Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
608 results • Latest
Conducting Mandatory Energy Audit by BEE Empaneled Accredited Energy Auditor/firm for thermal power sector of Ballari TPS Units (2 x 500 MW 1 x 700 MW)
Comprehensive Maintenance Contract of different rating of DG Sets at Ganeshgudi
Routine, Preventive, Breakdown maintenance and AOH of LT Switch gear and Connected Equipments along with ESP Electrical equipments of Unit- 5 to 8, Cleaning of cables, Cable gallery and associated structure pertaining to EE(LT-2)RTPS division for one year
Supply and Replacement of Exide Make 12V 42Ah & 12V 65Ah SMF Batteries for 3 KVA and 5 KVA UPS System
As per bid document
Disconnection of cables, Supply, Laying of various sizes of LT cables along with Supply and commissioning of Dewatering pumps and accessories for cable trenches at Transformer bay
Maintenance of residential & non residential buildings such as office complex, hospital, schools, garage, IB, dormitory etc., Maintenance works including petty repairs, upkeeping of Kargal IB and Dormitory, Maintenance of Gardens and Parks.
Providing resetting of drain at Diesel bunk area and RCC drain outside compound wall at RTPS
Repair/arresting water leakage in penstock filling pipeline of Unit-1 & 2 at Kodasalli Power House
Detail scope of work will be mentioned in Section III of Bid Document.
AMC of AC & Ventilation system of RTPS Green Building for a period of one year- excluding water cooled chiller & VRF air conditioners units.
Providing data entry operator for entering/recording of Check in & Check out of Ash Pond vehicles at RTPS.
Repairs to junction of material gate and employee gate road at BTPS.
Maintenance of Occupational health centre (OHC) at YTPS for a period of two years and further extendable by one more year subject to satisfactory performance of the agency
Testing, rewinding / reconditioning of motors of various ratings ranging upto 55 KW of Unit 1, 2 & 3 of BTPS on rate contract basis for a period of one year
Jungle cutting along silo road adjacent to ash pond area & ash removal from sedimentation/settling tank and desilting of drain from parking area to settling tank area at RTPS for a period of 12 months
Providing rest room to contractor female workers working around auxiliary buildings near Time office and improvement works to steel silo at RTPS
Procurement of Matti Wooden Planks for BM-2 of RTPS
Procurement of Seamless Pipes for CAM-2 of RTPS
Providing PU based grouting for arresting seepage inside the Conveyor Tunnels in CHP area at RTPS
1Supply of Junction Boxes a)Supply of suitable industrial-grade junction boxes as per the technical specifications indicated in the bid document along with complete accessories viz,terminal blocks,Cable glands, mounting rails,ferrules, labels and any other hardware required for mounting/installation of Junction boxes.2.Installation and Mounting of Junction Boxes a)Installation/mounting of junction boxes at the locations identified by the Engineer-in-Charge b)Providing all necessary supports, brackets, fasteners and hardware required for proper installation c)Routing and dressing of cables in an orderly and mechanically protected manner.3.Cable Laying a)Laying of required control/instrumentation cables from the field ESP hopper high-level contact/controllers to the respective field junction boxes b)Further laying of cables from the junction boxes to the PLC system/control room termination points, as required c)Cable laying shall be carried out through existing cable trays, trenches, conduits or other approved routes wherever available d)Any minor routing/support arrangements required for cable laying shall be included in the contractor scope.4.Cable Termination a)Termination of all cables at field devices, junction boxes and PLC-side termination points. b)Termination of all cables at field devices, junction boxes and PLC-side termination points. c)Termination of all cables at field devices, junction boxes and PLC-side termination points.5.Interconnection and Integration a)Interconnection of the ESP hopper high-level contacts with the existing PLC system of Unit 5 &6 AHP. b)Verification of point-to-point wiring and correctness of signals at the PLC. c)Modification/provision of termination arrangements wherever required for successful integration with the existing PLC system.6.Testing and Commissioning a)Continuity, insulation and point-to-point testing of all newly laid cables and wiring. b)Functional testing of each ESP hopper high-level contact from the field up to the PLC system. c)Rectification of any wiring, termination or communication-related defects observed during testing and commissioning.
Maintenance and Assistance to Operation of Pumps for Dust Suppression System of Coal Handling Plant Unit-1 & 2
Routine, Breakdown maintenance and assistance for operation of pumps and compressors of Dust extraction, Dust suppression, Dry fog Dust suppression and Tunnel ventilation system of CHP Unit No 3
The brief scope of the work includes Supply, installation and commissioning of vibration sensor on gearbox and motor of existing IDCT in 1x 370MW YCCPP and integration with BHEL Max DNA DCS system, Supply and laying of cables and conduits, Supply and installation of JBs along with all accessories required for system completion along with to arrange and bear the cost of comprehensive transit insurance for all materials and equipment from the point of dispatch up to delivery at site, covering all risks, losses, or damages. Scope of work given is only indicative. Detailed scope has been described in the bid document which is binding on all the bidders.
Procurement of House hold items for Guest house of RTPS
Periodical Comprehensive Maintenance of CCTV Networking System in Plant and Colony
Comprehensive AMC of one number of 6th block elevator at Supa dam-As per the scope of work mentioned in the tender document.
Providing and fixing of protection cover and maintenance platform for various Components at BP dam and Tattihalla dam- scope of work as per tender document.
Annual civil maintenance of MGHE Power House and other appurtenant structures, Jog for a period of One year (2026-27)
Supply & supervision of dust suppression system at CHP unit-1&2
Periodical Routine Maintenance of Fire Alarm System in Plant and Colony
Supply of Various types of Copper cables, Aluminium cables and Cable jointing materials required for Shiva Hydro Electric Power House, KPCL, Malavalli Taluk-571437, Mandya district, Karnataka
Replacement and strengthening of draft tube cross piece assembly of unit no. 2 at Gerusoppa Power House as detailed in Section-III.
Construction of New Anganwadi building in Badagunda village of Joida Taluk.
Providing anti-termite treatment to the residential and non residential buildings of Kadra colony.
Improvements/Rectification Works to Technical Building at BTPS
Monitoring and verification process for PAT-VII cycle by BEE Empanelled accredited energy auditors as per PAT rules 2012 under energy conservation act 2001.
Operation & Maintenance of 3 MW Solar PV plant at Yapaladinni, Raichur District, Karnataka State for a period of one year.
RTPS-Painting of Hydrant lines, emulsifier lines and Various valves of the firefighting system.
Providing Pavement Concrete for Railway track No.12 at outhaul side of WT- 2 in Marshalling yard area at RTPS
Providing safety walls for open culverts for Bridge No.4 & 5 in Marshalling Yard area at RTPS
Providing Sliding Windows and other improvement works to Switch gear buildings in CHP area at RTPS
Providing RCC wall and Concrete Flooring at JT-6, 7 & 8 in CHP area at RTPS
Providing Water purification (RO) plant and polyethylene water storage tank to Coal Bhavan and CHP Canteen in CHP area at RTPS
Strengthening of Wagon Tippler No.1 & 2 In haul side concrete structures in Marshaling yard area at RTPS
RTPS-Designing, Printing and Fixing of Retro-Reflective Safety signage boards, Various policy boards and major equipment naming boards on ACP sheet of 3mm and installation at various locations of Plant.
Supply and Replacement of Side Beam Pads of Wagon Tipplers Unit-1&2 CHP BTPS
Detailed Scope of work is mentioned in bid document
Periodical assistance for the various works of warehouse no 1,2,3, C-go down, diesel bunk, scrap yard ,CPRI, BHEL Stores building and other storage area for a period of 12 months
Construction of School class rooms at various villages of Nanjungud Taluk under phase-3 at Varuna Constituency under CSR Scheme.