Loading…
Loading…
1,640 results • Best match
Construction of Bridge and pickup in Lokapavani valley near Jodihosuru village, Improvements to Road and feeder canal from Lokapavani valley to Somanahalli tank in Nagamangala taluk.
Construction of Bridge at Gudnapur gram panchayath Ajjjarni village Road SH 137 through SH 77 Road joining towards Banavasi in Sirsi taluk of Uttar Kannada District
Construction of Bridge across the Arkavathi River on the road Connecting SH-265 Rajankunte Basavanna Temple Bilijaji, Torenagasandra road to Hesaraghatta Road in Bangalore North Taluk.
CONSTRUCTION OF BRIDGE ON BIRUR SAMMASAGI SH-76 VIA AJJAMPUR, SHIVANI, CHANNAGIRI, SANTE BENNUR, DAVANAGERE, HARIHAR, KODAND TILAVALLI AT KM 140.10 IN RANEBENNUR TALUK, HAVERI DISTRICT.
AGITATOR FLEXIBLE RING NEOPREN BY-1-19155-9 AS PER DRG NO. KIOCL/PF/DF/0096, MATERIAL: NEOPRENE RUB, HOSE NEOPRENE 21” OVAC HEDR WIDTH 6” SIZE: 500 ID X 528 OD X 150 MM HEIGHT AS PER DWG NO. KIOCL/P
Preparation and submission of DPRs including Detailed Survey, Designs, L Section, Cross Section, Drawings of Roads and Bridge Works Structural designs, etc in sub-division offices Kushtagi & Yelaburga of PRED Koppal
REPAIRS & RECONSTRUCTION OF CD/BRIDGE WORK ON APPROACH ROAD TO BACKCHOWDI VILLAGE (MDR) IN BIDAR TALUKA. AT Km.0.40, 1.30 & 1.60. (KRDCL) (RESERVED FOR ST)
Improvement of two side service road at ROB of Gadag Nargund road Via Hombal near Gangimadi in Ward no-21 in Gadag tq/dist(Reserved for Catogery-IIA)
Construction of RUB s at Km 5 46 Km 7 06 Km 7 86 and Km 28 585 of NH 275K Mysuru Ring Road in the State of Karnataka
Hubballi Division:- Alnawar-Ambewadi (LWR-AVA) section: Construction of RUB in lieu of LC No. 11 @ KM 19/820 in between Shingatgeri-Ambewadi (SXH-AVA) station. (Maintenance Period:12Months).
Hubballi Division: Hospete-Bellari(HPT-BAY) section: Ancillary drain work for the RUB in lieu of LC no.94 between Gadiganuru - Toranagallu (GNR-TNGL) stations. (maintenance period=03 months)
COMPREHENSIVE OPERATION AND MAINTENANCE OF TWO NOS. WEIGH BRIDGES ON REVENUE SHARING BASIS FOR A PERIOD OF THREE YEARS AT NEW MANGALORE PORT AUTHORITY
Repairs to Bridges at Ch.10.20, 10.50, 10.95 and 11.30 KM of Kuderu to mariyala via toravalli and kasturu Road, in Chamarajanagar (2025-26)
Construction of Bridge at Km. 185.50 of Khanapurb Talaguppa SH93 and Hullunde Bridge Guddekoppa in Sidhapur Taluk Sirsi assembly constituency Job No. CRF/KNT/2016/17/1647
Construction of CC road from Kyanahalli- Chinnalli main road to Cheeri village including construction of bridge under Yettinahole project limits of Sakleshpur Taluk Hassan District Call-2
Construction of bridge across the stream at Ch.9.10 km on SH-301, the road connecting Badanavalu (NH-150A) and Veeranapura Gate (NH-81) in Chamarajanagar Taluk
Construction of Bridge at HLC Canal Distributor D-14 (Havambhavi) on NH-150A Siruguppa Road in Ballari Town, Under 8443 Deposit Grants for the year 2026-27.
Construction of Bridge on the Upstream Side and outlet No 2 for the Project 20m corrider from BTM Layout to Hosur road along Madiwala Tank Bund Road
Construction of Bridge at Km 4.80 and Km 16.90 on Tabakadahonalli-Hunashikatti-Bidaragaddi-Astakatti-Garudahonnalli road via Mukkal cross Major district road in Kalghatagi Taluka, Dharwad District.
Taking Trial Bores at Proposed Construction of Bridge, NH-13 to join Tumukur Honnavar SH-68 Road via Hasudi,Shettyhalli,Tadsa, ch-23.00 km in Bhadaravathi Taluk.
Construction of bridge to approach road from Hosalli village to Kalaburagi Sedam main road SH 10 in Sedam Taluka under DMF fund for the year 2024-25.
Construction of bridge across the stream at Ch. 23.30 km on SH-301, the road connecting Badanavalu (NH-150A) and Veeranapura Gate (NH-81) in Chamarajanagar Taluk
CONSTRUCTION OF BRIDGE-CUM-CHECKDAM AND PROTECTION WALL ACROSS THE STREAM FLOWING NEAR THE LAND OF THE SCHEDULED TRIBES PEOPLE OF MULLURU VILLAGE, SARAGURU TALUK, MYSURU DISTRICT.
Construction of Bridge At ch 1.90 KM And Ch 3.00 KM of Road Connecting From Bellara Gate (NH-69) to Dabagunte Via Ambarapura, Ramanagara In Chikkanayakanahalli Taluk
Construction of CC road and drain in Ankachari doddi village limits and Construction of Bridge across halla near sy no.48/3 Bekuppe village in Kanakapura taluk
Construction of Bridge at Chainage Km 32.90 on the Road from State Highway-58 to the Andhra Pradesh Border via Baichapura, Melya and Hunasenahalli in Gauribidanur Taluk,
Improvements to Pickups Canal Coming under the atchkat of Thonnur tank of HLBC and construction of Bridge to halla crossing Hosahalli Kuppahalli Road under D66B of HLBC.
Proposed Construction of 2 lane ROB at Km:01/100-200 in lieu of LC No.01 between Chikajajur-Amritapura stations of JRU-RDG section - Mysuru Division (Composite work)
Proposed Construction of 2 lane ROB at Km:33/700-800 in lieu of LC No.22 between Chitradurga-Balenahalli stations of JRU-RDG section - Mysuru Division (Composite Work)
Proposed Construction of 2 lane ROB at Km:33/700-800 in lieu of LC No.22 between Chitradurga-Balenahalli stations of JRU-RDG section - Mysuru Division (Composite Work)
Proposed Construction of 2 lane ROB at Km:01/100-200 in lieu of LC No.01 between Chikajajur-Amritapura stations of JRU-RDG section - Mysuru Division (Composite work)
CALL/RESET INDICATION & ANNUNCIATOR as per Drawing/Spec.No. : EDT117,Rev-A., Packing Instruction : AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION .THE ITE
CALL / RESET INDICATION & ANNUNCIATOR, as per Drawing: EDTS117, REV-A., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOU
Bengaluru - Salem section : Improvements to drainage arrangements to RUB No. 409/A at km 158/300-400 near Hosur station yard in ADEN/Dharmapuri section. Maintenance period is 6 months
Bridge repair work near Mandagale Nagar village, 64.00 km of the road connecting Gautampura (SH-766 C) to Hosabale (SH-77) in Sagar Taluk ,Sorab Assembly Constituency (Reserved for CAT-IIA).
Bridge repair and maintenance work in Road from Gangappanahalli Cross (SH-85) to Gunjur (SH 35) at Ch 7.45 Km, Ch 7.80 Km and Ch 23.70 Km in Bangalore South Taluk
Construction of Bridge across shivaldappanahalla (U/s of Uyyamballi tank) near the land of Shankar of Uyyamballi village under the atchkat of 9th km of RBLC of ARP.
Construction of Bridge Cum Barrage near Lands of Udagatti and Talawar in Belawadi-Turamuri road of Bailhongal Constituency in Tq Bailhongal Dist Belagavi (SCP/2024-25) (SC Category)
Construction of Bridge at Halla at 7.35 Km of Haluvarthy to D.A.J. road join road via Gudalu Major District Road in Davanagere taluku. (Near Gudalu village Bridge Halla)
Construction of Bridge and Road Work from Taranagara SH-40 to Water Treatment Plant in Sandur Taluk, Ballari District, Under 4059-CMIDP Grant for the Year 2025-26.
Improvements to Road from Vijayapur Ukkali Dindawar sasanur Balaganur Mukhihal Nalatwad SH 177 km 15.00 to 15.40 and construction of Bridge at km 25.30 in Basavana Bagewadi Taluk
Construction of Bridge on Jamboti Rabakavi SH-54 Road at Km 36.10 in Belagavi Taluka Yamakanmardi Constituency for the Year 2025-26 under HoA 3054 SH-Bridge Maintenance
CONSTRUCTION OF BRIDGE ON PATTAN CROSS TO NARAYANAPUR DAM ROAD AT KM 131.0 IN HUNASAGI TALUK YADGIR DISTRICT. (UNDER 5054 SH BRIDGE IMPROVEMENTS FOR THE YEAR 2025-26)
Sub Estimate of Preparing DPR for the work Construction of Bridge cum barrage across baby tank waste weir halla between Aralakuppe Hagnahalli village in Pandavapura taluk Mandya District
Construction of CC Road from Yeshwanthanagar village to Rajapura Ch.0.00 to 1.00 km and Construction of Bridge (Narihalla) at CH. 0.20 Km in sandur taluk Ballari Dist
Construction of Bridge on Sindhnoor - Hemmadaga road (SH-30) at km 235.22 in Chennaman Kittur Taluka of Belagavi District UNDER HOA 5054 KRDCL FOR THE YEAR 2025-26
Re-Construction of Bridge (Bridge Cum Weir) and Protection works to Hubbanahalli tank waste weir halla damaged due to rain in Santhebachalli hobli KR Pete Taluk Mandya District
Construction of Bridge on Ekkumbi-Molakalmuru road SH-02 Km 196.60(near Nagarahunase) in Kudligi Taluk, Vijayanagara District.(HOA 5054 SH BRIDGE IMPROVEMENTS FOR THE YEAR 2024-25)
Supply, Installation, Commissioning and Civil works and Stamping of 6 nos of pit-less/semi-pit static rail weigh bridges and CAMC at NTPC Kudgi.
Annual Maintenance of Bridges for year 2025 - 26 in Channapatna Taluk for Statehghway Joining from Soluru to Sogala via Kudluru,Malurpatna,Sulleri at Chainage 66.30KM