Loading…
Loading…
1,855 results • Best match
Laying Jointing and testing of Gravity main 65mm dia (M) by cutting welding of GI pipe at various RDs C/O RCC Anchor Blocks 7 Nos Laying joiting and testing of Gravity main 65mm dia 300 Rmt 50mm dia 250 Rmt and C/o Head weir at Kasan Khad
Brick Sub CL B, Cement for palstering, LED bulb 8 W, Aggregate 20mm, Sand, GI Elbow 15mm, GI Male Female Stopper 15mm, GI Male Female Stopper 20mm, GI Tank Nipple 15mm dia, GI Tank Nipple 20mm dia, Bakelite sheets 8 inch into 5 inch, PVC connection ... 15mm, PVC Pipe 100mm ... 300mm, GI Pipe 15mm ... long, GI Pipe 20mm ... Black HDPE Pipe 8 ... inch, PVC Pipe 75mm ... 110mm PVC Pipe for ...
Excavation for gate posts, MS pipe gate posts 4 inch 4 inch, Cement concrete for embedding posts, Fabrication and installation of MS Iron Gate 20 feet 15 feet, ACP sheet covering on exposed portions, Anti corrosive primer and two coats of paint, Labour Work
CO of RCC Trench weir at Rokti Nalah CO Wire crate protection wall along the right bank of Rokti KhadRD 9 to 54 Laying, Jointing in trenches and Testing of HDPE Pipe 90mm Nominal dia 2 layers at RD 9 to 460 Jacketing of Sedimentation tank an
CO Retaining wall to protect the MCS 450 mm dia of Phase-II at RD 1120, Repair of existing HDPE pipe network in various schemes under BVMIP LB Sundernagar and leveling of trench of MCS Phase-II eroded due to heavy run off flood. PDNA No. 5483
SH C o 5 No Main and 22 Nos Distribution RCC Chamber C o 2 No Storage Tank 60000 and 35000 Ltr Capacity Trenching laying and jointing of HDPE Pipe 180mm Dia 577 Rmt 140mm Dia 1720 Rmt 90mm Dia 1810 Rmt and 75mm Dia 410 Rmt
CO Retaining wall to protect the MCS 900 mm dia near bhon Badi, repair of HDPE pipe network due to land settlement and heavy rain-flood in Phase-II and leveling of trench of MCS Phase-I eroded due to heavy rain -flood . PDNA No- 5481
SH Laying jointing testing and commissioning of HDPE Pipe in distribution system of 160mm dia PE 80 PN 4 Construction of MDT and out Lets of pump house for Tube well 1 Damowal 2 Kunjhal Muslim Basti 3 Satiwala 4 Surajpur 5 Mandhala Upper 6 Bhatouli K
SH P F MS Tank 270 Ltrs Providing Laying Jointing Testing of HDPE pipe of various dia C o storage tank 10000 Ltrs capacity C o barbed wire fencing around the tank C o protection wall with wire crate and C o 2 Nos stand post
Laying, Jointing and testing of GMS pipe (Medium Class) of various dia in Gravity Mains, HDPE pipe, grade PE-80 PN 4.00, of various dia, C/O RCC Delivery Tank of various capacity and C/O Outlet Chamber in Distribution System for RWHS-1 Job 1
CO RCC Manhole Chamber from Gard Nallah to STP RKP Bari Road RD 0 to 323.80 19 Nos and from Chauhan house to STP RKP RD 366.30 to 711.90 12 Nos Total 31 Nos and laying Jointing and Testing of DI pipe 200mm dia 60 Rmt and 150mm dia 50 R
C/o RCC Pillars 17 Nos C/O RCC platform C/O RCC Manhole Chamber 3 Nos C/o retaianing wall to protect the main sewer line 50 Rmt and Laying DI pipe 400mm dia K7 60.50 Rmt and 300mm dia 21 Rmt on pillar near Agriculture Office at Khaliyar
180 mm 842 Rmt HIMCAD Providing CAD
.
.
.
.
SH C o intake chamber Providing laying jointing of HDPE pipe of various dia Co storage tank c o barbed wire fencing around the storage tank C o barbed wire fencing around the storage tank C o nallah crossing C o public stand post 3 Nos C o prote
C/O sump well 5000 ltrs cap pump house, RCC delivery tank, laying and jointing of distribution system in HDPE pipe of various dia, C/O RCC outlet/ BP tank, prov laying and jointing of rising main for booster and main stage 125mm dia and S/E of centri
C/O Head Weir C/O Field Out Lets18 Nos C/O R/Wall C/O Chamber for protection of Hydrents 29 Nos C/O Delivery tanks 3 Nos and Laying Jointing and testing of HDPE pipe of various dia in distribution systems and Laying Jointing Testing of Rmain
Floor Tiles 2x2, Wall Tiles 7x4, Marble 9x3, Bricks, Cement, Wooden Door with Mesh Door, Exhaust Fan Big, Wire 2 pt 5mm, Wire 1 pt 5mm, Holder and Bulb, PVC pipe, Board 15 Amp with switch and Socket, Board 5 Amp with Switch and Socket
Tender for Petty repair of various components of Holi HEP i e PF of trash rack pannels on Trench weir at Intake welding of Ms pipe joints removal of silt from Power channel and Forebay and PF of RCC slippers on channel of water conductor system
Balance work of Agreement No 520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 300 mm dia 737 Rmt 250 mm dia 200 Rmt C/O Manhole Chamber 37 Nos C/O RCC Pillar 25 Nos C/O Platform 20 Nos C/O RCC Retaining Wall
Balance work of Agreement No 520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 200 mm dia 500 Rmt 150 mm dia 1000 Rmt C/O Manhole Chamber 38 Nos C/O RCC Pillar 15 Nos C/O Platform 20 Nos C/O RCC Retaining Wall
Nallah Source Intake Tank 1No. Sector Storage tank at Point 6 30000 Ltr Cap., Laying Jointing Testing of GI pipe 40 mm dia at RD 0 to 6500 Rmt., 20 mm dia. 300 Rmt. from RD 1A to1G, 20 mm dia 600 Rmt, RD 4 to RD 4E, 20 mm dia 700 Rmt
SH CO RCC Intake Chamber 2 Nos RCC Storage tank 25000 Ltr cap 1 No RCC Storage Tank 20000 Ltrs cap 1 No RCC Storage Tank 15000 ltr cap 1 No RCC Storage Tank 10000 Ltrs Cap 2 Nos Excavation laying jointing and testing of GI pipe of 40 mm dia 4500 Rm
Excavation laying jointing and testing of GI pipe 100 mm dia in main distribution line Phase 1st at RD 7060 0 to 7060 1340 1340 Rmt and Phase 2nd at RD 7510 0 to 7510 1770 1770 Rmt Total 3110 Rmt C O RCC Inlet Outlet 4 Nos CO Pucca Field Channel
SH Dismentalling of old GI pipe 32 mm dia 400 Rmt 25 mm dia 300 Rmt 20 mm dia 3800 Rmt 15 mm dia 450 Rmt. and Laying jointing testing and carriage of Gravity Main distribution system G.I. pipe 40 mm dia 600 Rmt 32 mm dia 3600 Rmt 25 mm dia 6600
CO Wire Crate Diversion Weir, Pattra cutting, LJT of HDPE Pipe 200mm OD dia at RD 0 to 1070 and 110 mm OD dia, CO 9 Nos RCC InltetOutlet chamber, CO Retaning Wall in R.R. Masonry CM 16 at RD 130 to 140, RD 175 to 187 RD 225 to 240
Laying, jointing, testing and carriage of HDPE Pipe of 110 mm dia in distribution system form node MDT1-OL1 65 Rmt, 90mm dia node OL26-OL27 115 Rmt and 63 mm dia node OL1-BPT1 70 Rmt, BPT1-BP2 70 Rmt, BP2-OL33 60 Rmt, OL1-OL25 110 Rmt OL25-OL26
Provision for design of distribution network, C/O Zink aluminium storage tank of capacity 150 KL 1 No 100 KL 3 Nos 50 KL1 No 30 KL 1 No Laying jointing testing of HDPE pipe 140mm dia 3480 Rmt 125 mm dia 2250 Rmt, C/O chamber for sluice valve 19
Conventional Lightning Arrestor, Multi Stranded 75 Sq mm Copper Wire, Frangible Fibre Reinforced Plastic Poles, Concrete Base for Erecting FRP Poles, Brazing Points, Installation Work, Copper Plate, Copper Strip, Brazing of interconnection, PVC pipe for earth pits, Salt, Charcol, Inspection chamber, Installation work of Earthing Pit
Conventional Lightning Arrestor, Multi Stranded 75 Sq mm Copper Wire, Frangible Fibre Reinforced Plastic Poles, Concrete Base for Erecting FRP Poles, Brazing Points, Installation Work, Copper Plate, Copper Strip, Brazing of interconnection, PVC pipe for earth pits, Salt, Charcol, Inspection chamber, Installation work of Earthing Pit
Handling, Transport and Other Mining Services - Percentage quote based - Transportation laying and fitting 6 X 6 mtr PVC Pipe from 84L Dam to 96L 6X for installation of 500 GPM 6 stage pumps at 96L 6X and Transporting of Motor pump set 500 GPM to 96 ..
Steel Tubes, Tubulars and Other Steel Fittings as per IS 1239 (Part 2 - Steel Pipe Fittings) (Q3), Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) as per IS: 1703 (Q4), Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 (Q3), Metal Alloy Casting Water Tap with Aerator (V2) (Q3)
SH Repair Of damaged portion of Main Canal RD 13175 to 13319 144 mtrs Aquaduct at RD 16325 to 16355 30 mtrs. SM-1 RD 9195 200.00 mtrs on pedesta) and 150.00 mtrs. on ground ,ML-1 at Rd 12120 228.00 mtrs. on ground and HDPE pipe PE80 class PN-6 LBC
Balance work of Agreement No.520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 300 mm dia 365 Rmt 250 mm dia 100 Rmt 200 mm dia 250 Rmt and 150 mm dia 700 Rmt C/O Manhole Chamber 37 Nos C/O RCC Pillar 20 Nos C/O Pl
Balance work of Agreement No 520 for the year 2020 21 Laying Jointing and Testing of DI Pipe in sewer network 300 mm dia 365 Rmt 250 mm dia 100 Rmt 200 mm dia 250 Rmt and 150 mm dia 300 Rmt C/O Manhole Chamber 37 Nos C/O RCC Pillar 20 Nos C/O Pl
system, Providing and laying of rising main 150mm dia and S/E of pumping machinery Centrifugal for booster stage 1st stage)
SH C O RCC Intake Chamber 2 Nos RCC Storage Tank 10000 ltr cap 4 Nos Excavation laying jointing and testing of GI pipe of 40 mm dia 6000 Rmt from Node No 1A 17 25 mm dia 3200 Rmt from Node No 1A 2 and 17 24 Providing FHTC to 439 No Households of GP
Laying Jointing and testing of GI pipe line from B13 B14 at RD 0 to 600 600 Rmt B B1 Rd 0 to 500 500 Rmt B1B2 RD 500 to 800 300 Rmt Total 1400 Rmt 25 mm dia and B14 B15 RD 600 to 1100 500 Rmt B2 B3 800 to 1200 400 Total 900 Rmt 20 mm
attendant quarter, RCC sump well/delivery tank, Storage tank 175000 ltrs. Cap.C/O outlets/B.P. tanks 15 Nos. laying and jointing of feeder line, Prov. and laying of Rising Main 150mm dia and Supply and errection of pumping machinery with allied acce
.
SH C o Patru cutting from RD 0 to 60, Laying, jointing testing of HDPE pipe from RD 30 to 2130, outlet chamber 17 Nos, crate work at head wier from RD 0 to 15, edge wall at RD 15 to 85 60 mtr., Retaining wall at RD 15 to 25, RD 44 to 54, RD 110 to 1
Construction of RCC Main Kuhl at RD 0 to 350 350 Rmt Desilting tank 1 No Providing laying and jointing of HDPE Pipe 355 mm dia at RD 350 to 2200 1850 Rmt C o Nallah Crossing 2 Nos and RCC Kuhl at RD 3200 to 3400 200 Rmt 4400 to 4600 200 Total 600 Rmt
Patra cutting at RD 2500 to 3700Rmt 1200 Rmt P L and Jointing of HDPE pipe 355 mm dia at RD 2500 to 3700 1200 Rmt Anchor Blocks 7 No R walls at RD 2540 to 2600 3080 to 3150 3370 to 3420, C o BP Tank 1 No and C O Escape Drain Point 2 No
Providing Laying jointing Testing of HDPE Pipe from (DT cum to OL 1, OL 1 to OL 2 , OL 2 to OL 3 OL 3 to OL4, OL 4 to OL5 , OL 3 to OL6 ,OL 6 to OL 7, DTCUM to OL 8 , OL 8 to /L 9 OL 9 to OL10, OL 10 to OL11 , DTCU
Laying Jointing and testing of GI pipe line from B B23 at RD 0 to 750 750 Rmt 40 mm dia B23 24 750 to 900 150 Rmt and B25 B38 RD 0 to 400 400 Rmt Total 550 Rmt 32 mm dia B24 B25 RD 900 to 1100 200 Rmt B B27 RD 0 to 650 650 Rmt and
PPR Elbow 32 mm, PPR Tee 32mm, PPR Gate Valve 32 mm, PPR Pipe 32 mm 10 Feet Long, PPR Socket 32 mm, PPR Reducer 32 to 25 mm, Checkered Tiles, GI Pipe 50mm, GI Elbow, GI Socket 50 mm, Gi Union, Water Storage Tank 5000 Ltr, White Paint, Green Paint, Red Paint, Terracotta, Yellow Paint, Blue Paint, Olive Paint