Loading…
Loading…
16,926 results • Best match
Electrification Work at Nareli Warehouse Scheme, Ajmer
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable. (d) Lay the protective Common burnt ...
CA NO CE CHZ PAT T 09 2025 26 PROVISION OF ROOF TOP SOLAR PLANTS TOTALLING 500 KW AT CERTAIN BUILDINGS AT PATIALA
... tray where ever required to lay the cables. The laying of wires will be as per... years (m) Suitable size cable tray for laying of cable AC/ DC will be included ...
Hyderabad Division: Construction of trip shed at Kacheguda- Electrical arrangements
... widex90cm deep road etc., for laying of LTUG cable. After laying of cable the trench should be brought ...
Hyderabad Division: (1) Cavalry Barracks - Replacement of Panel interlocking both indoor and out doot by Electronic Interlocking System at Cavalrybarracks stations in connection with provision of EI at balance stations on HUN/HDN routes where Kavach/ABS/CTC is sanctioned & (2) Signalling arrangement in connection with Lallaguda Gate Halt: Provision of stabling lines at Lallaguda Halt station.
... of Rock, concreting after cable RMT laying with 1 cement: 2 sand: 4... concreting 200mm x 200mm after laying of cable as per Drg No. SK/CN/NEW/3.
Increasing Capacity Works
... by brick. On both side of cable by laying brick along the cable ................ includes digging of trenches, laying of cable in under ground trenches, ...
Memo No. 2407 /EE (Elect/446) /NKDA/EE(E )/ 2025-26 -Hiring of Vehicle mounted DG Set
... charges of PVC aluminium cable of including laying and connection and dismentlign ...
Supply, Installation, Testing, Commissioning, Maintenance of Traffic signal At Rampur Tiraha, Medical tiraha, Ekta Choke and Baldeobag choraha, Jabalpur M.P.
Civil Work (Including road cutting, backfilling, cable and pipe laying, etc.)
Replacement of Battery Bank and Renovation of Control Room at 33/11 KV S/s Sector-03 and Secotor-04, SIDCUL under EDD-I, Rudrapur
Laying of Control cable of all sizes through trench, ...
Special repair of EPBX intercom system, intercom cabling and LAN cabling arrangments for the State Human Rights Commission
Supply and Laying of Cat6 cable with PVC pipe on wall and ceiling. Make:D-Link/Eq.
Construction of New Substation
H.T. Power Cable Laying : a) Laying 11 KV, 3×300... by brick. On both side of cable by laying bricks vertically and bricks ...
REPAIR/MAINT TO WATER TREATMENT PLANT AND OTHER PUMP/MOTORS INCLUDING ITS STARTER PANEL BOARD UNDER AF STN PHALODI
... manholes, pier holes or for laying underground cable, pipe lines etc. in soft/ ...
For Shifting of 33 KV / 11 KV / LT Line / DTR Shifting Work at Different Locations Under PWD E/M Sub Division W/S Bhopal
Laying of underground cable armoured./unarmoured as per specification in air suspended on existing approved type of iron clamp, G.I wire 7/1.6mm & shackle insulator/insulated strip complete.
S&T related cable shifting/utility shifting for facilitated engineering earth work for construction of fencing /ROB/RUB/LHS /Drain /Bridges repairing etc. in Gondia- Jabalpur section in NAG division of SECR.
Description:- Laying of Power cable in the same excavated trench to Drg. No: CON/SK/T/5.Transportation, supply of 'U' clamps and anchoring of cable at every 10 Mtrs with 'U'
PROVN OF 02 NOS FOUNTAINS IN THE LAWN OF ADM BLOCK, PROVN OF RAMP FOR TRANSPORT POOL WITH ALLIED FACILITIES AND PROVN OF LED FLOOD LIGHT WITH POLES AT ICGS PIPAVAV UNDER GE (I) CG PORBANDAR
Supply, laying and testing cable XLPE Insulated, screened, ...
MAINT OF ROAD SIDE LIGHTING WORKS AND MISC ELECTRICAL ITEMS UNDER GE N AKHNOOR
Sand cushioning with Ganga Sand to underground cable (8 cm thick before laying and 15 cm thick after laying the cable) complete all as specified and directed.
SPECIAL REPAIR TO BUILDING NO. P-172, P-173, P-174 AGAINST JOB NO W/SR(BLDG)-08/STN HQ KHUNMOH/2025-26, SPECIAL REPAIR TO BUILDING NO. P-161 (TSS STORE), T-89 (REPAIR BAY) AND P-15 (BATHROOM) AGAINST JOB NO. W/SR(BLDG)-09/STN HQ KHUNMOH/2025-26
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified. ...
COMPLETION OF INCOMPLETE WORK OF AUGMENTATION OF GEARING AND SHAFTING FACILITIES AT NSRY, SRI VIJAYA PURAM.
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified ...
ARMO Electrical works at FSD Avadi for FY2026-27 Replacing existing UG cables with new UG cables for Depot office,Mini,Main Godowns,replacement of damaged distribution,High mast feeder pillars,rewiring of Godowns,providing streetlights to PF godowns
Cutting the bituminous/ CC road for trenching and cable laying and after cable laying and making good the road with suitable grade cement concrete as required at the site of work.
S&T Work in connection with Construction of Hathi passage (underpass/ over pass) for movement of Elephant at 11 locations.
... nos. of labours for proper laying of cables into the bore. Cable shall... shall be made only after laying of the cables into DWC/HDPE/GI pipe.
S&T Work in connection with Construction of Hathi passage (underpass/ over pass) for movement of Elephant at 11 locations.
... nos. of labours for proper laying of cables into the bore. Cable shall... shall be made only after laying of the cables into DWC/HDPE/GI pipe.
Supply installation testing and commissioning of Signalling material in connection with following work:- 1)- Pawasa: Provision of new "B" class station between UJN and PLW in connection with Simhastha 2028. 2)-Lekoda - Upgradation of existing "D" class to "B" class in connection with Simhastha 2028.
120.00 collars in trenches at places of track and Metre road crossings, platform cuttings etc. also for straight cable laying. (Cable laying is covered separately.)
CERTAIN SANCTIONED WORKS UNDER GE (EAST) JABALPUR
... cable 8 cm layer before laying the cable and 15cm thick layer after laying the cable. Note-Sand layer shall be ...
Increasing Capacity of Various 33 KV Substations
... by brick. On both side of cable by laying brick vertically and bricks... includes digging of trenches, laying of cable in under ground trenches, ...
NAME OF WORK :-Electrical work in connection with Provision of Automatic Block signaling with Centralized Traffic Control (CTC) system Lucknow- Gorakhpur cant section, Upgradation of maintenance facilities of old coaching depot at GKP, Provision of P.P. shelter at 12 Nos. of different station over LJN-DIV, provision of deep tube well with pumphouse at Tulsipur and Barhni of Lucknow Division,Raising of platform from low level to high level at Gangadham PF-1 & 2 & Biseshwarganj PF-1 & 2.Improvement of station building with retiring room, waiting room (ladies & Gents) passenger hall with toilet, PP shelter 2 bay (PF-02) and station signage etc At NTV, Provision of deep tube well with over head tank and with 16 bay PP shelter and improvement of circulating area and Proposal for construction of new crew lobby at NTV.
... trench etc. as required. Cable laying should be as per IS-1255/1983... 1000 mm and 350 mm wide for laying of cable with supply and placing ...
NAME OF WORK :-Electrical work in connection with Provision of Automatic Block signaling with Centralized Traffic Control (CTC) system Lucknow- Gorakhpur cant section, Upgradation of maintenance facilities of old coaching depot at GKP, Provision of P.P. shelter at 12 Nos. of different station over LJN-DIV, provision of deep tube well with pumphouse at Tulsipur and Barhni of Lucknow Division,Raising of platform from low level to high level at Gangadham PF-1 & 2 & Biseshwarganj PF-1 & 2.Improvement of station building with retiring room, waiting room (ladies & Gents) passenger hall with toilet, PP shelter 2 bay (PF-02) and station signage etc At NTV, Provision of deep tube well with over head tank and with 16 bay PP shelter and improvement of circulating area and Proposal for construction of new crew lobby at NTV.
... trench etc. as required. Cable laying should be as per IS-1255/1983... 1000 mm and 350 mm wide for laying of cable with supply and placing ...
MAINTENANCE SERVICING AND ATTENDING DAY TO DAY COMPLAINTS OF HOT WATER BOILERS (HAMAM), STANDALONE CHS AND HEATING APPLIANCES INSTALLED AT SECTOR C UNDER AGE E/M-I OF GE 865 EWS
... underground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified ...
REPAIR/MAINT OF TRANSFORMERS, RMUs, HT VCBs, LT ACBs AND OTHER CONNECTED ITEMS AT CANTT AREA UNDER GE (I) KANPUR
... 23cm thick (8 Cm before laying the cable and 15 cm thick after laying the cable) in trenches including watering ...
WBPHE/EE/JMD/NIeT 11_14 OF 2026-2027
... includes the charges for laying submersible cable from tubewell to control ...
REPAIR AND MAINT TO STREET LIGHT, SECURITY LIGHTS, PERIMETER LIGHTING, FLOOD LIGHTS, HIGH MAST LIGHT AT MIL STN SGNR
... poles, struts, stays etc. or laying underground cable etc. in soft/loose soil, ...
Balance work of Provision of IBSS in both UP & DN direction between Barsuan - Gagnaposh.
... X 300 mm Metre deep for laying of cable in rocky area and refilling the duct (after cable laying) with concrete mixture of ...
Balance work of Provision of IBSS in both UP & DN direction between Barsuan - Gagnaposh.
... X 300 mm Metre deep for laying of cable in rocky area and refilling the duct (after cable laying) with concrete mixture of ...
SPL REPAIRS REPLACEMENT OF BER PACKAGE AC PLANT AT AFS TAMBARAM
... riddling the excavated soil for laying underground cables and post holes complete ...
Alteration to existing outdoor works in connection with Manikgarh Junction (Phase- II) Tripling work between MAGH-BPQ Section of KZJ-BPQ 3rd Line work of Secunderabad Division of S C Railway.
... concreting 200mm x 200mm after laying of cable as per Drg No.SK/CN/NEW/3. Total 561100.00 Item- 7 Cable laying and meggering. S No. Item ...
SPL REPAIR TO BLDG NO AF15 AF16 OTM ACCN AND PROVN OF SRI OFFICE AT RANIKHET
M&L for sand cushioning in trenches spreading and consolidation 8cm thick before laying the cable & 15 cm of sand after laying the cable complete all as specified
SPL REPAIR TO TOILET AND BATHROOM P170 173 PATHWAY FROM DD 01 TO P 46 HML PROVN OF CONCRETE FOOTPATH AT BLDG NO NEAR 55 TO BLDG NO 58 ORs MD ACCN ALONGWITH A RETAINING WALL INFORNT OF BLDG NO 55 AT RANIKHET UNDER GE RANIKHET
M&L for sand cushioning in trenches spreading and consolidation 8cm thick before laying the cable & 15 cm of sand after laying the cable complete all as specified
SPL REP/REPLACEMENT AND REROUTING OF OH ACSR CONDUCTOR INTO UG HT CABLE AND CONN WKS AT MS VIHAR SUBSTATION TO JAK LI AND SPL REP/REPLACEMENT AND REROUTING OF OH ACSR CONDUCTOR INTO UG HT CALBE AND CONN WKS FROM NEAR 118 ENGR UNDER GE (S) AKHNOOR
... cable, 8 cm in depth before laying the cable and 15 cm in depth after laying the cable complete all as specified ...
PROVN OF 320 KVA DG SET FOR MRSA UNDER GE (WEST) JRC
... of sand 8 cm deep before laying the cable, 15 cm depth after laying cable & stretching the cable all ...
Construction of New Substation Khempipara and related 02 Nos. 11 KV line Distt Maharajganj
... bricks around and top of the cable or laying in cable trench and covering with ...
Shifting of Sub-LT Panel from Laundry Block to PGT Hostel with allied Electrical Installation work for construction of Working Women Hostel by demolishing Laundry Block, Garage and kitchen for NTS in the premises of Chittaranjan Seva Sadan COGCH, Kol
Laying of one cable upto 150 sqmm through existing ...
PACKAGE (A) BENGALURU DIVISION CLUSTER - CONSTRUCTION OF SHRAMIK RESIDENTIAL SCHOOLS (9Nos.) (FROM 6TH STD TO 12TH STD) AT 1. Begur Village, Hosakote Taluk, Bengaluru Rural District (SLICE-1), 2. Yelesandra Village, Bangarpete Taluk, Kolar District (SLICE-2), 3. Hulugalagunte Village, Hiriyur Taluk, Chitradurga District (SLICE-3), 4. Siddapura Village, Pavagada Taluk, Tumkur District (SLICE-4), 5. Narayanaswamykote Village, Bagepalli Taluk, Chikkaballapura District (SLICE-5), 6. Sidlipura Village, Shivamogga Taluk & District (SLICE-6), 7. Turuchighatta Village, Davanagere Taluk & District (SLICE-7), 8. Rayasandra Village, Kanakapura Taluk, Bengaluru South District (SLICE-8) and 9. Anekal Taluk, Bengaluru Urban District (SLICE-9).
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 sqmm to 25 sqmm
PROVN OF RAMP, HARD STANDING, FIRING POINT INTERLOCKING TILES AND HIGH MAST LIGHT AT MIL STN KOTA
... pier holes, etc. or for cable laying or not exceeding 10 sqm ...
REPAIR MAINT TO HIGH TENSION HT KV SYSTEM, BREAKERS RMUS REPAIR REWINDING OF DISTRIBUTION TRANSFORMERS DEHYDRATION TOPPING UP OF TRANSFORMER OIL INCLUDING ALLIED WORKS UNDER GE DSSC WELLINGTON
Supply and laying cable XLPE insulated screened, ...
PROVISION OF 30 KG HEAVY DUTY WASHING MACHINE, DRYER TUMBLER, FLAT WORK DRYING IRONER AND 10 KVA UPS FOR PATIENT LOUNDRY AT MH AHILYANAGAR UNDER GE (N) AHILYANAGAR
Supply and laying cable XLPE Insulated screened ...
Formation of Desilting of Infiltration wells and Intake wells,Replacement of damaged connecting main and Replacement of cables CWSS to Verkilambi and CWSS to Kaliyakkavilai
Laying the above cable as per IE rules from the between Transformer to the panel board below Ground level
Supply and Fixing of different Electrical Spares for day to day maintenance activity at Eco Park New Town Kolkata under WBHIDCO
Supply and laying of flexible cable size:3c x 4-Sqmm, Cu. Make: Gloster/Havells/ polycab
REPAIR/REPLACEMENT AND CONVERSION OF OVERHEAD UTILITIES TO UNDERGROUND SYSTEM AT ELECTRO OPTICS SENSOR PERFORMANCE VALIDATION SITE AT MUSSOORIE OF IRDE UNDER GE(I) RND DEHRADUN
... required slope/gradient for laying cables/pipes etc. complete all ...
As per tender documents
... unwashed dry river sand for underground cable 8 cm before laying cable and 15 cm after laying and ...
As per tender documents
... unwashed river sand for underground cable 8 cm before laying cable and 15 cm after laying and ...
15/2026-27/EDC R System improvement works of 11 KV and LT line and other electric works under Business Plan 2026-27 under jurisdiction of EDC, Rampur
Laying of Cable by drilling and digging as RESPO Norms and as per direction of Supervising Engineer
SITC of Concealed type Air conditioning Machines and E.I work at Surgical OPDs(Faculty Room No. 2,3 and 5) under Extended Surgical Building of Calcutta National Medical Collage and Hospital, Kolkata.
Supply and laying Control copper Cable (PVC insulated & unshethed,unarmoured) ...