Loading…
Loading…
2,508 results • Best match
Civil and Electrical Items Works
The work includes rectified ceramic glazed floor tiles CC Iron profile roof sheet single Tubular steel soak pit SS railing Hard drawn steel wire fabric etc
(REACH- Bhelunta Right minor head Extention and Between 0.000 KM to 1.200 KM And Bhelunta Left minor Between 0.300 KM to 1.200 KM ) JOB -01
Work for renovation of Yard of 33/11 KV S/s Jaspur Town under EDSD First at EDD Jaspur
Block Jakholi District Rudraprayag ( Longa Minor)
Kulava No. 11,13,14
JAKHOLI BLOCK DISTRRICT RUDRAPRAYAG DHANKURALI
Repair work
civil and Electrical works Items
Renovation of room in building E-22 and E-23 (IInd floor) and E-26 (IV floor) at OLF Dehradun.
QUOTATION FOR STAR RATES AGAIST CA NO CE (FY)HYDKAN09 OF 2018 19 RENOVATION OF E 24 BUILDING AT OLF DEHRADUN
Block Jakholi District Rudraprayag ( Nagdhar Kot Minor)
REACH Bharpoor minor In BW 0.400 KM to 1.000 KM and Sera minor at head in B.W. 0.000 KM to 1.500 KM ) JOB -03
The work includes Wall tiles, Granite stone, G I metal false ceiling, Spirit polish and Interior painting etc
Block Jakholi District Rudraprayag ( Panjana Minor)
AS PER TENDER DOC
Civil and Electricals Items Works
Block Jakholi District Rudraprayag Mawan Gaon
RENOVATOIN OF TOILET AT NPG, MADC AT SOI, HBE, DEHRADUN Subwork/Packages: RENOVATION OF TOILET AT NPG, MADC AT SOI, HBE DEHRADUN
BINKHOLI AND PINGLO
KHUMATIYA AND BAYALISERA
KANSYARI AND BHENTA
(REACH-Ghatkoli minor At head and In B/W 0.000 Km. to 2.000 KM and In Gugda minor At head and In B/W 0.000 KM -0.400 KM ) JOB -04
GST @ 18%
Demolishing existing slab/roof and casting of new slab/roof and renovation of control room building at 132 KV Substation IDPL Rishikesh ,Dehradun
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Borbalara under Capital (C.M. Ghosna No. 1675/2021)
Repairing and Renovation/Construction of HT/LT line and Sub-Station for electrification of village-Kuwari under Capital (C.M. Ghosna No. 1675/2021)
Kulava No. 01,03,04
Civil and Electrical Items works
The work includes aluminum work, pre-laminated particle board, internal painting, water supply and PVC panel work etc
To Providing Complete electrical Installation Cabling wiring light point switches sockets Power Points UPS Points internet telephone points LED fittings and BLDC ceiling fans Etc. as required by Indenter.
The work includes Kota stone flooring plaster painting brick work Aluminium work etc
Renovation of 5 kW Off Grid Solar PV Power Plants at various places of Distt. Pithoragarh including 05 years Warrantee and Comprehensive Annual Maintenance Contract
Replacement of Battery Bank and Renovation of Control Room at 33/11 KV S/s Sector-03 and Secotor-04, SIDCUL under EDD-I, Rudrapur
RENOVATOIN OF 06 NOS TYPE-V QTRS LICTHIBAGHCOLONY AT IGNFA DEHRADUN Subwork/Packages: RENOVATION OF 06 NOS TYPE-V QTRS LITCHIBAGH COLONY AT IFNFA DEHRADUN
Work of Renovation of 33 KV Yard and Dewatering arrangement at 33/11 KV S/s Sector-02, SIDCUL, Pantnagar under Electricity Distribution Division, Rudrapur-I
Civil and Electrical works
Tender Documents for Renovation, Repairing and Maintenance of 33 KV Breakers and CR Panels at 33/11 KV Substation Matkota of EDD Rudrapur First under ETD Rudrapur.
Increasing capacity of 33/11 KV S/s Bara from 1x8 MVA to 2x8 MVA and renovation and Reconstruction work in existing yard under Electricity Distribution Division, Sitarganj
The work includes replacement of existing floor with vitrified floor tiles providing metal false ceiling powder coated aluminium work for cabin work station and cup board brickwork PCC Works Plastering works Dismantling works painting works etc
Hiring of Architectural Design Consultant for Comprehensive Renovation Interior Up gradation of Main Conference Room Reception allied area Centralized Well Planning Section at Institute of Drilling Technology IDT ONGC Dehradun
REPAIRL RENOVATION OF SPORTS COMPLEX OF 2 VIKAS, 5 VIKAS SFF ACADEMY, DET C KALSI AND SAHIYA OF EST 22 AT AGE B/R (P) CHAKRATA UNDER GE (P) DEHRADUN
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Repair, and Installation of Plant/Systems/Equipments renovation, Partitioning, Modular Workstations with Cabinets, False Ceiling, and Floor T..
AS PER TENDER DOC
(BOM OF LAPTOP AND PROJECTOR SETUP AS PER OUR REQUIREMENT) (Q3), (BOM FOR PACKAGE-1 AS PER NITI AYOG GUIDELINES) (Q3), (BOM OF REFURBISHMENT OF LAB AS PER OUR REQUIREMENT) (Q3), (BOM FOR PACKAGE-2 AS PER NITI AYOG GUIDELINES) (Q3), (BOM OF YEARLY TRAINING AND CONSUMABLE LAB AS PER OUR REQUIREMENT) (Q3), (BOM FOR PACKAGE-3 AS PER NITI AYOG GUIDELINES) (Q3), (BOM FOR PACKAGE-4 AS PER NITI AYOG GUIDELINES) (Q3), BOM OF ADVANCED PROTOTYPING TOOL (Q3)
RENOVATION OF EXISTING TOILETS AND SEWAGE LINE UBAN AUDITORIUM AND NEW WIRING IN ALL 12 QTRS AT LOWER LINE SFF ACADEMY AT AGE B/R (P) CHAKARATA UNDER GE (P) DEHRADUN
Civil and Electrical Items work
Work of Renovation of 33 KV Yard, increasing height of structure, power tranformer plinth etc at 33/11 KV S/s Danpur under EDSD Rudrapur-II under Electricity Distribution Division, Rudrapur-II
Establishment Renovation of Tissue Culture plant Growth Harding Facility with prefabricated room cabin for seed germplasm centre at HAPPRC, HNB Garhwal University Srinagar Garhwal to enhance the production of QPM of important MAPs
Naldhura Minor 0.00 to 1.00 km.main minor and Gule 0.00 to 0.200 km.