Providing additional 2rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gullapur in Uttar Kannada District in 33KV S&L Division, Uttar Kannada on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Neginhal in Bailhongal Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Construction of 06 nos of 11kV link lines for a distance of 18.0 Rkm from various substations in Khalaghatagi and Kundgol subdivisions of Dharwad district on Total Turnkey Basis.
A= Maximum value of Distribution network work executed in any one ...
Construction work of temporary Media Center by German Hanger in Haridwar under Kumbh Mela-2027. (On rental basis).
... not included. The power distribution network shall includes following ...
Construction of OHT, Tube Wells, Pump House, Toilet, Boundary wall and Laying and jointing of Herbertpur Pumping Water Supply Scheme under Amrut-2.0 Programme
Equipment for distribution network to control NRW (DMA-I)
REPAIR REPLACEMENT OF INTERNAL WIRING AND ALLIED WORKS OF SUB STATIONS AND PUMP HOUSES AND OTHER EM INSTALLATIONS UNDER GE UTILITY AMBALA
... complaints of internal electric distribution network ,LED lights ,switch socket ...
Construction of New District Jail at Asham Bandipora.
Ditto; but 25mm (1") nominal bore (Corridor distribution networks)
C/o CHC Building at New Dari, Leparada District
... operation of the VRF refrigerant distribution network.
Water Supply Improvement Scheme in Khammam Municipal Corporation under UIDF funding in Package-III
Supply , Delivery, Lowering, Laying, jointing and testing of DI K7 & HDPE distribution network (DI.K7 &HDPE) .
CLEANING OF OH AND UG WATER SUMPS, SEWAGE SUMPS, EXTERNAL PAINTING OF RCC AND IRON STRUCTURES, PAINTING OF PLANTS AND EQPTS IN EM INSTALLATIONS AS PER COLOUR CODE INCLUDING SOME ALLIED WORKS AT MIL STN KANCHRAPARA UNDER GE BARRACKPORE
... diffusers with unserviceable distribution pipe network of STP 300/350 Cum/Day including ...
Construction of 10 Bedded Hospital at 9th Bn ITB Police, Lohitpur (Ar.P)
... erecting the complete air distribution network routed as per drawing, comprising: ...
Construction of 10 nos of 11kV link lines from various sub stations for a distance of 53.79 Rkm in Savadatti subdivision of Bailhongal Division on Total Turnkey Basis.
A= Maximum value of Distribution network work executed in any one ...
Construction of 03 Nos. of new 11KV lines using 11KV UG cable from 110/11 KV Sadashivnagar and Fort substations for a distance of 9.27 RKms in Belagavi CSD-1 Subdivision of Belagavi Urban Division, HESCOM, on Total Turnkey Basis.
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Athani in Athani Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally).
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11kV power transformer at 33/11kV sub-station Tadavalaga in Indi Taluk, Vijayapur District in 33KV S&L Division Vijaypur on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Gandigwad in Khanapur Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Construction of 220/132KV, 2X160 MVA AIS Substation at Morigaon along with associated transmission lines, (Package P-II-E)
... Supply and Installation of distribution network with CPVC pipe of 40 mm ...
Set up of Mechanized Laundry within the compound of Naihati State General Hospital, North 24 Parganas - SITC of 1000 KVA Electrical Power Substation including allied Electrical works.
Supply & delivery of 12" sweep, 1370 r.p.m. heavy duty Metal Body Exhaust fan complete with all accessories having the following Model/ Cat No. [Make - EPC Electrical Pvt. Ltd.]
EXPANSION, DIGITIZATION AND OTHER RELATED CIVIL WORKS OF THE ELECTRICAL MUSEUM LOCATED AT THE IT TRAINING CENTRE AGRA.
... 220/132 kV and 132/33 kV Grid Substations, Power Transformers, Current ...
Construction of 01 nos of 11kV link line and conversion of 06 nos of over head line by UG cable from 33/11kV GI sub station, Vidyagiri, Dharwad for a distance of 3.77 Rkms in CSD-1 subdivision of Dharwad Urban Division on Total Turnkey Basis.
A= Maximum value of Distribution network work executed in any one ...
Reconductoring of 21 Nos of 11KV lines for a distance of 205.75RKms in Bijjaragi Section of Tikota Sub Division of Vijayapur Division on Total turn key basis.
A= Maximum value of Distribution network work executed in any one ...
Reconductoring of 6 Nos of 11KV lines for a distance of 49.62RKms in Rural section of Vijaypur sub division in Vijayapur Division on total turn key basis.
A= Maximum value of Distribution network work executed in any one ...
Replacement of existing 2 X 5MVA by 2 X 8 MVA Power Transformer at 33/11 KV Sub-station Hebale,Bhatkal subdivison in Bhatkal Taluk. Uttar kannada District on Total turnkey basis
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Hulkund in Ramadurga Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Construction of 05 Nos. of new 11KV lines using 11KV UG cable from 110/11 KV Fort and Neharunagar for a distance of 9.02 RKms in Belagavi CSD-3 Subdivision of Belagavi Urban Division, HESCOM, on Total Turnkey Basis.
A= Maximum value of Distribution network work executed in any one ...
Additional Patalganga Industrial Area.......Providing Power supply infrastructure to plot no M-1 and M-2 at Sarsai
... no.04 Providing 22KV O/H Distribution Network at plot no M-1 & M-2 at ...
Supply installation testing and commissioning of S&T material in connection with following work:- 1)Godhra-Nagda section: : Safety and reliability improvement and replacement of defective/overaged midlife signaling gears and equipment. 2)- Enhancement, Replacement and Strengthening of Existing Earthing System for Vital S&T Installation by RDSO approved Earthing system. 3)-Ratlam Division: Replacement and upgradation of analog 25-watt VHF sets by Digital VHF sets.
... shall use piping or tubing distribution network that shall run from the ...
PROVN OF FIRE ALARM SYSTEM AND SMOKE DETECTION SYSTEM AT CERTAIN LOCATIONS AT AF STN FARIDABAD UNDER GE (AF) FARIDABAD
... Hooter strobe Peer to peer Networkable, support distributed loop architecture and Provision ...
Electrical Works relating to Construction of 24 Bed Hybrid Critical Care unit within the premises of Malda Medical College and Hospital, Malda-SITC of Bed cum Passenger Lift. (Electrical Work) - EI Work
Supply of 240V, 50 Hz, 300 mm (12") sweep, 920 RPM, 48 Watt heavy duty A.C Exhaust fan complete with all accessories (Make- EPC Electric Pvt. Ltd.)
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Kallolli in Gokak Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK Basis (5 MVA Power Transformer and other allied materials will be supplied by departmentally) (Reserved for CATII(A) category)
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11kV power transformer at 33/11kV sub-station Horti in Indi Taluk, Vijayapur District in 33KV S&L Division, Vijaypur on PTK basis (5 MVA Power Transformer will be supplied by departmentally).
A= Maximum value of Distribution network work executed in any one ...
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Nesaragi in Bailhongal Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Construction of OHT Tube Wells Pump House Toilet Boundary wall and Laying and jointing of Rising Main and Distribution system of Sankriti Lok Colony Water Supply Scheme under SASCI Programme.
Distribution Network Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
External Electrification work for 192 N.G.O. Qrts., at Police Line, Ujjain (33/11 KV Sub station and 11/0.4 KV, 7x200 KVA Transformer with H.T. Line and Street Light)
... equipment (like 33 kv ,2x5 MVA grid substation) in the substation should ...
NIT 27 Work of Augmentation of RWSS Jaisinghpura Nathawatan to provide FHTC including one year defect liability period under JJM in the jurisdiction of PHED Sub Division Govindgarh, District Rural Division -II, Jaipur
... charge. Hydraulic Design of Distribution network in Loop/Water Gem/EPANET ...
C/O WATER SUPPLY SCHEME AT BHIMNAGAR TAL. JIWATI
SUBWORK NO 05 : DISTRIBUTION NETWORK - 6 Item No. 1 : Excavation ...
ASOM_MALA_3.0_25_26_50 Improvement / Up-gradation of Road from Gogamukh to Selamukh (From Ch. 35.428 K.M. at Namoni Borkhamukh to Ch. 44.428 K.M. at Jengraimukh) (Phase-I) under Asom Mala-3.0 for the year 2025-26.
PHE/Job-1 :- Utility shifting and relaying distribution network of PHE pipes under Executive Engineer, PHE, Ghilamara Division, Ghilamara
Augmentation of Piped Water Supply Scheme of Village Kishanpura GP Kishanpura for providing functional household tap connections under JJM, Tehsil Chomu, District Jaipur
... charge. Hydraulic Design of Distribution network in Loop/Water Gem/EPANET ...
PROVN STAND BY 33 KV CABLE FROM JBVL STN TO MAIN RECEIVING STN ALONGWITH AUGMENTATION OF ASSOCIATED INFRA AT 11 KV SUB STN AT DIPATOLI
... installation in electrical distribution networks, operational flexibility ...
Construction of (Gplus4) Storied 50 Bedded Critical Care Block at Bankura Sammilani Medical College and Hospital Campus, Bankura --- Residual Electrical Installation Work.
Supply of 230V , 50 Hz Heavy Duty Exhaust fans of following diameter complete with all accessories as per direction of EIC. ( Make -EPC Electrical Privet Limited )
Rehabilitation and Improvement of Sewerage system for Sector-6 and 7 within CDA under Municipal Corporation, Cuttack including O and M period of 5 years
Road restoration works for laying of Distribution Network
North Fulung PWSS under SOPD-G for the year 2025-26
Laying of Distribution Network including constructon of ...
REPAIR MAINT OF PERIMETER STREET LIGHTS DG SETS LAS REPAIR / REPLACEMENT OF INTERNAL WIRING AND REPAIR MAINT OF EXTERNAL WATER SUPPLY AT AF STN DEVLALI UNDER GE AF OJHAR
... various HT breakers across the distribution network of 25ED /11BRD under GE ...
COMPREHENSIVE MAINT OF CERTAIN WATER SUPPLY INSTALLATION ALONGWITH CONNECTED ITEMS AT 11 BRD AF STN OJHAR UNDER GE AF OJHAR
... various HT breakers across the distribution network of 11BRD under GE AF Ojhar ...
Construction of RCC ESR, UGR, Sunken Pump House, CC Road, Compound Wall, Laying of DI CWRM and Distribution Pipeline, External and Internal Electrification and Instrumentation Works with Pumping Arrangement, etc.
Laying of Distribution Network Supplying all labour, T&P ...
FOR SHIFTING OF 33KV LINE, 1IKV LINE, LT. LINE AND OTHER ASSOCIATED WORKS DUE TO WIDENING OF DHAULANAPILKHUWA- BHOJPUR ROAD IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDDPILKHUWA UNDER EDC HAPUR.
... shall coordinate with the grid substation staff, manage formal permit-to-work ...
Providing additional 3rd 5 MVA, 33/11KV power transformer at 33/11KV sub-station Khanapur in Khanapur Taluk, Belagavi District in 33KV S&L Division, Belagavi on PTK basis (5 MVA Power Transformer will be supplied by departmentally)
A= Maximum value of Distribution network work executed in any one ...
Supply, Installation, Testing and Commissioning of Signalling material in connection with Ranayala Jasniya Station: Provision of EI system at Left Over PI station in Dewas-Maksi Section.
... shall usepiping or tubing distribution network that shallrun from the detector ...
Repair of OHT Construction of Tube Well Pump House Laying and Jointing Rising Main and Distribution Systems Consisting of proper completion of the work of Clement Town Cantt Water Supply Scheme under UIDF Programme
DISTRIBUTION NETWORK Providing of all materials, ...
Construction of ESR, UGR along with laying of pipeline including other ancillary work in Kesinga NAC
Laying of distribution network Cutting asphalt or bituminousof ...