Loading…
Loading…
1,419 results • Latest
S&T work i.c.w. Provision of Shunting neck on Line No 4, both sides at Chaukhandi (CHH) station of Lucknow Division of Northern Railways.
S&T work i.c.w Provision of RUB in lieu of trespass location at Km 1075.391 (closed LC no 182/C) between SFH-ML stations on Lucknow-Ayodhya Cantt Section & Provision of RUB at KM.1071.404 near ROB no.789A (Sadar ROB) between LBH & LKO stations on UTR-LKO section & Rebuilding of ORN-3 bridges (Total 23 nos. bridges) in the jurisdiction of ADEN/II-SLN under Sr. DEN-IV/LKO of Lucknow Division of Northern Railways.
Replacement of Siemens conventional ECRs and bulbs with Siemens type LED ECRs and LED along with provision of power supply arrangement in the section of SSE/Sig/RRI-LKO of Lucknow division of Northern Railways.
Indoor and Outdoor Signalling works in connection with provision of Tower Wagon Sidings at Barshi Town & Sangola stations in Miraj-Latur section of Solapur Division.
Design, supply , installation, testing and commissioning of IP-MPLS routers at Ajmer, Bikaner, Jaipur and Jodhpur Division of North Western Railway
APPOINTMENT OF PROJECT SUPERVISION SERVICES AGENCY (PSSA) for PROVIDING PROJECT SUPERVISION SERVICES at Various Construction Sites/Sections in the jurisdiction of Dy. CSTE/Construction/Dadar/CR
Signalling works in connection with CTR/TTR works in EAST section of Mumbai Division.
Signalling work in connection with CTR/TTR works in South section of Mumbai Division.
Provision of MSDAC in Addition to Existing DC Track Circuit at Burhwal Station in Lucknow Division of N.E. Railway.
Telecom Work in connection with Strengthening of Railnet at Railway Colonies, ORH/Sub-ordinate rest house, Hospital/Dispensaries, RPF Barrack etc. over Jaipur Division.
Provision of both OFC( E1 Channel or Dark Fibre ) & Quad Media for UFSBI/SSBPAC over HWH Division
Supply, installation, testing & commissioning of signalling items in connection with the work of Reliability improvement and replacement of defective/overaged midlife signalling gears under the jurisdiction of ADSTE /Surat of Virar- Surat Section of Mumbai Division.
Project Supervision Services (PSS) for Various Construction Sites/Sections under the jurisdiction of S&T Project Nagpur Unit, South East Central Railway
Provision of OFC Laying (48 Fiber) in DNA-RTGH,MKN-PBC, MTD-BKN, MTD- MEC,PPR-BARA, RKB-JSM, THM-SONU, SMR-BME-MBF sections of Jodhpur Division in Connection with Kavach and LTE work.
Asansol Division: Extension of Loop Lines length Over STN-JAJ Section.
Asansol Division: Replacement defective Quad Cable in ASN Division.
Provision of 5 Nos IB Signals in Marauda (MXA)- Dallirajhara(DRZ) Single line Section of Raipur division.
Ajmer Division:- Provision of S&T Associated work in C/W Beawar - Palanpur - TTR (WCMSC) - 284 Set in Ajmer Division NWR."
Ajmer Division:- Provision of S&T Associated work in C/W Chittaurgarh-Udaipur- TTR(FS+TWS+ WCMSC)-45 set in Ajmer Division NWR
Ajmer Division: Augmentation and upkeep of various components/parts of AFDAS (Automatic Fire Detection and Alarm System) in connection with RDSO TAN 3009 at various stations of Ajmer division.
Repairing of Faulty Fire Detcetion & Alarm System in various stations over Moradabad Division
Provision/Upgradation of Infrastructure facilities, Monitoring Mechanism, FOIS/TMS at Six Goods Shed over MB Division (RMU, AMRO, BSC, HPU, HRI & ROZA).
One Time Repairing of Baggage Scanner At Bareilly & Haridwar Railway Station.
Pathri Common user traffic facility at Pathri in c/w CONCOR GCT
Provision of SSDAC/MSDAC in lieu of overaged Universal axle counters in CH-BE section of Moradabad Division.
Provision for Road Signal at interlocked gates over MB Division.
Comprehensive Maintenance Contract of Electronic Interlocking System of MEDHA make for a period of 3 years over MB Division.
Replacement of indoor interlocking Signalling gears of Chandni (CDI) Panel by Electronic Interlocking on BSL division
Improvement in earthing & surge protection arrangements for S&T equipment's in DD-MMR section's and leftover section's of Pune division for improving reliability of the S&T gears.
Protection/ shifting of S&T cables/ gears at various bridges/ retaining wall works of Solapur division on Central Railway.
DSTE/MAQ section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of DSTE/MAQ section
ADSTE/PGT section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of ADSTE/PGT section
ADSTE/CLT section: Reliability improvement of Signal and Telecom assets by replacement of defective cables, protection of cables and other works, painting of S&T gears at various locations of ADSTE/CLT section
Bhavnagar Division: Supply, installation, testing & commissioning of Signalling Gears/materials in connection of Interlocking of 21 Nos LC gates against sanctioned work of Interlocking of LC gates having ATVU more than 10000 (47 Nos).
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/BPB/IC.
Comprehensive Annual Maintenance Contract of Siemens make Electronic Interlocking at 16 Stations for a period of Three (03) years i.e. 36 Months in Alipurduar Division.
S&T work for provision of shifting of Electronic Interlocking equipment from Khurja ASM old building to Khurja ASM new building.
Replacement of 4 QUAD Cable by 6 QUAD Cable in BG-III section.
1) PAN India Roll-Out for PRS Modernization Work against UTN Network over Dhanbad Division. 2) Up gradation of Existing telecom network connectivity of Divisional HQ and associated units with fiber-based network on GPON over DHN Division. 3) Installation of CCTV in parcel offices (DHN, GMO, KQR, BRKA, DTO, GHD, CPU, SGRL & SKTN) over Dhanbad Division. 4) S&T related Items for - "Enhancement of coach stability capacity at coaching Depot Dhanbad Yard after CTR(S) of IOCL siding in non-interlocking area."
Strengthening of signalling arrangements /infrastructures for dual detection using MSDAC in parallel to DC track circuit at LAK & BGS.
Comprehensive Annual Maintenance Contract (CAMC) for Electronic Interlocking (EI) at 7 stations over SBC Division.
Rajkot division: Provision of CCTV monitoring facility at WAR ROOM-RJT, CMI-RJT, CMI-SUNR, CMI-DWK, CMI-JAM, SS-WKR offices over Rajkot Division.
Reliability Improvement of Signalling Installation i.c.w improving Signal visibility & minimizing the rectification time of Signal failure & in the section of Sr.DSTE/Co./LKO of Lucknow Division of Northern Railways.
Comprehensive Annual Maintenance Contract of STATCON ENERGIA make IPS (24 nos.) installed over Lucknow Division of Northern Railways for 36 (Thirty-Six) months
S&T work i.c.w Improvement of earthing arrangements as per latest RDSO guidelines No.- RDSO-SIG0SPD(PROJ)/1/2020, dated 01.01.2025 over LKO division of Northern Railways.
Ajmer Division-"Provision of 72 CCTV cameras with monitoring and recording system at all Major Booking office & PRS counters, 22 Stations (29 Locations)."
Comprehensive annual maintenance contract for Integrated Power Supply (IPS) system and mini IPS (Statcon make) of Raipur division for a period of 36 Months (03 years) with OEM through a single tender.
Comprehensive AMC for Electronic Interlocking (EI) at Jamul Cement Works (JCW) station of Raipur Division by OEM (M/s Hitachi Rail STS India Pvt. Ltd., Bangalore) for the period of 12 Months through a single tender.
1. Provision of CCTV Surveillance system at RPF Posts/Out Posts having coverage over space provided for keeping accused and interrogation Purpose.2. Expansion of CCTV Surveillance network in Railway Hospital Ambala Cantt
1. Provision of EC Sockets on 6 Quad cable in Sirhind(SIR) - Una Himachal (UHL) UMB Division 2. Telecom work in c/w Construction of 6mX5m size Limited height subway in lieu of level Xing 5, between Kharar and Junction cabin station of CDG- MRND section to eliminate level Xing in the section of SSE/W/CDG under SR.ADEN/CDG. 3. Telecom work in c/w Construction of 6mx5m size LHS in lieu of level Xing 6, between kharar and Junction cabin station of CDG-MRND section of SSE/W/CDG under SR.ADEN/CDG. 4. Telecom work in c/w Construction of 6mx5m size LHS in lieu of level Xing 7, between kharar and Junction cabin station of CDG- MRND section of SSE/W/CDG under SR.ADEN/CDG. 5. Telecom estimate in c/w Improvement/Upgradation at DTTS/KLK AT KLK. 6. Telecom estimate in c/w Improvement/Upgradation of safety camp DMP.