Loading…
Loading…
2,699 results • Best match
Construction of Retaining Wall, RCC Drain, Road and superstructure of ROB (30 point 5 M span composite girder) and other misc civil works in connection with coal transportation system of Darlipali STPP of NTPC Limited in Sundergarh Dist in Odisha
Making of Earth Pit and fabrication installation of 02 nos. of Switch Board 415 Volts, 250 Amps, 03 pole for Power distribution work at siding-3, Iocp and newly installed transformer for instant shower system at ROB, LOCP, IB Valley Area.
Supply, Installation, testing and commissioning of Fully Automatic Sensor Based Fog-Mist Generating dust suppression system along complete CT road of total Length of 5.7 Km (from WB06 to Main dip chowk including road sale area and WB06 to ROB) includ
Construction of ROB at 294.039km (294/1-3) up line in lieu of LC No.119 at km 293.874 (293/35-37) up line in between Station Bhadrak and Baudapur on Howrah - Visakhapatnam main line in the District of Bhadrak
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Construction of Bypass on NH-59 from km 336.350 to 349.910 km (13.560 km) near Berhampur including four lane ROB in the state of Odisha on EPC Mode
Construction of Suakati Murder Chhak at Dandasenaposi village to KBM water fall from 0/00 Km. to 1/550 Km. with construction of bridge over Local Nallah at ch.0/330 km. under DMF in the District of Keonjhar.
Construction of road from Oriya UP School to Nua Sahi with Construction of bridge over Local Nallah on Oriya UP School to Nua Sahi road (Span 3 x 30.64 mtr., Well Foundation) under DMF in the District of Keonjhar.
Construction of Ostiaposi to Junga sahi from ch.0/00 km to 1/500 km. with construction of bridge over Local Nallah at ch.0/490 Km. and ch.1/150 Km. under DMF in the District of Keonjhar.
S/R to (a).Construction of Bridge over river Sukanai on Tribeniswar Mouda road (b). Construction of H.L. Bridge over river Birupa near Jasarajpur on Bheda to Anandabazar road in the District of Cuttack for the year 2021-22
Improvement to Latakhend Bichubahali Dangamara Road and Construction of Bridge over Khalkhali nallah at 1.60 km on Latakhend- Bichhubahali to Dangamara Road in the district of Bolangir under MMSY-Improvement to Existing RD Road for the year 2024-25
Package No.OR-17-652 (T07-Taldihi to Chilikadhara Via Ghasanatangar) and Package No.OR-17-LB-1-652 (Construction of Bridge over Khaupal Remal Nallah at 6.2km on Taladihi to Chilikidhara via Ghasanatangar) under PMGSY-III in the District of Keonjhar.
S/R to Construction of Bridge over river Gobari on Haribhaktapur Lalitgiri road (b). Const. of Bridge over Gobari on Nadiasahaspur to Podamarei Road (c). Bridge over river Gobari on Rahania to Champatipur road near Matiparilo (d). Bridge over river G
S/R to a.Construction of S.B. over Mendhakhai on N.H.5 (Govindpur) to Champapur via Anandabazar road b. Construction of Bridge over H.L. Canal at 1.500 Km. on Sanachancho Badachancho road in the District of Cuttack for the year 2021-22
Construction of Road RD Road to Mahulamunda from 0/000 Km. to 3/150 Km. with construction of bridge over local nallah at Ch.1.06 Km. of span 1 x 30.64 mtr. under DMF in the District of Keonjhar. (Open Foundation)
Construction of PMGSY Road (Irrigation Colony) to Chakradharpur road in the District of Angul under CMR and Construction of bridge over river Samakoi at ch.1.00 Km on PMGSY Road (Irrigation Colony) to Chakradharpur road in the District of Angul.
Construction of road from Sanasiadimal Panapasisahi Ramaqhat from 0/000 Km. to 3/000 Km. with construction of bridge over local nallah at Ch.2.75 Km. of span 1 x 30.04 mtr. under DMF in the District of Keonjhar. (Open Foundation)
Repairing and maintenance of mechanical structures of 08 nos of road weigh bridges (05nos Static Road and 03nos of In-Motion Road) of Hingula OCP on as and when required for a period of 365 day.
Special Repair of Bridges and Approaches to RD road to Tulasipur road such as Bridge Toe wall slop protection of embankment with Boulder pitching with 0/000 to 0/200 km for the year 2024-25
Conducting Survey,Geotechnical Investigations,preparation of GADs of bridges and submission of final reports,Development of Rail Infrastructure for proposed 2 Nos RLS 20 MTY,MCL modified route excavated de coaled Ananta Bharatpur OCP in Odisha
Construction of Haldipada NH-16 to West Bengal Border Road from 7/000 km to 13/000 km (including 3 nos of Bridges) in the District of Balasore under State Plan for the year 2025-26
Construction of HL bridges at CH 377/420 km CH 423/800km CH 433/750 km and CH 484/500 km in Malkangiri - Motu road on NH-326 in the state of Odisha on EPC mode
Construction of 5 HL Bridges at 379.000 km (Pangam),439.400 km (Potteru), 444.237km (Kongurukonda), 457.075 km(MV-90), 468.150 km (MV96), of NH326 at on Malkangiri-Motu road in the state of Odisha on EPC mode
Construction of 2 Nos bridges over Local Nallahs at 1/10 Km and 1/46 km on NH-326 to Bandhaguda via Dhaminiguda road in the district of Rayagada under BSY for the year 2023-24
Construction of guard wall from RD 1280m to RD 1360m and foot bridge at RD 1310m of Basantapur Minor of G.I.P. for the year 2022-23.
Construction of guard wall from RD 6545m to RD 6625m and foot bridge at RD 7355m of Bijaberni Distry. of G.I.P. for the year 2022-23.
Construction of H. L Bridge work under BSY
Consultant to provide key personnel to assist Departmental Authoritys Engineer for supervision of Construction of four lane ROB and its approaches in lieu of existing Level Crossing No.RV-71 at Km 435 on NH-217 (New NH-353) at Khariar in the Stat
Consultant to provide key personnel to assist Departmental Authoritys Engineer for supervision of Construction of four lane ROB and its approaches in lieu of existing Level Crossing No.RV-168 (presently RV-172) at Km 176 on NH-201 (New NH-26) at Ke
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
CANAL STRUCTURAL WORK
CONSTRUCTION OF H. L. BRIDGE OVER RIVER HANSUA AT 0.5KM ON KERADAGADA - CHANDANPUR - EKAMANIA ROAD IN THE DISTRICT OF KENDRAPADA
Touchless Sanitizer Dispenser (Q3), Alcohol Based Hand Rub/Hand Sanitizer (Q3)
Cleaning of drains all along C.T road and removal of sludge at all weigh bridges and drain out of surface water throughout the year with development works etc With mechanical and manual means at GOCP under Basundhara
Cleaning of drains all along C.T road and removal of sludge at all weigh bridges and drain out of surface water throughout the year with reparing of pot holes in CT road etc at GOCP under Basundhara
Construction of Road including two Nos. of Bridges at 0.25 Km and 1.10 Km from Majhapada to Jarkama Road in Majhapada G.P of Kuarmunda Block under DMF for the Year 2019-20 in the District of Sundargarh
Construction of Road Over Bridge with 1 x 60.0 m Camel Back Type Truss Girder + 1 x 24 m composite girder for Railway portion in lieu of LC CP-55, and proposed span of 8 x 25.04 m RCC girder on PPL Gate side and 7 x 25.04 m RCC girder on PPL Plant side for approach portion at Railway Km 491/17-19 between Paradeep and Paradeep Port End stations on the Cuttack-Paradeep line under Khurda Road Division.
construction of retaining wall
Construction of road from Turkipada to Badajumei from Ch 0/000 Km. to 4/000 Km. with construction of bridge over local nallah at Ch.3.15 Km. of span 1 x 19.36 mtr. under DMF in the District of Keonjhar.(Open Foundation)
Improvement of road from Nola to Baunru from Ch 0/000 Km. to 2/700 Km. with construction of bridge over local nallah at Ch.0.160 Km. of span 2 x 10.77 mtr. (Open Foundation) under DMF in the District of Keonjhar.
Construction of Tuntlei to Chuapani Sahi to Hatidandi Sahi from ch. 0/00 to 2/400 km. with construction of bridge over Local Nallah at ch.0/350 Km. and at ch.1/350 Km. under DMF in the District of Keonjhar.
AMC for day to day internal electrical Repairing/ Maintenance work of Project Office, Workshop, 33 KV substation, weigh bridges, site Office, Time Office, Canteen, Unit Store, all Official buildings etc (Surface lighting) of Ananta OCP for TWO year
ANNUAL MAINTENANCE OF NON RESIDENTIALBUILDINGS SUCH AS G.M OFFICE, DISPENSARY, PROJECT OFFICE, WEIGH BRIDGES, CHALLAN POINT, RECIEVE POINT, FIRST AID ROOM, NEW TIME OFFICE, CONTROL ROOM OF SUB STATION AND COAL SAMPLING ROOM, SITE OFFICE AND OTHER MIS
Construction of four lane ROB and its approaches in lieu of existing Level Crossing No. RV 71 at Km 435 on NH 217 (New NH 353) at Khariar including land acquisition under NH(O) in Annual Plan 2021 22 for the state of Odisha
Construction of proposed ROB in lieu of LC No 1T-60 01 KM 623/11/12 between Bargarh Road and Barpali Station in Jharsuguda-Titilagarh Section Shifting of 250mm 150mm dia Clear Water Rising main and100 mm dia C.I distribution main Barpali to Rampur
i) Construction of Road Over Bridge (1 x 19.08 m composite girder + 1 x 60.0 m Camel Back Type Truss Girder + 1 x 19.08 m composite girder) for Railway portion in lieu of LC No. 152, and proposed span of 11 x 25.04 m RCC girder on Gengutia side and 6 ... a Road Over Bridge consist ...
OR-14-57 (Construction of MRL03-Tharkaspur to Tileimal along with Construction of Bridge over Baghei Nallah at Ch. 1.100 Km on MRL03-Tharkaspur to Tileimal Road an Const. of Bridge over Local Nallah at Ch. 2.800 Km on MRL03-Tharkaspur to Tileimal
Installation of USS and DG near Sardega gate alongwith proving and fixing Isolation Transformers and laying of optical fibre cables with conduit in all weigh bridges and providing three phase dual power supply through UG CABLE AT GOCP,BA