Loading…
Loading…
3,379 results • Best match
Construction of Double Circuit 33 KV U/G Link line from 33/11 KV S/S UPSIDC, Chinhat to 33/11 KV S/S Omega and assoicated work On Semi turnkey basis Under Business Plan 2024-25.
A total of 40 works under the EDD-Mehdawal, respectively, 36 works of capacity increase work of overloaded distribution transformers, 3 works of trolley transformer installation work, work of separation of Pachpokhari Indodutch feeder on semi turnkey
Shifting work of 11 KV, LT lines and transformers in village Lalganj-Manjhanpur-Mau road (LINE SHIFTING FROM BHAGWAN TIRAHA KUNDA TO MANGARH DHAM MANDIR) under Electricity Distribution Division Kunda, Pratapgarh on semi turnkey basis including loadin
Construction of single Circuit 33 KV U/G Line from 33/11 KV S/S Indira Nagar to 33/11 KV S/S Mahila Polytechnic and assoicated work on Semi turnkey basis Under Business Plan 2024-25.
For the work of issuing 550 KVA new connection (Site C.W.U.R.) in village Kathwari, Achnera Agra under Jal Jeevan Mission on semi turnkey basis in Full deposit scheme under the area of Electricity Distribution Division, Lakhanpur, Agra.
Work for Shifting of 11 KV and LT lines and other electrical equipments in Etah-Ganjdundwara Marg Chaudikaran under EDD-II Etah on semi turnkey basis (Deposit Scheme) Work for Shifting of 11 KV and LT lines
Rate Contract for repairing and maintenance of H.V. 33 11 KV Underground cable faults in various voltage level cables on Turnkey Basis (Providing and its Commissioning New Technology Fault Locator Machine with Driver, Different Types of Termination
Rate Contract for repairing and maintenance of L.T. Underground cable faults in various voltage level cables on Turnkey Basis (Providing and its Commissioning with New Technology LT Fault Locator Machine with Driver, Different Types of Termination Ki
Work of Construction And bifurcation of 11 KV Lines and replacement Damaged 11 Kv Line at 34 places under the area of EDD-I/II/III Ballia on semi-turnkey basis (under Additional Business plan 2024-25)
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING OF ELECTRIC LINES AND SUBSTATIONS IN AREAS RELATED TO NEWLY CREATED/EXPANDED NAGAR NIKAY 2024-25 (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-CAMPIERGANJ, GORAKHPUR A
Total 19 different works, 03 feeder separation work, 11 dilapidated incoming and outgoing VCB replacement work and improvement work of switchyard of power sub-station on semi-turnkey basis (under 20 crore work plan) under EDD-MEH
Capacity Enhancement of 11/0.4 KV Transformers and work of Construction of New 11/0.4 kv Sub-stations under the Electricity urban Distn. Division-I/II/III, Moradabad on Semi-turnkey basis under Business Plan 2024-25.
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING OF ELECTRIC LINES AND SUBSTATIONS IN AREAS RELATED TO NEWLY CREATED/EXPANDED NAGAR NIKAY 2024-25 (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-II, KAURIRAM GORAKHPUR
Design, Engineering, Construction and Commissioning of Workshop and Store at Dudhichua Opencast Project and all other accessories and facilities required to make it complete in all respects on turnkey basis and Maintenance of plant for five years.
Work of Supply and Erection of Tailless Fuse Units on various capacity of LT Distribution T/F at different 33/11 KV Substations under the Jurisdiction of EUDC, Moradabad on Semi-turnkey basis (Business Plan 2024-25).
Construction of single Circuit 33 KV U/G Line from 33/11 KV S/S Indira Nagar to 33/11 KV S/S Mahila Polytechnic and assoicated work on Semi turnkey basis Under Business Plan 2024-25.
CONSTRUCTION OF NEW 33/11 KV SUBSTATION WITH 1X5 MVA POWER TRANSFORMER FOR BAURI, DIST. GHAZIPUR, CONSTRUCTION OF NEW 33 KV LINE AND 11KV LINE FOR 33/11 KV SUBSTATION BAURI, DIST. GHAZIPUR ON SEMI TURNKEY BASIS.
Construction of 01 No. 132kV GIS Bay and 01 No. 33kV GIS Bay includes Erection and Commissioning of 01 No. 63MVA Power Transformer for Increasing Capacity Work at Existing 220kV GIS Jalpura, Gr. Noida on Turnkey Basis
CONSTRUCTION OF33 KV INDEPENDENT FEEDER FROM RESPECTIVE PRIMARY SUBSTATION AND33/.04 KV SUBSTATION AT DISTRICT COURT PREMISES OF HARDOI, RAEBARELI,UNNAO ON TURNKEY BASIS WITHIN STIPULATED TIME IN COMPLAINCE OF ORDER PASSED,BY HONBLE HIGH COURT UP.
Capacity Augmentation of 20 Nos. 33 KV Substations along with construction of associated 33 KV and 11 KV Line at different places of Electricity Distribution Zone Moradabad on partial-turnkey basis under Integrated Power Development Scheme (IPDS)
Capacity Augmentation of 13 Nos. 33 KV Substations along with construction of associated 33 KV and 11 KV Line at different places of Electricity Distribution Zone Meerut on partial-turnkey basis under Integrated Power Development Scheme (IPDS)
Capacity Augmentation of 10 Nos. 33 KV Substations along with construction of associated 33 KV and 11 KV Line at different places of Electricity Distribution Zone Ghaziabad on partial-turnkey basis under Integrated Power Development Scheme (IPDS)
Capacity Augmentation of 5 Nos.33 KV Substations along with construction of associated 33 KV and 11 KV Line at different places of Electricity Distribution Zone Saharanpur on partial-turnkey basis under Integrated Power Development Scheme (IPDS)
Supply of ACSR Rabbit conductor for construction of New 33 KV Substations and Augmentation of existing 33 KV Substation on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India
Supply of ACSR Dog conductor for construction of New 33 KV Substations and Augmentation of existing 33 KV Substation on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India.
All work to be done underground by cable to the existing LT Overhead lines from Rajendar Nagar, Gorakhpur to Dharmashala Over Bridge Gorakhpur and necessary work for provisional power supply system on Turnkey Basis Year 2018-19
The work for construction of 33 KV Independent Feeder from 132/33 KV S/S Cantt to 33/11 Koilahwa in the area of UEDD-Varunapar, Varanasi Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
Work of Construction of 220 KV Multi Circuit Line at 400 KV Agra Pilipokher end for connecting 220 KV Agra Pilipokhar-IOCL, D/C Line to 220 KV switchyard by realigning the existing 220 KV Lines under ETD, Mathura On Turn Key Basis
Shifting of LT 11 KV 33KV Line from Deeg Adda to Palso for widening of Goverdhan to Palso Four lane Under Declaration Hon. C.M U.P. Under Deposit scheme EDD Goverdhan in District Mathura of U.P. under DVVNL Agra on Turn-Key Basis
Refer to Tender Description
Refer to Tender Description
Construction of connecting road at BHS for six laning along with full access control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun in the Uttar Pradesh and Uttarakhand on EPC under BMP Phase-1, package 1 and 2
CS for AE for Supervision of Construction of 4lane Greenfield Delhi AmritsarKatra Expway from Jn. with Jalandhar Moga rd NH703 near Kang Sahibu to Jn. and Jn. with Jalandhar Moga rd NH703 near Jn. with Kapurthala Sultanpur Lodhi rd NH703A on EPC unde
Construction of Service road Foot Over Bridge Development of Junctions in the Meerut to Bulandshahr section of NH 235 (New NH 334) from km. 8.800 (Design Chainage.8.800) to km. 66.482 (Design Chainage.73.512) in the State of Uttar Pradesh on EPC mod
Const of Interchange at 126.137 Jn of Palwal Aligarh Hway SH22A with Eastern Peripheral Expway access to Wyside Amenities at 39.500 83.005 95.575 and access to Trilok Tirth Dham at 22.500 to 23.020 of Eastern Peripheral Expway on EPC in HR n UP
Construction of 11KV Line, Installation of Metering system and Sub Station in the Area of EDSD-VI, Pali and Increasing Capacity of T/F 5MVA to 10MVA at 33/11KV Substation Jakhlon (Semi Turnkey Based) under deposit scheme
Design, engineering and construction of 100 bed old age home at Varanasi consisting of all civil, structural, electrical and mechanical works and all other accessories and facilities required to make it complete in all respect on turnkey basis.
Shifting of 11 KV overhead/LT Overhead, DT Pole installation and other works etc. due to road expansion from Brahamand Ghat to Raskhan Samadhi in the area of EDD-Laxminagar, Mathura under Deposit Scheme on semi turnkey basis
For the Work of utility shifting of 11 KV and LT lines on TURNKEY BASIS in full deposit scheme under jurisdiction of EDD-1 Agra due to road widening work under Pradhan Mantri Gram Sadak Yojana Scheme-3
Work of Strengthning of 33/11 KV Sub-station and 11 Kv Line and Lt line at 27 places under the area of EDD-I/II/III Ballia on semi-turnkey basis (under Additional Business plan 2024-25)
SHIFTING OF 33 KV UNDERGROUND CABLE AT VILLAGE NATHUPUR TIRAHA (BETWEEN 132KV SUBSTATION HUSAINABAD TO MOTHAHA PUMP CANNAL) AND SHIFTING OF 33 KV LINE JAUNPUR TOWN FROM RAILWAY TRACK NEAR NATHUPUR TIRAHA, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
Capacity enhancement of 11/0.4 KV Sub-station, New 11/0.4 KV S/s and renovation/Augmentation of LT/HT Line under the Electricity urban Distn. Division-I/II/III, Moradabad on Semi-turnkey basis under Business Plan.
Electrical work for laying underground 33 KV cable and installation of poles in midspan and Repair of 33 KV Electrical equipment etc at various SB on semi-turnkey basis in Business Plan Year 2024BY25 Under EDD I_II_III MAINPURI
For the Work of issuing 300 KVA connection in LMV-9 to M/s Larsen nd Tourbo Ltd Site- Khasra No. 1010, Kolarakalan Agra on semi turnkey basis in Full deposit scheme under Electricity Distribution Divison-I, Agra.
Quantum of work for construction of 11 KV line for G/S to seavrage Treatment plant MLD-04-350 KVA at Mohalla Ahmad Nagar (Near Pani ki Tanki Mann Bagiya) Katri Piper Khera (Shuklaganj), Gangaghat, Unnao. (Turnkey basis).
Work of Construction and Bifurcation of 11 KV Line, Construction of 11/0.4 kv Substation, Strengthening of 33 KV/11 KV/LT Lines etc. under the EUDD-Delhi Road, MBD on Semi-turnkey basis under B.P. 2025-26
Work of Capacity enhancement 5 MVA To 10 MVA of 33/11 KV Sub-station at Sikanderpur and Jam sub station under the area of EDD- III Ballia on semi-turnkey basis (under Additional Business plan 2024-25)
Electrification work, along with construction of HT, LT lines and installation of transformers, etc. in the newly created/expanded urban bodies, on full turnkey basis Under the deposit scheme in the area of Electricity distribution Division-1st Mau,
Supply of Materials and Erection for Construction of 33 KV line From 132 KV S/S Gadhwara to 33/11 KV S/S Chilbila Dist. Pratapgarh in Business Plan 2024-25 on Semi Turnkey Basis under EDC, Pratapgarh
Supply of Materials and Erection for Construction of 33 KV line From 132 KV S/s Husainganj to 33/11 KV S/s Paliya Distt. Fatehpur in Business Plan 2024-25 on Semi Turnkey Basis under EDC, Fatehpur