Loading…
Loading…
10,704 results • Best match
REPAIR REPLACEMENT OF SECURITY LIGHT CONTROL GEAR SWITCHGEAR AND CABLE AT MIL STN GANDHINAGAR
Supply and laying sand cushioning for cable protection in trenches 8 cm before laying cable and 15 cm deep over the cable all as specified.
Replacement of defective power cable from feeder piller to meter room in BSNL Colony at Sec k ,Aliganj ,Lucknow
Making trench direct in ground for laying of cable i/c excavation and refilling the trench after laying of cable etc. complete as required.
1.Excavation of cable trench 2.Mounting cable 3.Doing straight 4.Providing earth using earth pipe 5. Supplying and pulling HDPE pipe
Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of Cable).
PROVN OF RING MAIN CCT BETWEEN 33 KVA FEEDER AND ALLIED WORKS IN ARMY AREA JODHPUR UNDER GE (ARMY) NO. 01
M & L for sand cushioning with dry coarse sand to under ground cable around the cable after laying the cable complete all as specified and directed by Engr-in-charges. Note : Thickness after punning shall be considered for payment.
37/EDC(Ayodhya)/2026-27
Behind 11kv Panels Remove Unuse cable & proper cable laying work
UPHA- PROVIDING AMENITIES TO ST. ANGELO FORT AT KANNUR (2025-26), KANNUR DIST., KERALA
Charges for PVC Conduit Laying, UTP Cable Laying, Optic Fiber Cable Laying, Wall Mount Installation, Server Rack Installation, Camera Installation & Configuration, Network Video Recorder Installation & Configuration, Optic Fiber Core Splicing, Digging the Soil Upto 3 Feet depth, Refilling & Resurfacing.