Loading…
Loading…
179 results • Best match
Repair and maintenance of LT panels installed at khasiamangal campus near 100 KVA 250 KVA Transformers Generator room pump house officer mess 120 Men barrack of SHQ BSF Teliamura
Repairing of HT cable from GO switch near mandir to transformer no. 02 near magazine building campus SHQ BSF Teliamura
Repairing of HT cable from GO switch near mandir to transformer No. 02 near magazine building campus SHQ BSF Teliamura
Construction of base for 200 KVA Transformer at B C Manu Model Farm under Bagafa Agri Sub Div South Tripura
Repair and maintenance of 250 KVA defective Transformer installed at BSF campus of 80 BN BSF under SHQ BSF Teliamura
Refer to NIT
Construction of 20x63 KVA Substation incl. 1 km HT Line and 1 km LT line for segregation of DWS schemes distribution transformers from public connections within the jurisdiction of ED-Kamalpur
REPAIR AND MAINTENANCE OF 250 KVA TRANSFORMER INSTALLED NEAR GENRATOR ROOM AT BN HQ 169 BN BSF UNDER SHQ BSF UDAIPUR.
Arrangement of incoming power supply at Ujjayanta Palace, Agartala by providing transformer and allied electrics in EPC mode including Defects Liability Period of three years,
Extension of HT LT line with installation of Transformer for providing service connection at different area under the jurisdiction of ESD Jubarajnagar
Extension of HT line at Amjadnagar of 1(one) Nos 1x100KVA Transformer from Dedicated BSF feeder to Sonaichari Feeder under ESD-Belonia
Repair and Maintenance of Overhead Electrical lines of distribution system of Transformer near gate no 1 at campus of SHQ BSF Gokulnagar
Providing 3ph service connection to newly constructed DTW pump and Innovative pumpwith installation of transformer and HT line extension under ED Dharmanagar
Strengthening of LT cable between transformer LT panel side to internal LT panel side of LOK BHAVAN Agartala Tripura Providing EI thereof
Extension of HT line IC 100KVA Transformer for providing service connection to National Law University, Tripura at Old TIT Campus under ESD Durjoynagar
Construction of Stair from Multipurpose Hall towards quarter complex and RCC transformer base at Multipurpose Hall premises, New Capital Complex, Agartala,West Tripura
Repair and maintenance of defective switchgear in electrical distribution panels associated with Transformer and Generator of 104 Bn BSF under SHQ BSF Teliamura
As per NIT
Constructions of Cover drain from Sridam Barman house to electric transformer at ward no O2 under Melaghar Municipal Council during the year 2023 24
Construction of Transformer Base in the premises of Electric Crematorium at ward No.17 under Kailashahar Municipal Council for the year of 2025 26
Extension of HT line I/C 100 KVA Transformer for providing service connection to National Law University, Tripura at Old TIT Campus under ESD Durjoynagar
Extension of HT/LT line including installation of 13x25 KVA distribution transformers for providing 405 nos 1-phase service connections to un-electrified PVTG Reang household under PM- JANMAN scheme within the jurisdiction of ESD-Mungiakami.
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at Dhalai and Khowai Districts under DDUGJY Phase- II (2nd Call)
Extension of HT line to 200KVA Transformer for providing service connection to Assistant Director, SIB, MHA, Govt. of India under CPWD at Salbagan under ESD Durjoynagar
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at North Tripura and Unakoti Districts under DDUGJY Phase- II (2nd Call)
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at Gomati and South Tripura Districts under DDUGJY Phase- II (2nd Call)
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at West Tripura and Sipahijala Districts under DDUGJY Phase- II (2nd Call)
Proposed Construction of MLA Hostel at Capital Complex, Agartala, West Tripura / SH- Construction of Transformer Base (size 9.850mx 5.00m) including peripheral hard drawn fencing (15.00m x 7.50m).
Maintenance of existing old building including construction of Boundary wall and other provisions for the preparation of Transformer repairing workshop and requirement of materials including installation and commissioning
Additional work of tertiary centre like back side protection Retaining wall, Over Head Tankl, Under Ground tank, Transformer Base and rest boundary wall in sunamuki, Kailashahar, Unakoti Tripura
HV porcelain Bushing with Gasket Metal part and Oil seal, PT 100 Sensor for OTI WTI, Digital WTI OTI Meter 2243A, LV epoxy supporting insulator 1 1kV, Complete set of gasket oil seal for HV LV bushing, Complete gasket set for 0 75 MVA, Silica gel Breather for 1 5 MVA, Silica gel Breather for 0 75 MVA, 33 kV Epoxy Supporting Insulator, Buchholz Relay
Installation of all transformer gate Installation of shed at various Electronic device motors Repairing of Plant boundary fencing and Painting of Chromatograph at Plant of TGBPS NEEPCO Ltd Monarchak
As per Bid Document
Replacement of damaged components of HT and LT line materials viz. 11 KV outdoor Heat shrink type End terminal, Jointing Kit suitable for XLPE insulated cable of grade 11 KV , 3 core ,185/240/300 Sq. mm size for Distribution Transformers, Circuit Br
By pass circuit between direct transformer from LT side to stage lighting circuit with control gears for smooth functioning of Outdoor program of LOK BHAVAN Agartala Tripura Providing EI thereof
Pvdg 3ph service connection to newly constructed DTW pump and innovative scheme at different locations with installation of 4 nos 11/0.433 KV, 1X63 KVA Transformer and HT/LT line extension under ED-Dharmanagar.
As per Bid Document
Pvdg 3ph service connection to newly constructed DTW pump and innovative scheme at different locations with installation of 4 nos 11/0.433 KV, 1X63 KVA Transformer and HT/LT line extension under ED-Dharmanagar (part II).
As per Bid Document
Maintenance of Road from PWD road (near transformer) to Chowdhury para via Sambhu bardhan House during the year 2024-25/ SH WBM-III, Patch Soling, Carprting etc ( L-400.00 mtr)/Gr-I(Ch. 0.00 to 400.00 mtr)
Maintenance of Road from PWD road (near transformer) to Chowdhury para via Sambhu bardhan House during the year 2024-25/ SH WBM-III, Patch Soling, Carprting etc ( L-400.00 mtr)/Gr-II(Ch. 400.00 to 800.00 mtr)
Shifting of electrical poles, Transformer sub-stations, HT(11KV)/LT line etc./ shifting of utilities lines falling in the newly constructing RCC covered drain / proposed alignment for RCC covered drain with the approch road NH8 right side
Installation of 2X63KVA Transformer inc extension of HTLT line by UG cable for providing 3Phase service connection to the DTW scheme at Karaimura under ESD III, Bordowali and Adarshapara under ESD Amtali under AMRUT Scheme under the jurisdiction of
Providing 3ph service connection to newly constructed DTW Pump and Innovative scheme at different locations with installation of 23 nos 11/0.433 KV, 3X100 KVA,16X63 KVA, 4x25 KVA Transformer and 11 KV HT/LT Line extension under jurisdiction of Elect
Construction of Transformer base along with concrete flooring in front of DG room, front of driver room, wall cladding of entrance gate, UPVC window etc. in the High Court premises under Capital Complex Sub-division-I, Kunjaban Extension during the y
Providing 3ph service connection to newly constructed 21 Nos. DTW Pump and Innovative scheme at different locations with installation of 31 nos 11/0.433 KV, 1x315 KVA, 1x200 KVA, 27X63 KVA, 2x25 KVA Transformer and 11 KV HT/LT Line extension under ju
Maintenance of PWD road from i Kalitola Transformer to Sachindralal, Paschim Charipara end via Tilmora road L-700point00 mtr ii Belabar Kalitola bazar to Palpara Border end road L-800 point 00 mtr under Belabor GP during the year 2024-25 / SH- Patch
Construction of 04nos Transformer base in various places under ED Borowali
automatic line voltage corrector or step type auto transformer Automatic Line Voltage Corrector Or Step Type Auto Transformer ( 4 ) Technical Specifications Specification Specification Name Values Allowed Values Ungrouped GENERIC Conforming to IS:8448 latest Yes - Rating in KVA 4.0 KVA 0.5 KVA, 1.0 KVA, 2.0 KVA, 3.0 KVA, 4.0 KVA, 5.0 KVA ISI Marked Yes Yes, No ISI Marked if Yes CM/L No. (If No write NA) confirming to IS: 8448 LATEST - Type of winding Aluminium Copper, Aluminium Input single Phase Sine wave (120V-280v) Single Phase sine wave (160V-260V), single Phase Sine wave (120V-280v) Display Type of Meter Digital Volt Meter analog Volt Meter, Digital Volt Meter CONSTRUCTIONAL Mounting Type Floor mounting - Current rating of the Relay/contactors (Amp) Conforming to IS:8448 latest - Overall weight of ALVC (Kg) 5 - Provision of power Yes - 1/3 supply cord/terminal as applicable for input and output as per IS:8448 FUNCTIONAL Output Single Phase sine wave (210V-250V) - Overall efficiency of ALVC (%) >/= 95% - The product shall conform to the acceptance tests as per Cl. 12.1.1 of IS:8448 latest Yes - CERTIFICATIONS Availability of Type Test Report from Central Govt. NABL/ILAC Accredited lab to prove conformity to the Specification IS:8448 latest Yes - Type Test report No. REGD. OFFICE 42/962 - TTC report date 3/2/17 - Name of Lab V Gaurd Industries ltd - Address of Lab Vennala High School Road, Vennala, Kochi - 682028, * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Nehal Gupta 799012, 182 Military Hospital, Agartala C/o 99 APO 4 15 EMD Required No ePBG Required No
Providing power supply with 2x200 kVA Transformers with Double feeder facility at Tripura Sports School DDSSC Complex Badharghat Agartala under ESD-III Bardowali