Loading…
Loading…
1,640 results • Best match
RECONSTRUCTION OF DAMAGED BRIDGES DUE TO HEAVY RAIN AT CH.85.50 AND CH.85.57 KM OF MADIKERI-KUTTA ROAD(SH-89) IN PONNAMPET TALUK (KUTTA)
REPAIR OF BRIDGE AT KM 7.20 OF BAGPUNI-MANIBANDA-GUNDYA-KULKUNDA ROAD IN BILINELE VILLAGE, NETTANA RAILWAY STATION JUNCTION-BOTTADKA-KEJALA JUNCTION- KOMBARU VILLAGE WITH CONSTRUCTION AND REPAIR OF SIDE DRAINS FROM KM 7.50 TO 9.00
1) Extension of PF No. 1 to 450 Mtr. with High level and other amenity works at MVC (MAVINKERE). 2) HLN - ASK section - Proposed construction of foot over bridge (3 Mtr wide) of clear span 1 No. 11.33 Mtr with stair case facility at Km 104/100 between MVC - HAS stations to eliminate un authorized crossing. 3) Up gradation of existing coach watering arrangement to quick coach watering system in Platform No. 1 at Hassan (HAS) station. 4) Construction of service rooms in C&W depot at ASK (Arsikere).
1) Extension of PF No. 1 to 450 Mtr. with High level and other amenity works at MVC (MAVINKERE). 2) HLN - ASK section - Proposed construction of foot over bridge (3 Mtr wide) of clear span 1 No. 11.33 Mtr with stair case facility at Km 104/100 between MVC - HAS stations to eliminate un authorized crossing. 3) Up gradation of existing coach watering arrangement to quick coach watering system in Platform No. 1 at Hassan (HAS) station. 4) Construction of service rooms in C&W depot at ASK (Arsikere).
Watch and Ward services to RnD Estates at DRDO Township Phase - III including ROB Gate, J Gate, K Gate, Kalam Sadbhavana Park, EMU Gate and Common and Amenities gates Bangalore
Construction of ROB in lieu of LC No 51 Bengalure Mysore Railway Lane near Byrapatna of SH road connecting BM road at Byrapatna via Devarahalli in Channapatna Taluk Ramanagara District
Watch and Ward services to RnD Estates at DRDO Township Phase-III including ROB Gate, J Gate, K Gate, Kalam Sadbhavana Park, EMU Gate and Common and Amenities gates Bangalore
Construction of Boox Culvert on Road from Ankali-Hanumasagar Connecting Hosuru (SH-26) SH-256 at Km 81.23 & 82.68, Constructioin of Crash Barrier and Repairs to Bridge at Km 91.75, and Repairs to Box Culvert Km 105.30, 105.90 in the year 2025-26 in Hirekerur taluka of Haveri District (RESERVED FOR SC CATEGORY)
Bridge repair work in Kothabalar Talihal Honniganur Sajpur Road at km 1.00 and 2.80 and CD repair work in Chikkamannur Hiremannu Mudenagudi of Road at km 11.65 in Rona Taluk Gadag Dist.
CONSULTANCY SERVICES FOR CONCURRENT MONITORING AND THIRD PARTY EVALUATION FOR THE WORK OF CONSTRUCTION OF BRIDGE CUM BARRAGE FOR HALLA IN GANESHPURA VILLAGE IN HD KOTE TALUK MYSURU DISTRICT
Construction of bridge and Improvements to road from Gangaravalpalli to Shahabajar village in Sedam Taluka Kalaburagi District Under 5054 for the year2024-25 (for CAT-II(A) Bidders only)
Preparation of DPR for Construction of Bridge at km 1.60 across HLC in Malapanagudi (SH-49) to Ingalagi Cross(NH-67) via ingalagi road in Hosapete Tq Vijayanagara district
Construction of Bridge across the waste weir of Yadamaranahalli tank near the land of Krishnappa and other protective works in Doddalahalli village of Doddalahalli G.P, Kanakapura taluk, Ramanagara District
Construction of Bridge Cum Barrage Across Local Nala Between Lingadalli - Handral Village and Construction of Checkdam Site-01 & Site-02 in Jambaldinni Village in Muddebihal Taluka of Vijayapura District.
Construction Of Bridge To Halla And Development Of Road At Nagarbenchi Village At Maski Constituency In Lingasugur Taluk Of Raichur District. Under CMIDP Fund For The Year 2025-26
Conducting survey & preparation of detailed project estimate for the Construction of Bridge to Dodda Halla (Mudigere Constituency limits) of Devarunda-Japavathi road in Gonibeedu Hobli of Mudigere Taluk Taluk.
Construction of bridge at km 24.70 and 24.90 of Hampi-Kamalapura-H.B.Halli State Highway-131 in Sandur Taluk, Ballari District, under 4059-CMIDP Projects for the year 2025-26
Construction of bridge at Km 12.30 in Hiresindhogi to SH-23 via Katralli-Kolur-Dadegal-Madinur-Kinnal-Kalakeri-Kamanur-Kukanapalli-Indaragi SH-211 road in Koppal Taluka Koppal Constituency
SUB ESTIMATE FOR PREPARING REPORT ON THE SOIL INVESTIGATION FOR THE PROPOSED CONSTRUCTION OF BRIDGE CUM CHECKDAM FOR SUVARNAMUKHI RIVER BETWEEN SAMUDRAHALLI AND MYADANAHOLE IN HIRIYURU TALUK CHITRADURGA DIST
CONSTRUCTION OF BRIDGE ON TURVIHAL-TIDIGOLA MDR ROAD AT KM 7.00 IN MASKI CONSTITUENCY,MASKI TALUK,RAICHR DIST UNDER KRDCL LIMITED CAPITAL EXPENDITURE FOR THE YEAR OF 2026-27
CONSULTANCY SERVICES FOR SURVEY WORK FOR THE WORK OF CONSTRUCTION OF BRIDGE CUM CHECK DAM AND PROTECTION WALL NEAR ST LANDS AT MULLUR VILLAGE IN SARGAURU TALUK MYSURU DISTRICT
Construction of Bridge at Sureban-Kudalasangam SH-133 Km. 9.45 in Badami Taluka Bagalkote Dist. Under H/A 5054-80-190-0-01-132 for the Year 2025-26
Construction of Bridge and Approach Road on Ballari-Badanahatti MDR at km 1.87 near Airport in Ballari City Constituency Under 5054-KRDCL Capital expenditure for the year 2026-27.
Re- Construction of Bridge at Ch 53.50 km of Chinthamani(SH-82) to Gowribidanur via Chelur - Bagepalli - Yallodu - Mallenahalli Cross - Vatadahosahalli SH-259 road in Bagepalli Taluk, Chickballapura District
Construction of Bridge at Km 8.00 on Shattihalli Inchalakaranji SH78 in Hukkeri Taluka of Belagavi Dist for FY 2026-27 Under H/A 5054-80-190-0-01-132
Bridge Protection works
SW-I Name of work:- Hubballi Division :- LD-VSG Section: Construction of RUB in lieu of LC No. 06@KM 10/200-300 in between LD-TGT station respectively by BOX pushing method. SW-II Name of work :- Hubballi Division:- LD-VSG section: construction of ... of RUB in ...
MAINENANCE OF 34 NO BRT BUS STATIONS, MITRASAMAJ BRT TERMINAL, BRT STOP AT CBT, NBS (NEW BUS STATION) DHARWAD INCLUDING FOOT OVER BRIDGES AND RAMP AREA.
Reconstruction of Delapilated Condition Bridges at ch.4.138km, 7.755km and 8.55km of Kamasamudra Toppanahalli Road to Andra Border Via Mushtrahalli, Donimadagu in Bangarpet taluk, Kolar Dt
Comprehensive Development of roads drains RCC major culverts Stormwater drains, bridges RCC drain asphalting and Concreting bad reaches in VV Puram Sub division at Chickpet Constituency
Construction of Checkdam cum bridges across halla near the lands of ST Farmers in Gavimatta to Salapura Village road in Banavara hobli, Arsikere Taluk Hassan District.
Reconstruction Of Pipe culvert at Ch.113.10 Km on Shiradon Linagasagur (SH-41) Road in Basavan Bagewadi taluk Vijayapura District(5054 SH Bridges KRDCL 2025-26)
Maintenance of bridges and culverts on Hoskote Gaunipalli (State Highway-82) Road from Ch. 23.08 km to 58.82 km in Chintamani Taluk, Chikkaballapur District.(Others Category)
BRIDGES
Construction of Bridge at Byaralagadde to Bilagali road in Sunkasale Grama Panchyat, Construction of Checkdam cum retaining wall across Somavathy halla in Binnadi village of Taruve Grama Panchyat in Bankal Hobli, Construction of Bridge at Dunduga village going road in Hale mudigere Grama Panchyat of Kasaba Hobli, Reconstruction of Bridge from Dharadahally Handuguli to Alur going road in Kasaba Hobli of Mudigere Taluk-PACKAGE1
Construction of ROB in Lieu of LC 110 at Km 108.525 and LC 152 at Km 73.25 on NH 69 Honnavara Chittoor section in the State of Karnataka on EPC mode
RRB-TLGP Section: Proposed safety improvements in the form of approach road, retaining wall and providing rail barricading at ROB No.23B at Km.16/700-800 between SPV-TKE stations
REPAIRS & RECONSTRUCTION OF CD/BRIDGE WORK ON APPROACH ROAD TO ANDURWADI VILLAGE (MDR) IN BIDAR TALUKA. AT Km. 0.50, 0.53, 0.60, 0.70, 4.80 & 5.50. (KRDCL) (RESERVED FOR SC)
CONSTRUCTION OF bRIDGE
PLUG AND SOCKET DISTRIBUTION BOARD 20A,240V AC, as per Drawing: LA72200 ALT-' a',Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
UNION, as per Drawing: G18LCF ERMETO OR EQUIVALENT WITH INFRASTRUCTURE REQUIREMENTS AS PER MDST-108 REV NIL, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB
UNION, as per Drawing: G18LCF ERMETO OR EQUIVALENT WITH INFRASTRUCTURE REQUIREMENTS AS PER MDST-108 REV NIL, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB
F.R.L.T. LOW TENSION COTTON INSULATION TAPE,CHOCOLATE, as per Drawing: ICF/ELEC/921, REV.00, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPOR
Construction of bridge on Arbhavi-Challkere Road (SH-45)at km-55.90 Across Malaprabha River backwater in Savadatti Taluk ,Belagavi District (Job No CRIF-KNT-2023-24-130)-2nd call
CONSULTANCY SERVICES FOR CONCURRENT MONITORING AND THIRD PARTY EVALUATION FOR THE WORK OF CONSTRUCTION OF BRIDGE CUM CHECK DAM FOR NUGU RIVER NEAR KURNEGALA SIDDAPURA IN SARAGURU TALU MYSURU DISTRICT
CONSTRUCTION OF BRIDGE ON MALAPRABHA RIVER BACK WATERS ON GOKAK SAVADATTI SH103 AT KM 75/800 OF HOSUR VILLAGE SAVADATTI TALUK BELAGAVI DISTRICT( Job No CRIF-KNT-2023-24-131)
Preparation of DPR For the work of Construction of Bridge cum checkdam for Anehalla in Gangaghatta Road and construction of Checkdam near Kempanakatte in Kadalagere Village Pandavapura Taluk Mandya District
Construction of bridge and road from Kodli-Rummangud main road to (via Sunthan) Sunthan Tanda in Kalgi Taluka under 5054-03-0334-0-75-422 for the year 2024-25.
Construction of Bridge-Cum-Barrage across Local Nala, Approach Road and Protection Wall Near Harakud Math in Kalagi Town of Kalaburagi District (under 4702-APB for the year 2025-26)
Construction of Bridge-Cum-Barrage across Hoovina halla including nala training in U/s and D/s coming in the premises of Sattigeri Village of Yaragatti Taluk in Belagavi district.