Loading…
Loading…
1,628 results • Best match
Construction of Minor Bridges at Asundi Village Ballari District.
DEN/South/SBC section : Proposed Foot Over Bridge (FOB) at Sivadi (SZV) station of Salem-Bangalore section. Maintenance period is 12 months
Bagalkot-Kudchi New BG Line Project: 1. Construction of New RUB Br.No: 103A by cut and cover Method and diverting LC-01 and LC-02 to new RUB between Khajjdoni and Lokapur stations. 2.Construction of Balance Super structure of ROB Bridge No.107 at ... +14x24m PSC Girder + ... 1x29.0m PSC Girder , ...
Proposed Yard Remodelling work at Amritapura Station yard & Y-Connection to MMEC from Amritapura Station for Civil works like extension of Minor Bridges, RUB, Construction of Minor Br, FOB, High Level Platform, Goods Platform, Miscellenous, Station Building including Electrical Genl. and TRD at Amritapura yard.(COMPOSITE WORK)
Construction of ROB in Lieu of LC No.92 at Km:126/500-600 with 1x30m composite girder and 3x20m PSC girder (NH Side) + 2x20m PSC girder (Gollapalle Village) + RE Blocks between Molakalmuru-Rayadurga Stations in JRU-RDG Sections (Composite Work)
DEN/South/SBC sec : Proposed Foot over Bridge (FOB) at Shantigrama (SIGA) station of Hassan - Bangalore section under ADEN/Kunigal subdivision. Maintenance period is 12 months
Repairs to Bridge Railings, Revetment and Painting works to Major Bridge at K.6.80 of Mangalapete Thalipadi MDR in Mulki Taluk
Construction of ROB in lieu of LC no. 97 @ Km:121/600-700 as 1x36 m Composite Girder (Railway portion) + 3x18.71m PSC Girder(Kirangoor end) + 6x18.71m PSC Girder (Rampur end) + 3x28m PSC Girder (Rampur end) + RCC retaining wall (approach portion) and proposed Limited height subway at km:121/540 as 1x5x2.5m RCC box Between Panadavapura and Srirangapattana stations (Composite work)
Foot bridge work at Wno 10 Behind Kundeshwara Temple in TMC Kundapura limits (Cat-IIA)
Construction of foot over Bridge (FOB) for halt station in Gadag- Hotgi (GDG-HG) section (03 Nos Kudalasangama, Angadageri, Somanakatti) and subway at Honaganahalli, Padnur and Sulerjavalagi station.
Consultancy services for preparation of DPR for the work of Construction of ROB RUB ROB at Kengeri Sattelite Town and RUB at Ramohalli Gate at Yeshwanthpur Constituency.
TIPTUR TALUK CONNECTING NH 206 VIA HINDISKERE ARALUGUPPE MINOR BRIDGE CONSTRUCTION AT CHIANGE4.5 KM
Foot bridge Construction
1) Bagalkot- Kudchi new line project proposed construction of ROB at Ch 35068 in lieu of LC No 1 as 1x18m Composite girder (Railway portion) +2x18.46m PSC Girder and U Type retaining wall + CC block wall in approaches, 2) ROB at Ch:36593 in lieu of ... girder+2x18.46m PSC Girder and ... 3) ROB no ... 18.46m PSC girder and ...
DEN/South/SBC Section: Proposed extension of Foot Over Bridge (FOB) at Karuvalli(KVLR) station in ADEN/Dharmapuri Section.(Size of Gangway- 1x3.0mx27.00m,Staircase-1x27.00mx3.0m+1x27.0mx3.0m)). Maintenance period is 12 months
Construction of 7 Minor Bridges on NH 150A from Km 142.00 to 171.00 on EPC Mode in the state of Karnataka
Construction of Bridge work at Madyarabettu Poonacha village in Bantwala taluk
Londa-Miraj section-Construction of ROB at Km.613/800-900 in lieu of LC No 392 between Belagavi-Sambre stations as 1x36m Composite Girder clear span ( Railway Portion) with 5x18.71m PSC Girder (NH end) and 6x18.71 m PSC girder (Mutaga end) and CC block in approaches between Belagavi and Sambre stations. (Composite Work)
Design and Construction of formation in embankments, cutting including blanketing, Major bridges, Minor bridges, RuB, ERS/retaining wall, sacrificial retaining wall, drains, boundary wall ,fencing works and Station boxes of Nagawara and Kanakanagar
TIPTUR TALUK ROAD CONNECTING CHIKKANAYAKANALLI TO MADHYA HADAGALI ROAD VIA DODDAMARAPANALLI BYDARALLI MINOR BRIDGE CONSTRUCTION AT CHAINAGE 5.77KM
Construction of Bridge at ch-22.60km of Anvery Branch canal Near Channamumbapura Village of Honnali taluk (Including foot bridge and service road)
Construction of Bridge work at Odoli in the area Kombaru Village Puttur Taluk
Penukonda - Sri Satya Sai Prashanthi Nilayam - Dharmavaram section : Proposed Foot Over Bridge (FOB) to connect PF - 1 to PF - 2 at Basamapalli (BSPL) station at km 38/275 in ADEN/Hindupur section. Maintenance period is 12 months
Construction of Bridges on Kanakagiri to Yathnatti MDR Road at KM 11.70 & 13.90 in Kanakagir taluk Koppal district.
Construction of Pedestrian bridge for crossing of canal towards boundary at ICAR IIHR Farm Hirehalli, Tumkur
Construction of Foot Over Bridge at Km. 331.600 of NH150A near B.G.Kere village between the stretch of Byrapura Challakere section and Foot Over Bridge at Km. 341.960 near Government Polytechnic College Moraba on NH50 old NH13 of Hospet Chitradurga S
SW 1:-Construction of 2 lane ROB in lieu of LC no.1 as 1X30.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Amaravathy Nagar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Desihalli)(Approach Span)+ RE Blocks and ... lane ROB in ... 3x18.71m PSC Girder +1x10.5m ... 2x18.71m PSC Girder +1x10.5m ...
TIPTUR TALUK ROAD CONNECTING CHIKKANAYAKANALLI TIPTUR TO MADHYA HADAGALI ROAD VIA DODDAMARPANALLI BYDARALLI ROAD MINOR BRIDGE CONSTRUCTION AT CHAINAGE 10.10KM
Hubballi Division:- Providing height gauge at the approaches of bow string arch road over bridge girders at ROB no.2A between Londa-Gunji (LD-GNJ) stations, ROB no.121A (3rd gate) between Desur-Belgaum (DUR-BGM) stations, ROB no.126A (BGM yard DUR ... stations, ROB no.164/A ... and ROB no.181B ... SSE/ Bridges /BGM ... of bridges 6 ...
CONSTRUCTION OF FOOT BRIDGE AT HOSA VANTMURI VILLAGE IN BELAGAVI TALUKA YAMAKANMARDI CONSTITUENCY UNDER H/A 5054 KRDCL BRIDGES FOR THE YEAR 2025-26
MINOR BRIDGES
Re-construction of Bridges at Ch 1.80 km and Ch 2.30 km (near Kadajji village) in HPD under Davanagere Branch canal
CONSTRUCTION OF BRIDGE WORK AT HOGE BAILU CHAINAGE 4.90 KM OF JAYAPURA -KOPPA ROAD KOPPA TALUK
Construction of Foot over Bridge FOB at Km 24.850 Old Chandapura for Remedial measures to accident prone locations in the stretch of Silk Board Junction to Attibele Km 8.765 to Km 33.130 of NH 44 in the State of Karnataka Second Call
Construction of Bridge work on Sarovar street main road at ward no.04 Under tmc devanahalli limits
ADEN SKLR Sub Division : HAS-MAJN SECTION: REHABILITATION OF GIRDER BRIDGE NO.20 (RUB) AT KM.5/500-600 IN HAS-ALUR SECTION DULY REPLACING EXISTING STEEL GIRDER WITH CAST IN SITU RCC BOX
Re Construction of Bridges and Karadihalla Pickup at CH 5.00 KM, CH 11.01KM , CH 15.00 KM and CH 16.60 KM of Malebennur Branch Canal
Construction of Bridges at CH 6.70 km, 20.60 km and 24.10 km on Navalgund Gudageri State Highway - 266 of Annigeri taluk of Dharwad district.
Bengaluru-Sampige road section: Proposed extension of existing Foot over bridge (FOB) at Nidavanda (NDV) from PF no 1 to circulating area with stairs and provision of 1 lift at Nidavanda station.(Size: Gangway=1x15x3.3m=49.50 Sqm. Size: Stairway=1x15.70x3.3m = 51.81 Sqm). Maintenance period is 12 months
Foot Bridge
Reconstruction of Minor Bridges at Km 54.50, 64.20, 72.30, 80.60, 82.90, 91.40 and 93.010 of NH766C, Byndoor- Ranebennur Section in the state of Karnataka on Engineering, Procurement and Construction (EPC) Basis Contract
Reconstruction of Minor Bridges at km.26.05, Km.27.07 and at 28.14 on NH169A Thirthahalli Udupi section in the State of Karnataka on EPC mode. (Job No.NH-169A-KNT-2019-20-899)
TIPTUR TALUK ROAD CONNECTING FROM NONAVINAKERE GUNGURUMALE ROAD TO CHANNARAYAPATNA BORDER VIA NONAVINAKERE VIGNASANTHE BAJAGUR BALLEKERE HUNASEGHATTA SASALAHALLI MELANAHALLI MINOR BRIDGE CONSTRUCTION AT 8.9 KM CHAINAGE
Construction of Foot Bridge
Repairs to Major Bridge at Chainage 13.50 KM of Ammathi-Murnadu Road in Virajpete taluk (Actual Major Bridge at chainage 11.50 km).
Repair of Bridge work at Ch 7.50 Km of Road connecting from Chikkanayakanahalli to Tiptur Road (SH-253) in Chikkanyakanahalli taluk umkur District.
Bengaluru - Yeliyuru section: Construction of Foot Over Bridge (FOB) at km 55/200 at Channapatna (CPT) yard near LC No. 47 (Gangway: 32.0 x 3.0m, Stair case: 2 x 3.0x 20m) for pedastrian movement. (4T Crossings). Maintenance period is 6 months or one monsoon period whichever is later.
Construction of Foot Bridge
TIPTUR TALUK ROAD CONNECTING FROM BASAVARAJAPURA TO HONNAVALLI HIRIBIDRE PONNASAMUDRA TALALURU HARANAHALLI JAVAGAL DHARMAPURA JODILINGADAHALLI NIDGHATTA MELANAHALLI JOINING ROAD (SH 255) MINOR BRIDGE CONSTRUCTION AT 13.60KM CHAINAGE
Construction of Foot Bridge