Loading…
Loading…
3,379 results • Best match
Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC
Construction (EPC) of 02 lane Rail Over Bridge at LC No. 154 SPL (Km 134/15-17) on Kanpur-Kasganj Rail Section and at LC No. 9 SPL on the Neem Karori Rail Section of North Eastern Railway on Fatehgarh- Farrukhabad Road in District Farrukhabad
DEPOSIT WORK ON SEMI TURNKEY BASIS UNDER EDD SAIFAI
DEPOSIT WORK ON SEMI TURNKEY BASIS UNDER EDD ETAWAH
Supply of Materials and Erection for Construction of 33/ 11 KV SUB STATION (2X5) MVA BIBIPUR Distt. Prayagraj and its associated 33 KV and 11 KV Line in Business Plan 2024-25 on Semi Turnkey Basis under EDC-II, Prayagraj
Supply of Materials and Erection for Increasing Capacity of 33/11 KV S/S Serawa, Katehara, Fatehpur Ka Sthan, Kaudhihar,Pratappur, Ghosada, Soraon and Mau Doshpur Distt. Prayagraj in Business Plan 2024-25 on Semi Turnkey Basis under EDC-II Prayag
PROVIDING UNINTERRUPTED POWER SUPPLY WITH HELP OF 33KV RMU, A-3000KVA NEW SERVICE CONNECTION IN HV-1 TARIFF TO INTERNATIONAL CRICKET STADIUM BY CONNECTING AND CONST. OF NEW 33KV LINE 132KV S/S RAJATALAB AND KURSATO DIST. VNS ON TURNKEY BASIS.
Supply of Material and Erection for Construction of 33 KV link line from 132 KV S/S Malawa to 33/11 KV S/S Bindaki Road Distt. Fatehpur under Additional Business Plan 2024-25 on Semi Turnkey Basis under EDC, Fatehpur
Supply of Materials and Erection for Construction of 33/ 11 KV SUB STATION 2X5 MVA Kadipur, Manjhanpur Distt. Kaushambi and its associated 33 KV and 11 KV Line in Business Plan 2025-26 on Semi Turnkey Basis under EDC, Kaushambi
Work of Capacity enhancement of 11/0.4 KV Sub-station, New 11/0.4 KV S/s and renovation/ Augmentation of LT/HT Line under the Electricity urban Distn. Division-I/II/III, Moradabad on Semi-turnkey basis under Additional Business Plan.
Supply of Materials and Erection for Construction of 33/ 11 KV SUB STATION (2X5) MVA Dharampur Sato Distt. Fatehpur and its associated 33 KV and 11 KV Line in Business Plan 2025-26 on Semi Turnkey Basis under EDC, Fatehpur
For the Work of Providing and Installing LT Protection Unit in Business Plan 2024-25 on Turnkey Basis of Distribution Transformers Situated at Different Sites in the Area of EUDD-I, II, III, IV and V, Meerut Under EUDC, Meerut.
Work of Capacity enhancement of 11/0.4 KV Sub-station, New 11/0.4 KV S/s and renovation/ Augmentation of LT/HT Line under the Electricity urban Distn. Division-I/II/III, Moradabad on Semi-turnkey basis under Nagar Nigam Plan.
SITC of 60 MT LWB by upgradation of existing 40 MT LWB to 60MT Capacity fully Electronic Lorry Weighbridge without cabin at FSD Kosikalan Old inclusive of 2 years guarantee and 3 years Comprehensive AMC including Civil Electrical works on turnkey
For the work of 11 KV independent feeder for issuing 250 KVA new connection in village Patsal (Fathepursikri Part-I CWR) under Jal Jeevan Mission on semi turnkey basis in Full deposit scheme under the area of EDD-IV KIRAOLI.
Supply of Materials and Erection for Increasing Capacity of 06 Nos. T/F installed at 33/11 KV S/s Chilbila, Aaaspurdevsara, Kunda Tahsil, Bahorikpur, Sangramgarh and Hathigava Distt. Pratapgarh in Business Plan 2025-26 on Semi Turnkey Basis under EDC
Work of replacement of dilapidated breaker panel installed under Mukhlis Hansar Industrial Area under EE EDD KLD and work of installation of CTPT Combine Unit at 04 places for double metering on 4 Nos. 11kV electricity consumers on semi turnkey basis
Construction of 33/11 KV, 2X10 MVA, GIS Sub-station (indoor type) along with associated 33 KV and 11 KV underground lines on turnkey basis in Nagwa area of Varanasi city under IPDS Scheme for Purvanchal Vidyut Vitaran Nigam Limited. Varanasi
TENDER FOR THE WORK OF ESTABLISHMENT OF A NEW MODERN MECHANIZED DHOBI GHAT FOR LAUNDRY SERVICES AT BURI KA NAGLA, DAYAL BAGH, AGRA,UTTAR PRADESHON TURNKEY BASIS AND THEREAFTERMAINTENANCE OF THE PLANT DURING DEFECTS LIABILITY PERIOD OF 12 MONTHS AFTER
Work of second point installation of distribution transformers of various capacities 25 KVA, 63 KVA, 100 KVA, and 250 KVA in Business Plan for the year 2026-27 under the Electricity Distribution Division- Phaphamau, Prayagraj on a semi-Turnkey basis.
Strengthening of LT Lines (Replacement of damage wires/AB Cables and Poles, guarding and earthing fencing of plinth, construction of New Plinth and Repair of damage plinth) under the jurisdiction of EUDC-MBD on Semi-turnkey basis under B.P. 2026-27
For Erection, Commissioning and charging on load of 990 KVA Package type T/F and 630 KVA trolly transformers and construction of plinth for CSS transformers on Semi-turnkey basis and providing electricity connection on LT at various points on demand
WORK OF REPLACEMENT/REPAIR ON TURNKEY BASIS OF FAULTY PARTS OF CAPACITOR BANK ALONG WITH ASSOCIATED EQUIPMENTS TO MAKE WHOLE OF THE CAPACITOR BANK SYSTEM OPERATIONAL INSTALLED AT 33/11 KV SUB-STATIONS IN THE AREA OF PUVVNL INCLUDING ANNUAL MAINTENANC
Construction of 33/11 KV, 2X10 MVA, GIS Sub-station (indoor type) along with associated 33 KV and 11 KV underground lines on turnkey basis in Nagwa area of Varanasi city under IPDS Scheme for Purvanchal VidyutVitaran Nigam Limited. Varanasi
WORK OF REPLACEMENT/REPAIR ON TURNKEY BASIS OF FAULTY PARTS OF CAPACITOR BANK ALONG WITH ASSOCIATED EQUIPMENTS TO MAKE WHOLE OF THE CAPACITOR BANK SYSTEM OPERATIONAL INSTALLED AT 33/11 KV SUB-STATIONS IN THE AREA OF PVVNL INCLUDING ANNUAL MAINTENANCE
Supply of 11 KV 3x120 sq.mm. AB Cable for construction of New 33 KV Substations and Augmentation of existing 33 KV Substations on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of India
Supply of 110 Nos. 5 MVA Power transformers required for Construction of New 33KV Substations and for augmentation of 33 KV Substations on partial turnkey basis in the area of PVVNL under IPDS and DDUGJY scheme of Government of INDIA
All work to be done underground by cable to the existing 33 K.V., 11 KV and LT lines from Dharmashala Taxi Stand (Bridge) to Mohaddipur Chawk and necessary work for provisional power supply system on Turnkey Basis Year 2018-19
All work to be done underground (4.0 Km. Approximate) by cable to the existing H.T. and L.T. lines from Maheshra Bridge to V-Mart Rajendra Nagar, Gorakhpur and necessary work for provisional power supply system on Turnkey Basis Year 2018-19
Custom Bid for Services - Increasing capacity of 100 KVA to 250 KVA Distribution Transformers on Semi Turnkey basis in Business Plan 2026-27 under the area of Electricity Distribution Division, Saifai Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Increasing capacity of 100 KVA to 250 KVA Distribution Transformers on Semi Turnkey basis in Business Plan 2026-27 under the area of Electricity Distribution Division, Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Providing and Fixing MATH LAB AT GOVT ASHRAM SHALA AT MAREGAO TQ SINDHEVAHI AS PER GIVEN SPECIFICATION, Providing and Fixing MATH LAB AT GOVT ASHRAM SHALA AT BORDA TQ CHANDRAPUR AS PER GIVEN SPECIFICATION, Providing and Fixing MATH LAB AT GOVT ASHRAM SHALA AT DEVADA TQ RAJURA AS PER GIVEN SPECIFICATION, Providing and Fixing MATH LAB AT GOVT ASHRAM SHALA AT PATAN TQ JIVATI AS PER GIVEN SPECIFICATION, Providing and Fixing MATH LAB AT GOVT ASHRAM SHALA AT JIVATI TQ JIVATI AS PER GIVEN SPECIFICATION, Providing and Fixing MATH LAB AT GOVT ASHRAM SHALA AT CHANDANKHEDA TQ BHADRAVATI AS PER GIVEN SPECIFICATION, All in One PC (V2) (Q2), Computer Printer (V2) (Q2), Multifunction Printer (Print, Scan, Copy) (Q2)
Preventive maintenance of medium capacity 160 KVA 1000 KVA Distribution Transformers on site under Varanasi Zone
The work for construction of U/G 11 KV line for Bifurcation of 11 KV Ganeshpur Feeder emanting from 33/11 KV S/S Tarna in the area of UEDD-V Varanasi, Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
The work for 630 KVA T/F Ambiya Mandi Dismantling of plinth and erection of four pole and installing of 630 KVA T/F on four Pole in the area of UEDD-III, Varanasi under EE, UEDD-III, Varanasi in deposit work on semi turn key basis
The work for construction of U/G 11 KV line for Bifurcation of 11 KV Aktha Feeder emitting from 33/11 KV S/S Daulatpur in the area of UEDD-VI Varanasi Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
1. Integrated works of Pedestrian path 2. Last mile connectivity 3. Vehicular road development 4. Tourist Information Centre 5. Tourist interpretation Centre cum library and two level parking
1. Kukattha Riverfront Development 2. Upgradation of Rahi Pathik Niwas and Tourist Information Facility 3. Upgradation of Food Plaza, Toilet block, parking and construction of foot over bridge on Hirnyavati 4. Rehabilitation of Vipassana Kendra
As per Bid Doc. No. CS-9551/8003-001-2
Construction of 84 nos. T-III S7, 28 nos. T-IV S7 and 28 nos. T-V S7 Quarters including internal EI and fans Fire Fighting Fire Alarm System and Development Work at AIIMS RaeBareli UP on EPC. SH-Hiring of Inspection vehicle ( Ch to work Contingencies)
Custom Bid for Services - Increasing capacity of distribution transformers and installation of new distribution transformers on Semi-Turnkey basis in Business Plan 2026- 27 under the area of EDD, Lakhanpur, Agra Similar Category Repair and Overhauling Service Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Increasing capacity of distribution transformers and installation of new distribution transformers on Semi-Turnkey basis in Business Plan 2026- 27 under the area of EDD, Kheragarh, Agra Similar Category Repair and Overhauling Service Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Increasing capacity of distribution transformers and installation of new distribution transformers on Semi-Turnkey basis in Business Plan 2026- 27 under the area of EDD, Sikandra, Agra Similar Category Repair and Overhauling Service Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
220 KV Underground XLPE Cable Line Works on Turnkey basis
Refer to Tender Description
Construction work of additional and new LT on distribution transformers installed at 7 places in 7 places in EDD KLD Near Paras Hospital, Gola Bazar, Janta Marg, Kasaela Bakri Mandi, Janta Marg, Gandhi Nagar, Sunder Nagar on semi-turnkey basis ( 20 c
Supply of Materials and Erection for Increasing Capacity of 33/11 KV S/S Dahi (1x5 to 1x10 MVA) and Hathigan (2x5 to 10 Plus 5 MVA) Distt. Prayagraj in Business Plan 2024-25 on Semi Turnkey Basis under EDC-I Prayagraj
CONSTRUCTION OF NEW 33KV LINK LINE FOR 33/11KV AMRA TO 33KV LINE BETABAR TAPPING POINT OF DUO TO OVERLOADED 33KV KARSADA FEEDER VARANASI AND INCREASING CAPACITY OF 33/11KV S/S PARSANI FROM (1X5MVA) TO (2X5MVA), DIST.-GHAZIPUR ON SEMI TURNKEY BASIS.
On Semi-Turnkey basis, the work of making new independent 11 KV power sub-station fed from 33/11 KV Jakkhini for smooth power supply to 500 KV power connection of M/s Govardhan Foundation Biogas Plant village Shahanshahpur development block-Araji lin
SITC of 60 MT LWB by upgradation of existing 40 MT to 60MT fully Electronic Lorry Weighbridge without cabin at FCI, FSD Atarra under DO Banda inclusive of 2 years guarantee and 3 years CAMC including Civil Electrical works on turnkey basis etc.