Loading…
Loading…
1,419 results • Latest
"S&T work in connetion with "Proposal for construction of Road over Bridge in lieu of LC No.- 03 at KM: 09/15-16 between Ramganj Mandi and Julmi station of RMA- JLWC section."
Zonal DSTE/MAQ Section: Annual Zonal Contract for S&T gears under the jurisdiction of DSTE/MAQ in Palakkad Division for a period of one year (2026-2027)
Zonal ADSTE CLT Section: Annual Zonal Contract for S&T gears under the jurisdiction of ADSTE/CLT in Palakkad Division for a period of one year (2026-2027)
Provision of Trap/derailing switch to enable stabling on long haul loop line at Thuria, Laban, Chhoti Udai & Piloda stations.
Annual Repair Contract (ARC) of Primary Digital Drop Insert Multiplexer Cards of M/s Webfil Make in Nanded Division for a Period of Two Years (Inclusive of Spare Parts)
Improvements in reliability and maintenance of signaling assets, Low insulation work for signaling cables and Earthing's to signals and Location boxes over NED Division.
S&T works in connection with Manmad - Mudkhed - FS+TWS+ WCMSC - 74 sets, CS+CMSC - 3 sets, SEJ 42 Sets in Nanded division.
Strengthening of Earthing and Surge Protection Systems for Reliable Signalling over Nanded Division
S&T works in connection with Extension of COP to Cover Entire Length of Platforms at Adilabad, Kinwat, Himaytanagar, Bhokar, Manwat Road, Selu, Partur, Rotegaon and Washim Stations over Nanded Division
Supply installation testing and commissioning of Signalling material in connection with Interlocking of LC Gates having ATVU above 10000. (3 Nos)
Comprehensive Annual Maintenance Contract of OFC cable for SCADA Communication laid in GKP-PRZ, STP-MLN,GD-BNY,GD-BRK & STP-BKT section with deployment of maintenance team for each section for 02 Years.
Gorakhpur cantt-Lucknow jn.:- Interlocking of 06 Nos LC Gates TVU greater than 20000 over LJN Division. (19C PJ-CM, 25C CM-ANDN, 26C CM-ANDN, 91C BNY-PPW, 52C SYU-BVN & 166C GK-BNKJ)
Sectional Telecom Maintenance Contract for Kaurara to Ghaziabad sections of Prayagraj Division.
Provision of Integrated Passenger Information System such as CGS, TIB,PA system etc. at BXR, DNR, JAJ & ZNA (CIB at additional PF) and PPTA, BTA, KOO, DURE, HTZ & BRYA stations under Danapur division
Segregation of LV box for Reliability improvement of MSDAC for 06 stations in DDU Division.
Replacement of faulty Fire Alarms and provision of Aspiration systems alongwith RDSO type Fire Alarms at balance locations over PRYJ division.
Strengthening and Augmentation of Earthing and Bonding Arrangement as per revised RDSO/TAN-3006 in section of Sr.DSTE/Co/PRYJ.
Modification of existing Electronic Interlocking in connection with the construction of RUB/Subway to eliminate Manned LC Gates BG-26 between MHQ-KNF in the ADRA division.
Provision of Power Supply Unit for VDU at 35 Nos. of EI stations and replacement of Signal Items viz Secondary Cell & Latch Relay in Various station of Adra Division.
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Comprehensive Annual Maintenance Contract of Multi Section Digital Axle Counter Make-Frauscher for 246 Detection Points(DPs) over Chakradharpur Division.
Madurai Division: Improvement to earthing arrangements and lightning protection at vulnerable and priority stations/locations
Madurai Division- TTR(FS+TWS+WCMSC) 2 sets in Vanchi Maniyachchi - Tirunelveli section and TTR (FS+TWS+WCMSC) 37 sets in Tiruchchirappalli - Dindigul section
Upgradation and Provision of RDSO-based VSS (Video Surveillance System) at SVDK Station under Jammu Division.
Design, Modification, Alteration, Augmentation, Manufacture, Supply, Installation, Wiring, Testing and Commissioning of Existing Medha make Electronic Interlocking (EI) System at Sabarmati-D cabin, Gandhigram and Sarkhej (03) stations in connection with Doubling work between Sabarmati- Sarkhej Section and at Diyodar station in connection with elimination of LC No. 62 Spl. in connection with ROB work in Palanpur- Samakhiyali section on Ahmedabad division of Western Railway.
Provision of Telecom Equipments as per Standard List for ART by Railway Board for ART at Ludhiana, Amritsar and Firozpur stations over Firozpur Division.
Reliability improvement of OFC communication over Firozpur division.
(i)Bhavnagar Division: Improvement in safety and reliability by providing Assistance to the Engineering Department while working on various type of Engineering Track Machine Work. (ii) Bhavnagar Division: Supply, installation, testing & commissioning of signalling materials in connection of conversion of SWR to LWR on 2 to 4 Degree curves. (iii) Name of work: Supply, installation, testing & commissioning of Signaling work in connection of Rajkot - Somnath - TRR (P) - 26 Tkm.
Bhavnagar Division: Supply, installation, testing & commissioning of Signalling Gears/materials in connection of Interlocking of 26 Nos(PRCL Section) LC gates against sanctioned work Interlocking of LC gates having ATVU more than 10000 (47 Nos).
Reliability improvement by restoration/replacement/upgradation of Telecom Gears under SSE/Tele/IC/LMG of Lumding Division.
Provision of Double Distant signalling for Anuppur-Boridand section and Mauhari- Chhulha Bypass line of Bilaspur Division.
Interlocking of L.C. gates TUV>20000 in the section of ADSTE/HRI of Moradabad Division.
Provision of RTU at Interlocked Mid-Section LC Gates over Delhi Division.
Signaling and Telecommunication portion of work in connection with Five Engineering works in Arakkonam (AJJ) - Renigunta (RU) section in Chennai Division. (AJJ-RU-01/2026)
Signaling and Telecommunication portion of work in connection with various engineering works in CGL-AJJ Section over Chennai division
1. Provision of New Electronic Interlocking at BARAMULLA (BRML) station alongwith Telecom work in c/w "Provision of one additional loop line at BARAMULA" over Northern Railway. 2. Provision of Electronic Interlocking at SOPORE (SXZM) station alongwith Telecom work including Block Working in c/w " Provision of crossing station along with Goods handling facilities at Sopore" over Northern Railway.
Provision of 07 Nos. Electronic In-Motion Weighbridges(EIMWBs) over Chakradharpur Division.
Balance work for Placement of 1 No. Non-AC Commercial registered vehicle i.e. SUV or Similar for ADSTE/Jharsuguda.
S&T work in connection with Provision of IBSS between Nuagaon and Bangurkela Station.
S&T Work in connection with Construction of Hathi passage (underpass/ over pass) for movement of Elephant at 11 locations.
Provision of Track Circuits using MSDAC due to water logging at SJRR yards of Alipurduar Division.
Execution of Signaling & Telecommunication work in connection with: Reliability improvement in the working of LC Gates through the provision of improved circuit (4-2-ka-1), replacement of Pedestal, Lock Post, Power Relay (BLR), MSR etc and other reliability improvement works at LC Gates over Raipur Division.
S&T portion of work in connection to (i) Railnet connectivity for feasibility of 100 bedded Running Room with Combined Crew Lobby at Abada (ii) Railnet connectivity for construction of 20 bedded Running Room at Mecheda (iii) Provision of Telephone & Railnet/FOIS connection in connection with construction of new Combined Crew Lobby at Kharagapur. (iv) Provision of high-speed Wi-Fi access points at DRM building & Other offices in Kharagpur Division.
Interlocking of 06 nos. of LC gates (JT-27,RV-21,RV-47,RV-59,RV-90 & RV-169) with TVU above 20K of Sambalpur division.
construction of New IOH shed with EOT over SBC division, (ii) Provision of Telecom arrangement for Construction of new pit line and renovation of existing pitline in Ac LOCO Trip Shet at SGT stn & (iii) Provision of Telecom arrangement for new crew lobby at SGT
S&T work for Up gradation of Control office in c/w various Rail bhoomi crossing seva works.
Signalling work in connection with Provision of crossover between UP & DN TH line in Vikhroli & Shifting of crossover 108 to relax existing PSR 60 Kmph at Byculla in Mumbai division.
Signalling work in connectio with Removal of diamond with provision of cross over ladder connecting DN TH line to DN LL and DN LL and UP LL to UP TH for relaxation of PSR 65 kmph at Vidya vihar station in Mumbai division.
Signalling work in conection with Provision of new COP on uncovered portion of platform and replacement of damaged valley gutters and down take pipes in section VVH-TNA & CSMT-CLA in Mumbai Division.
Comprehensive Annual Maintenance Contract of Electric Industries make IPS (12 nos.) installed over Lucknow Division of Northern Railways for 36 (Thirty-Six) months