Loading…
Loading…
632 results • Best match
Construction
Construction
Construction
Patch WBM, Carpeting, Grouting and side berm lowering etc. on 1.Tilthai RCC bridge to Madhya Deocherra road 2. Jalabassa Pekucherra road and 3. Jalabassa Market road.
Portion from other side of the RCC bridge over river Gomati at Sonamura to Belonia via Barpathari (L- 45.50 Km) / Balance work as per actual site condition.
Metalling,carpeting,seal coat etc.
Approach road
Patch WBM, Carpeting, Grouting, and side berm lowering etc.
Comprehensive Maintenance to IBB Road From ID-94 to ID- 97 under Kamalpur Border Fencing Sub-Division BFD-II in Tripura Sector during 2022-23, 2023-24 and 2024-25 SH Ordinary Repair, Flood Damage Repair, Special Repair and Bridge Repair SW Providing various services of manpower in Division and Sub-Division offices under Border Fencing Division-II, CPWD, Agartala.
CONSTRUCTION WORK
Patch soling, Patch metalling, Grouting, Re-carpeting etc (Gr-I)
Patch soling, Patch metalling, Grouting, Re-carpeting etc allied works. (Gr-II)
Construction of pedestal wall at Ch. 4.50 km for extension and erection of bailey bridges
Construction of toe wall, Earth filling, Brick soling etc. at Ch. 0.30 Km.
Construction of toe wall earth filling Brick soling at Ch 0.40 km
SH- Patch soling, Patch WBM, Patch carpeting, Premix seal coat etc. with other necessary works (portion from 0.00 km to 4.00 km)
S.H. Construction of Approach road, Earth filling, metalling, carpetting, block pitching and pucca drain, etc
Earth filling, Protection work, RCC drain, GSB, WBM II and III, PMC and seal coat
Maintenance
Construction
SH- Patch soling, Patch WBM, Patch carpeting, Premix seal coat etc with other necessary works.
Construction of approach road by earth filling and soling etc. complete.
Mtc. of Bailey Bridges on different roads by providing fitting fixing various spare parts as per requirement
Mtc. of Bailey Bridges on different roads by providing fitting fixing various spare parts as per requirement
Grouting, Patch Soling, Patch WBM-III, Carpeting, Seal coat, Painting of Bridges, Culverts and other allied works.
SH- Construction of WBM, Carpeting,seal coat on both side of the bridge approaches, in/c pucca drain and slab culvert (Span 1.00 M and Height 1.00 M).
Wood work, steel work and earthwork etc.
Maintenance of 02(two) Nos. different works under Teliamura R.D Block as per PWD SoR 2023 namely i)Mtc. of Flood Diversion Drain from PWD Road to Twikarma Cherra at Uttar Krishnapur GP,ii)Mtc. of approach road nearest to RCC foot bridge at Korbong
SH Grouting, Partial WBM, Carpeting, Recarpeting, Seal Coat etc.
Subgrade, Metaling, Carpetting, seal coat, protection work and others allied works etc during the year 2025-26.
SH patch Metalling grouting recarpetting and aliied works
Scarifying of existing bituminous surface,WBM,BPM,PMC,Seal coat etc.
Construction
SH Construction of RCC drain placing of PVC wire crates and allied works
Comprehensive Maintenance to IBB Road From ID-87 to 93 under AE-I, Dharmanagar Border Fencing Sub-Division-II, BFD-II in Tripura Sector during 2022-23,2023-24 and 2024-25. SH- Ordinary Repair, Flood Damage Repair, Special Repair and Bridge Repair. SW- Providing Various Services of man power in Division office and Sub-Division offices under Border Fencing Division-II, CPWD, Agartala Subwork/Packages: Providing Various Services of man power in Division office and Sub-Division offices under Border Fencing Divison-II CPWD, Agaratala
refer DNIT
Foundation and substructure, Construction of Superstructure, approach road, retaining wall etc.
SH- Supplying and fitting fixing of various missing and damaged parts and painting work etc.(2nd call)
SH-RCC work, plastering, painting, jungle cutting, bats filling etc.
Emergent Repair of approach of RCC Bridge located at Km 116.712 road embankment at Km 122.600 beside Khowai river for the road of Khowai to Teliamura (NH 208) in the state of Tripura in the FY 2022-23
Supplying and fitting fixing of various missing parts, replacement of various damaged parts and painting work etc.
CONSTRUCTION WORK
SH- Supplying and fitting fixing of various missing parts, replacement of various damaged parts and painting work etc.
Dismantling work, Superstructure, Substructure etc.
SH Patch WBM-III Grouting Carpeting with sand seal coat and other allied works
metalling, grouting, carpeting, sand seal coat etc.
Flat brick soling, wing wall CD Block pitching earth filling etc.
Construction of RCC Bridge over River Gomati at Ch 49.800 Km and over River Muhuri at Ch 93.775 Km including Approach road to the bridge on Agartala to Sabroom road section of NH-08 (old NH-44) in the state of Tripura on EPC basis
S.H- Construction of approach road upto soling stage in/c Retaining Wall etc.