Loading…
Loading…
16,975 results • Best match
Annual Maintenance Contract AMC for as When Required Maintenance of High Mast Towers Flood Light Towers Street Light Poles and associated accessories installed at ERPL Haldia PHBPL PHBMPL PSHPL Haldia for 02 Years
Cable Laying OD above 20mm: Laying of ...
Development of Central Tasar Nursery & Tasar Silk Park at Khuntagaon TRC, Lahunipada, Sundargarh
B. LV / MV CABLE TRENCHING AND LAYING WITH SAND AND PROTECTIVE
"Electrical work in connection with "Provision of 12 m wide FOB at GMC yard regarding developed GMC yard as satellite station in Prayagraj division"
Excavation of cable trench in soft morrum plain Metre ground concrete/pucca surface et cand back filling of cable for laying of LT cables including placing of bricks in cross position etc.
PROVN OF SHED FOR COVERING SOFT PEN ALONGWITH CERTAIN B/R AND E/M WORK SERVICES AT AF STN ADAMPUR
... sand, 80mm thick before laying of cable and 150mm thick (punned down to 10mm thick) after laying of cables in trenches/ducts complete ...
SPL REPAIR OF SECURITY LIGHTS AND ALLED WORKS AT STN HQ AREA, PROVN OF VEH PARKING SHED NEAR BLDG No P-386 AND OTHER SANCTIONED WORK IN ARMY AREA UNDER GE (A) No 1 JODHPUR
... layers (8cm thick before laying of cable & 15cm thick after laying cable to a total of 23cm) including ...
SPL REP TO P-56A AT LOWER CAMP AND VIEW CUTTER IN BLDG P- 39, BEACHER ROAD, PROVN OF BATHING SHED INCL WIRING NEAR BLDG T-33 AT 10 DOGRA AND PROVN OF CEMENTED GARBAGE BIN NEAR BLDG T-37, MD ACCN BLDG T-152, T-156 NEAR SINGLE GATE UNDER GE DEHRADUN
Excavation in trenches soft/loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth and getting out excavated soil/sand/unsv LT Cable for laying of cable and getting out.
PROVISION OF WEATHER SHED AT PARADE GROUND IN CGDHQ-3 NEW MANGALORE
... not less than 50 mm for laying of electrical cable in GI pipe and makng good... PCC or same material after laying of electrical cables and returning filling complete ...
Signalling work in connection with provision of track machine stabling lines, yard upgradation, improvement and various track renewal work in JAJ-DDU section under Danapur Division.
... following DIN-53438 Part II, for laying signalling/telecom cables. As per RDSO technical specification STS/Cable- Laying practices Vol- IVDt. ...
El.D.C.No.Centre/556/2026/ Supply and Erection of 4nos of 8mtr Minimast and 7Nos of 7mtr NV lamp post with fittngs with 278mtr of Cable at Various Junction dark spots in Div-65,68 and 69 of Zone-VI
Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth)
Electrical works in connection with Augmentation of ART & SPARME siding & relevant facilities at SBP Coaching Depot.
Laying of cable in air/on wall/pole / through GI Pipe/culvert/cable trench/HDPE pipe etc.
SPL REPAIR TO EXISTING STD BY ELECTRIC CABLING ARGN FROM AIR OP POWER HOUSE TO TECH A AT ARMY AVN SQN UH UNDER GE 865 EWS LEH
... depth and getting it out for laying of cable / pole in hard/dense soil, ...
Electrical works in connection with Augmentation of ART & SPARME siding & relevant facilities at SBP Coaching Depot.
Laying of cable in air/on wall/pole / through GI Pipe/culvert/cable trench/HDPE pipe etc.
WBPWD/AE/SESD-I/e-NIQ-02 of 2026-27
Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting
ARRANGEMENT FOR OUTDOOR ILLUMINATION SURROUNDING PUMP HOUSE AREA AT PARK CIRCUS BPS.
... with Saddles / clamps.(b)Laying of cable upto 3/4 core 25 sqmm on ...
REPAIRING AND REPLACEMENT OF UTTARAN LIGHTING SYSTEM AT DIFFERENT UTTARAN AREAS IN WARD NO 53
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
REPAIRING AND REPLACEMENT OF UTTARAN LIGHTING SYSTEM AT DIFFERENT UTTARAN AREAS IN WARD NO 51
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
REPARING OF STREET LIGHTING SYSTEM AT M.M. ALI ROAD, DENT MISSION ROAD AND OTHER SURROUNDING AREAS UNDER WARD NO. 77.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
REPAIRING AND REPLACEMENT OF UTTARAN LIGHTING SYSTEM AT DIFFERENT UTTARAN AREAS IN WARD NO 52
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
ELECTRICAL SAFETY RELATED WORK FOR SWITCHING ARRANGEMENT, TIMER AND OTHER ELECTRICAL ACCESSORIES AT WEST ANANDAPALLY, DINESH PALLY ETC AREAS IN WARD NO 114, BR-XI.
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
REPARING OF STREET LIGHTING SYSTEM AT RAMKAMAL STREET, HEMCHANDRA STREET AND OTHER SURROUNDING AREAS UNDER WARD NO. 76.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
El.D.C.No.South/0624/2026 Supply and Erection of 10 Nos of 7 Mtr street lamp post with LED fittings at NSK Nagar Junction Nehru Nagar and Thiru vi ka street junction in Division 175 Zone 13
Labour for laying of cable through HDPE pipe ( 50 mm ...
El.D.C.No.Centre/0324/2026 Supply and Erection of 43 Nos of 7 Mtr street lamp post with LED fittings at Arcot Road from Eakambaram Street Junction to Vadapazhani Bus Depot Junction in Dn 129 Zone 10 Deposit Work CMRL
Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth)
Business Plan 2026-27 work at Bahseerganj Sub Station under EDD-I, Bahraich
... standard depth and width for laying the cable are also attached (as per ...
MADURAI DISTRICT PROVIDING NEW BOREWELL ARRANGEMENTS IN HSC BUILDING IN VADAKKAMPATTI VILLAGE AT KALLIGUDI PT IN KALLIKUDI PANCHAYAT UNION.
For Laying submersible Cable in below Ground level including Earth work and all labour charges etc.
El.D.C.No.South/2453/2026 Supply and Erection of 91 Nos of 3 Mtr street lamp post with LED fittings at Annai Velankanni Nagar Phase 1 2nd street park Devadoss Street Park Sabhari Nagar 5th street park and various parks in Division 156 Zone 12
Laying of cable along road / street through 50mm OD, HDPE pipe (trench size 45cm width x 75 cm depth)
Mini High Mast Light (2 nos) beside Health Centre Dakshinpara Dargatola
Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench for single, 2, 3, 3½ & 4 core. [PWD Schedule Page No-F-1 Iteam No-11c] DISTRICT CHARGES ADDED @ 3.00 %.
Replacement of HPSV fittings with LED fittings and replacement of failed cables from Con 9A1B1 to 13AB conveyors of CHP-1 RTPS
Laying of cable in Existing trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. LT cable -2.5 to 25 sq.mm.
as per NIT
... including all T&P's required for laying of cable and pulling the steel wire ...
IMPROVEMENT WORKS TO 36MLD
... works,display fixing- 5 n0s laying all cable PVC insulation
Supplying,Fixing and Commissioning of Booster Pumpset Near Vasundara Layout GLSR at CMC Hebbagodi Limits
Laying of cable in Existing Trench or GI pipe or Stone Ware or RCC Hume pipe using Wooden or Aluminum Rollers as directed by the departmental staff
REPAIR, MAINT AND IMPROVEMENT OF WATER SUPPLY, SEWAGE PUMP HOUSE, REPAIR AND DG SET REPAIR UNDER GE DRONACHAL
Supply, laying and testing cable XLPE Insulated ,screened, ...
Surveying, Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR cum Pump house , SCADA Automation of all CWR, Rising Main, Distribution Network, House connection, Boundary wall, MS gate etc
Supplying and laying of Power cable of 70 sq mm/suitable size of 11000 Volt grade 3.0 core armoured XLPE sheathed Al conductor from UPPCL metering panel to HT Panel & to transformer
SALEM DIVISION: Replacement of overaged/ obsolete S&T gears & other associated works over Salem Division
120.00 cable laying with offset at both ends... pipes with couplings and laying of cables is not included in this ...
REPAIR AND MAINT OF SOLAR STREET LIGHT AND HIGH MAST LIGHT UNDER GE ARMY JAISALMER AT MIL STN JAISALMER
... in depth for foundation, laying of cable/pipe etc or for shafts, ...
SPL REP TO BLDG NO ET-62 AND ET-67 AT DARRANGA MIL STN UNDER GE RANGIA
... thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) ...
At FKM: Balance Electrical work of FKM station in connection with ABSS provision of Platform surfacing, development of circulating area, approach road and toilet in circulating area for passengers in the jurisdiction of SSE/W/FKM.
Excavation of cable trench for laying of cable with necessary cable protection is to be done as per direction of Railway Engineer.
AMRUT 2 Optimization of Production and Transmission Replacing the existing 74 MLD pumpset to meet the second stage demand of 141 MLD Pipeline Work
OD3241/2026-2027: MV XLPE ARMOURED CABLE -) Supply and laying of 3.5x35sq.mm Armoured ...
Signaling work in connection with interlocking of Level Crossing Gate no. 30, 31, 40 and 42A in East section of Mumbai Division.
... Engineer-in-charge. This includes laying & termination of cable, if any from panel Room ...
Signaling work in connection with interlocking of Level Crossing Gate no. 30, 31, 40 and 42A in East section of Mumbai Division.
... Engineer-in-charge. This includes laying & termination of cable, if any from panel Room ...
REPAIR/REPLACEMENT TO LT CABLES, LT PANELS, MAINT OF STREET LIGHT POLES / TIMERS, MAINT OF VARIOUS TYPES OF STREET LIGHTS AND CONNECTED ACCESSORIES IN SF ACCN AREA AND T LINE AREA UNDER GEKAMPTEE.
Taking down the unserviceable LT cable of any size from tranches/ walls /floor etc complete all as specified and as directed. Note :- laying of cable route is same as old cable route .
Conversion of LT overhead conductor into LT UG cable and other allied works of RWA-12 at Bikram Enclave under GE (Utilities) Udhampur
... exc. 1.50 mtr depth for laying of underground cable, erection of poles etc. ...
Spl repair/replacement of overhead low tension power distribution network into UG cables at RWA-15, RWA-16 and pump house Bikram Enclave under GE (Utilities) Udhampur
... exc. 1.50 mtr depth for laying of underground cable, erection of poles etc. ...
PROVISION OF FURNITURE SHED FOR BSO AT AF STN MEMAURA
Supply and laying & testing and commisioning LT underground cable 1100 volts grade, XLPE insulated ...
At Varanasi - Provision of stadium High Mast for improvement of lighting in Railway Stadium.
arrangement. Cable laying work shall be governed by IS :1255/1983.(cable supplied by Railway)
Telecom Work in connection with Provision of RPF Barrack (30 Beds) including Kitchen, Lat/Bath, Recreation hall, Dining hall etc. at KNE.
... original condition after cable laying and refilling the trench. ...
Repair and renovation of existing open shed for high rise materials with unloading platform along with electrical items for improving safety and handling of materials with wiring and lighting arrangement and associated work at T.C.S, Jamshedpur
PVC/XLPE insulated PVC sheathed heavy duty, armoured electrical cable laying with aluminium conductor for working voltage up to and including 1100 volts 16sq mm ,4 core
HANDOVER OF DECORATIVE POLES AND LED LIGHT MAINTENANCE WORK FROM SMART CITY PRIVATE LIMITED, JAIPUR IN ADARSH NAGAR ZONE OF JAIPUR MUNICIPAL CORPORATION AREA. ANNUAL RATE CONTRACT FOR THE YEAR 2026-27
... Depth below the ground for laying cable of following Nominal Outer ...
Providing, Supplying, Erection,Testing and Commissioning of High mast at Ward 11.File No.179/25X6/4.2nd Call.
CABLE LAYING Laying of one number PVC insulated and PVC sheathed power cable of 1:1 kV grade of size not exceeding 25 Sq.mm in the existing RCC Hume/Stone/Ware/G.I. pipe as required
Supplying, Installation, Testing and Commissioning of 3 Nos. of 20M raising and lowering type High Mast along with related electrical work for Yard Lighting at Malvani Bus Depot.
Providing, laying and fixing of 40mm. dia ‘B’ Class G I Pipe as directed by the Engineer (for laying cable at IN & OUT Gate).
CHANGING OF LEAKAGE 6inch PIPE APPROX 5 NOS. OF SUBMERSIBLE PUMP MOTOR SET AT 6 PIT SHAFT AFTER MAKING PLACE TO OPERATION CRANE BOOM ON SHAFT MOUTH BY PARTIALLY PORTION CUTTING REMOVING HEAD FRAME
ELECRICAL EQUIPMENT SWITCH,STARTER PLACING AND CABLE LAYING. (12 HEAD X 04 SHIFT) (H/SK-1X502.44+SK-11X434.96) = 5287.00