Loading…
Loading…
81 live23 closing this weekmost from Public Works Department and South Western Railway
81 results • Best match
Construction of Foot bridge near Narayan B Kunabi House Konal Majare in Dongri Panchayat of Ankola Taluk during the year of 2026-27
Construction of Foot Bridge over the stream crossing the road that connects Gonisomanahalli village to State Highway 267 in Halebidu Hobli, Belur Taluk.
Construction of Foot Bridge near Kenchigende Santhosh Shetty House in 34th Kudi Village under Kokkarne Grama Panchayth of Brahmavara Taluk(Reserved for CAT-IIA)
AVC-KTY Section: Reconstruction of Existing Retaining Wall Parallel to Track at ROB Nos. 207, 208, 263, and 264, and Provision of Crash Barriers on ROB Approaches at ROB Nos. 207, 208, 219, 233, 263, and 264 in ADEN/DVG sub- division.
Proposed construction of ROB at LC no 287 between BDKA-UNK section
Construcrion of Foot Bridge
Construction Of Foot Bridge
Construction of Foot Bridge
Construction of bridge on Kanakagiri to Yathnati at km 15.90 in Kanakagiri taluk Koppal district.
Construction of foot bridge near yashaswi ice plant in Kola ward Construction of kanganabettu ramesh house to nithyananda shetty house road in Kodankoor ward and Asphalting of Vasuki nagara 5th cross road in Badagubettu ward
Construction of bridge from Wagdhari to Muradi village in Aland Taluka under 5054 for the year 2025-26.
1) Provision of two lifts each at PANP, JRU, BYD and NTW railway stations on the existing FOB (Total 8 lifts). 2) Provision of one lift each at PF-1 and PF-2 on existing FOB at AJP and one lift on main entry to railway station at DRU (Total-3 lifts).
Construction of Bridge cum Barrage in Selected reaches of Varada and Dandavathi River in Soraba taluk of Shivamogga District
Construction of bridge cum vented dam at Aramanakatti Santhyaru in Kinya village of Ullala taluk in Dakshina Kannada district
Construction of bridge from Muddaga village to V.K.Salgar main road in Kamalapur Taluka under 5054 for the year 2025-26.
CONSTRUCTION OF BRIDGE NEAR HANUMAN DEVASTAN IN CHONDI VILLAGE IN BIDAR TALUKA OF BIDAR DISTRICT. UNDER 5054-80-190-0-01-132-KRDCL FOR THE YEAR-2025-26
Construction of bridge at Karimani-Marakumbi Vhaya Chikkop MDR at km 5.30 and km 6.20 in Bailhongal constituency, Savadatti taluk, Belagavi district.
Hubballi Division-Improvements to approach Road for RUB 237A at Km.482/345 at Navalur Yard between UBL-LD section. (Maintenance Period - 12 Months).
Construction of Bridge Markumbi-Chachadi via Harugoppa Major District Road at Km 4.75 in Bailhongal Taluka in Belagavi Dist. of Bailhongal Constituency for the Year 2026-27
Construction of bridge across Gangavali River at Ch. 0.00 Km of Gullapura - Kodlagadde Major District Road connecting Gullapura village to Heggar village in Yellapur Taluk, Uttara Kannada District.
Reconstruction of damaged pipe outlets under NRBC, Reconstruction of damaged pipe outlets under NLBC, Construction of Bridge across Nugu Right bank canal at ch 0.60 km, Construction of Bridge across Nugu Right bank canal at ch 16th km, Construction of Cut & Cover deck at Ch 25.40 Km in deep cut of Nugu Right Bank canal & Re Construction of DPO s of Rampura Canal in Nanjanagudu Taluk
CONSTRUCTION OF BRIDGE ACROSS NETHRAVATHI RIVER FOR CONNECTING SAJIPANADU AND TUMBE VILLAGE IN BANTWAL TALUK, DAKSHINA KANNADA DISTRICT. (DESIGN, CONSTRUCTION & MAINTANANCE OF BRIDGE AND APPROACH ROAD WORK ON TURNKEY BASIS)
FLOOR END PROFILE,L=2000MM, as per Drawing: LW41112, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH.
Construction of Checkdam cum bridges across halla at Venkatapura-Siddapura to Nagatihalli village road and across halla at Chikkur to Sankondanahalli village road in Banavara Hobli , Arsikere Taluk, Hassan District
Construction of Bridge at Ch. 3.90 km on Road joining from chilur-Nyamathi Jeenahalli ( MDR) to Bagalakote Biligiriranganabetta (SH-57) Road ( Via Arundi-Kanive-Joga-Suragondanakoppa Chinnikatte) (Near Rameshwara Village) in Honnali Taluk Davanagere District.
Package No.AP02PIVLSB10 L021-Anantapur Bellary road to Ramachandra puram Construction of bridge across maruva vanka in Anantapur - Bellary road to Ramachandrapuram of Kudair Mandal Est. cost Rs.321.5 Lakhs
SW-I: HAS-SKLR section: Proposed closure of LC No. 39 at Km. 35/300-400 by diverting traffic through LC No.38 at Km. 34/900-35/000 duly constructing road parallel to the track between LC No. 39 to LC No 38.SW-II: MYS-HAS SECTION: Proposed closure of ... through ROB No. ... AND ROB No.145B
(1)Provision of two lifts each at PANP and BYD Railway stations on existing FOB. (2)Provision of Gents ,Ladies waiting rooms, Toilet block at PF2, Full length PF shelter at PF1 and PF 2 at PANP and waiting room and parking development at S.
[i] SBC-JTJ Section: Proposed construction of RUB at trespassing location at km 339/300-400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works[ii] SBC-JTJ Section: Proposed construction of Pedestrian subway at Km.230/000-100 between PU-MAR ... SSP/SP, FOB and ... in RUB 85A ...
Construction of cartbridge at Ch60.25km (near (Ch61.250km) Masage Village) of KRBC,Construction of cartbridge at Ch68.15km (near Echagondla village) of NHLC,Construction of cartbridge to halla at Uppinahally village under Uppinahally pickup ... village, Construction of Bridge across ...