Loading…
Loading…
10,461 results • Best match
Work of Laying of Earth Mesh Earthing of Sub Station Structure and Equipment Erection of Steel Structure and equipment Stringing of Bus Bar and Earth wires Jumpers Installation of Control panels cable laying and termination of cable 132 KV GSS SAYRA
Repairing of ceilling fans and other E.I Work under Gangarampur Sub Divisional Hospital and cable laying under Kushmandi Rural Hospital in the District of Dakshin Dinajpur.
Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench for single, 2, 3, 3½ & 4 core [Page No. F-1, Item no. 3(a)]
Providing and Laying of Under Ground Cabel at Malka Prole to Ramgarh Bypass
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of Earth & Back filling with compaction is to be Paid Extra)All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .50 mm
Road restoration by pdg. RMC of cut by digging work for laying of LT Cable by BSES Near Krishna Market at Ward No.82 (Paharganj), M-II/KBZ.
Road restoration by pdg. RMC of cut by digging work for laying of LT Cable by BSES Near Krishna Market at Ward No.82 (Paharganj), M-II/KBZ.
Schedule of work for Installation of Electrical Equipments, Laying of 11 KV Grade XLPE UG Cable Copper Control Cable and other allied work for construction of new 33 11 KV Sub Station at Pandua SubStn under Mogra Division of HooghlY
Laying of 2.5 sq.mm. Copper control cable (4/8/12) core for interconnection of 33 KV Control & Relay Panels with PTRs, VCBs, CTs & PTs with supply and fixing of Cable Gland, Ferrule, PVC Tape, Socket, Tags etc. through existing trench ( Only Control cables will be supplied by WBSEDCL). i) 4 core control cable - 3200 mtr. ii) 8 core control cable - 1000 mtr. iii)12 core control cable -1500 mtr.
Supplying and Laying work of standby cable for main electric power supply from 500 kva , 33/.4 kv sub station to DG room main panel
Laying of one number armoured / unarmoured cable 1.1.KV grade of size exceeding 120 sq. mm. but not exceeding 400 sq. mm direct in ground including excavation in all soil/ murrum /soft rock, and sand cushioning protective covering and refilling the pit etc. as required