Loading…
Loading…
10,613 results • Best match
Laying work with supply of 400 kV accessories for rectification of 400 kV cable fault by Southern Railways in Sholinganallur 400 kV SS OH and UG common point near Pallikaranai to Guindy 400 kV GIS SS at St Thomas Mount Metro Station premises
Laying of 1X2500 Sq.mm 400 KV XLPE UG cableby means of which over rollers (should be supplied by the contractor and the rate is for ckt mts,ie, for 3 runs of cables.). This rate includes the cost of detaile route survey,transportation,and providing of winch,steel wire drum,cable drum stand,wind generation rollers,ramp and other items and other items,engaging lorry and crane for 2trips, loading and unloading ,positioning of winch,D.G set,control unit and ,meter operated rollers and other rollers,cable and laying of L.T power cable in 60m to 80m bits for meter operated rollers and which on day before laying and dismantling and resting of rollers in rollers boxes after completion of laying,cost of pulling the steel wire rope from which side to drum side ,providing labour as required at site for tying the cable in terfoil formation with nylon rope.
Basanti Highway (SH-3A) from Minakhan 132/33 KV Sub-Station (Ch.34.70km) to Malancha Bridge (Ch.40.90km) restoration of damaged by laying of 33KV UG Cable line by Basirhat Division, WBSEDCL under South 24 Parganas Highway Division.
Supply, Erection, Testing, Commissioning for Creation of 2X 250 KVA Sub-Stations alongwith laying of HT XLPE Cable 120 mmsq 3 Core at GGM Science College Jammu for new constructed building under Electric Division Div-I JPDCL Jammu
Supply, Erection, Testing & Commissioning for laying of HT XLPE Cable 120 mm sq. 3 Core at GGM Science College Jammu for new constructed buildingss
Restoration of footpath at Tilak Marg, Bhagwan Das Road and Sikandra Road cut by Electric Department for laying of HT cable from newly installed Supreme Court Electric Substation under the jurisdiction of sub-division-II and III(R-I).
Road restoration work at Rafipur - Padmalavpur - Kankinara Road from 10.50 Kmp to 13.30 Kmp due to Laying of electric cable by HDD method by WBSEDCL under Barasat Highway Division - II in the district of North 24 Parganas Deposit Work
Providing and laying Dense bituminous macadam with Hot Mix Plant using crushed aggregate of specified grading, filler(hydrated lime) premixed with bituminous binder of approved grade @4.5% (min) for Grading -2 by weight of total mix as per table 500-1O and mix design done as per table 500-11 and Job mix formula os per clause 505.3.3 of MoRT&H (5th Revision), including screening, cleaning of chips , transporting the hot mix to work site, laying the mixed materials at specified laying temperature, as specified In Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa, to achieve the desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges of machinery and equipment for construction and quality control complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH.
Enq.No.04-I 25-26 WCT for laying of 11kv 3x300 sqmm XLPE cable for erection of 11kv nesapakkam fdr 2100 m to be fed from 110/11 kv ramapuram SS
Drilling, Reaming & Laying of 11KV Cable using Trenchless Technology Method (Horizontal Directional Drilling method) at a depth of about 1.20m or more by using directional drilling unit equipped with automated pipe handling system, using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other services like telephone, Internet cables, water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc., taking necessary drive pit for drilling & laying the cable, removing the excavated earth. The rate quoted for includes the charge of GPR (Ground Penetrating Radar) Survey for identifying the existing utility in the proposed bore path, making necessary entry pit and exit pit at every 200m intervals, extra excavation for joint pits, road/rail crossings, if any,including erection of ID,OD & Straight Joint Kits as required and as directed, transporting of cable drums from stores including loading and unloading using truck mounted crane, transporting of empty drums including loading at site and devolution of empty cable drum & balance cable to Departmental Stores etc., complete as directed.