing Capacity of 33/11 KV S/S Jankipuram ext, Sec-I, from 2X5 MVA to 1X5 plus 1X10 MVA and associated work On Semi turnkey basis work Under AIIB Plan-2023-24
Works for System Strengthening (Replacing damaged wires, GI Wires, pole shifting and guarding etc) on Semi-turnkey basis under Business Plan 2024-25 under the Electricity urban Distn. Division-I/II/III, Moradabad
For The Work of Business Plane scheme 2024-25 Part-II Providing and Installing LT Protection Unite on Turnkey Basis of Distribution Transformers Situated at Different sites in the area of EUDC Meerut.
Supply of Materials and Erection for Construction of 33 KV Line Aabunagar from 132 KV S/S Husainganj Dist. Fatehpur in additional Business Plan 2024-25 on Semi Turnkey Basis under EDC Fatehpur
33 KV line strengthening work, 11 KV line strengthening work and 11 KV New line construction work on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDD, Sikandra, Agra
The Work for Shifting of 33 KV line laying along Sant Atulanand School Chauraha to J.P. Mehata School Via Sunbeam Varunapur on Semi-Turnkey basis in Deposit Scheme. Under EE, UECD-II, Varanasi
SHIFTING OF 33KV OVERHEAD LINE DUE TO CROSSING OVER THE FIELD OF SRI BHUNESHWAR RAM, TARWANIA, SAIDPUR, GHAZIPUR EMANATING FROM 132/33 KV SUBSTATION JAUHERGANG TO SUBSTATION PAHARPUR, GHAZIPUR ON SEMI TURNKEY BASIS.
Work of Full Deposit Scheme MP MLA Fund and other various deposit schemes done through running contract under Electricity Distribution division kunda Pratapgarh on semi turnkey basis including loading and unloading of material.
Work of 11 KV Feeder Bifarcation, Installation of various Distribution Transformer, Damaged ABC cable, 11 KV incoming and outgoing VCB in System strenghting 2023-24 again Semi Turnkey basis under EDD-Handia, Prayagraj.
Work of Full Deposit Scheme MP MLA Fund and other various deposit schemes done through running contract under Electricity Distribution division lalganj Pratapgarh on semi turnkey basis including loading and unloading of material.
Planning, Design, Engg., Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run and Commissioning towards upgradation/modification of existing ETP on turnkey basis incl. Operation and Maintenance for five years for Bina OCP,NCL
Work of Full Deposit Scheme/MP/MLA Fund and other various deposit schemes done through running contract under Electricity Distribution Division Raniganj, Pratapgarh on semi turnkey basis including loading and unloading of material.
Work of 11 KV Feeder Bifurcation Installation of various Distribution Transformer Damaged ABC cable, 11 KV incoming and outgoing VCB in System strengthning 2023-24 against Semi Turnkey basis under EDD-Phaphamau, PrayagrajPrayagraj.
33 KV line strengthening work, 11 KV line strengthening work and 11 KV New line construction work on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDD, Lakhanpur, Agra
Work of Full Deposit Scheme/MP/MLA Fund and other various deposit schemes done through running contract under Electricity Distribution Division Lalganj, Pratapgarh on semi turnkey basis including loading and unloading of material.
EXECUTION OF WORK FOR FEEDER BIFURCATION 33/11 KV SUBSTATION GAJPUR AND PAKRI feeder (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-KAURIRAM, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2025-26
Work for the construction work of LT line under the Chief Minsiter Nagar Srijan Yojana in Nagar Panchayat Itwa in the depostie plan year 2024-25 under EDD Dumariyaganj on Semi-Turnkey basis
Work of Full Deposit Scheme/MP/MLA Fund and other various deposit schemes done through running contract under Electricity Distribution Division Kunda, Pratapgarh on semi turnkey basis including loading and unloading of material.
SUPPLY AND ERECTION PRICES OF MATERIALS FOR CONSTRUCTION OF 33 KV LINK LINE FROM 132 KV S/S GADWARA TO 33/11 KV S/S MEDICAL COLLEGE GAYAGHAT PRATAPGARH ON SEMI TURNKEY BASIS
Work of replacement of Damaged AB Cable and dog conductor at 35 places under the area of EDD-I/II/III/IV Ballia on semi-turnkey basis (under Additional Business Plan 2023-24 )
SCHEDUL OF WORKS/RATES AND TECHNICAL SPECIFICATION FOR TRANSPOTATION OF MATERIAL ,CHECK SURVEY,CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF CONDUCTOR ,EARTHWIRE AND EARTHING AT SAI RIVER, RAMDAYALGANJ, JAUNPUR ON TURNKEY BASIS
Work of installation of additional transformers (as per attached list) in 19 villages/localities under the area of EDD-I/II/III Ballia on semi-turnkey basis (under Additional Business plan 2024-25)
SHIFTING OF 33 KV UNDERGROUND AND OVERHEAD LINE AIRPORT FEEDER AND SHIFTING OF 33 KV OVERHEAD LINE HARIHAR COLD STORAGE BY UNDERGROUND AND OVERHEAD LINE LBS INTERNATIONAL AIRPORT BABATPUR VARANASI ON SEMI TURNKEY.
Construction of independent feeder, line construction and installation of transformer for new mini industrial area Rangrezpur, Block- Dumariaganj, Siddharthnagar in the Deposit scheme year 2024-25 under EDD Dumariagnj on Semi-turnkey basis
Construction of proposed 33 KV Goverdhan Link Line by tapping at 33 KV Aanyor line for providing double source supply at 33/11 KV S/S Goverdhan District- MATHURA. On Semi-Turnkey Basis.
SUPPLY AND ERECTION PRICES OF MATERIALS FOR CONSTRUCTION OF 33 KV LINK LINE FROM 132 KV S/S MALWAN TO 33/11 KV S/S MEDICAL COLLEGE ALIPUR FATEHPUR ON SEMI TURNKEY BASIS
Work of Supply and Erection Tailless Fuse Unit on various capacity of LT T/F in the area of 33/11 KV Substation, Awas Vikas under EDD-Ist, Bijnor on Semi-turnkey basis
Construction of Double Circuit 33 KV U/G Line from 220 KV Jehta to 33/11 KV S/S Daud Nagar and assoicated work On Semi turnkey basis Under Business Plan 2024-25.
Construction of Single Circuit 33 KV U/G Line from 132 KV Indira Nagar to 33/11 KV S/S H.A.L. and assoicated work On Semi turnkey basis Under Business Plan 2024-25.
Construction of Double Circuit 33 KV U/G line from 220 KV Satrik to 33/11 KV S/S Mantri Awas and assoicated work On Semi turnkey basis Under Business Plan 2024-25.
Supply of Materials and Erection for Increasing Capacity of T/F installed at 33/11 KV S/s Jahanabad Distt. Fatehpur in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur.
SUPPLY AND ERECTION PRICES OF MATERIALS FOR CONSTRUCTION OF 33 KV LINE FROM 132 KV S/S SORAON TO 33/11 KV S/S KATRA GULAB SINGH DISTT PRATAPGARH ON SEMI TURNKEY BASIS
Supply of Materials and Erection for Construction of 33 KV Line Aabunagar from 132 KV S/S Husainganj Dist. Fatehpur in additional Business Plan 2024-25 on Semi Turnkey Basis under EDC Fatehpur
Construction of new 33/11 KV substation and associated 33 KV and 11 KV lines on turnkey basis under Business Plan in Urban areas at Hydel Coloni Chandausi, (Capacity 2X5 MVA), District Sambhal.
Supply of Materials and Erection for Construction of 33 KV S/S Chamanganj and Malawa and associated 33 KV line under EDC-II in Distt. Prayagraj in Deposit Scheme on FULL TURNKEY BASIS
Construction of new 33/11 KV substation and associated 33 KV and 11 KV lines on turnkey basis under Business Plan in Rural areas at Chhatanga Khurd, (Capacity 2X5 MVA), District Gautambudh Nagar.