Loading…
Loading…
839 live346 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
839 results • Best match
SC services during OnM stage of 2LPS of Karauli Dholpur section of NH 23, and 2LPS of Uncha Nagla Khanuan Roopvas Dholpur section of NH-123 in the on EPC mode. (Total Length 175.908 km.)
Construction of balance and left out work of The River Crest at Village Kalyanpur of Rudrapur District of Uttarakhand State pertains to M/s Supertech Limited on EPC Basis
CONSTRUCTION OF KUGGING TINALI ROAD FROM KM 0.00 TO KM 36.96 NET LENGTH 36.96 KMS GREENFIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER 1448 BCC 761 BRTF IN AOR OF PROJECT BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE
EOI invited for association as JV Partner from Exp. Agencies for Construction of Additional Major Bridge and its approaches across river Teesta at Sevoke... in District of Darjeeling, West Bengal On Engineering,Procurement, Construction (EPC) Mode
Construction of Additional Major Bridge and its approaches across river Teesta (at Sevoke) starting around km 591.310 of NH-10 (Old NH-31) in the District of Darjeeling West Bengal on EPC Mode under NH(O)
Development of 4/6 Lane Green Field Bypass for Etmadpur and Tundla Town on Section of Agra Etawah NH 19 from design Km. 0.000 to Km. 16.200 in the State of Uttar Pradesh on EPC Mode.
Construction of 4 L of Ujjain Jhalawar Sec of NH 552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli Kadiya (PKG 1) in the State of Madhya Pradesh on EPC Mode under NH(O).
Consultancy Services for Authoritys Engineer for Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC Mode
Construction of Perimeter Roads on Both sides of Emergency Landing Facilities (ELF) including ATC Plinth (50m x 50m) on Chilakaluripeta Nellore Section of NH16 from Km. 1210.000 to Km. 1214.600 in Andhra Pradesh on EPC Mode
Construction of Phulbari Instream Storage Structure across River Sapei near village Phulbari in Bargaon block of Sundargarh district in state of Odisha on EPC Turn key basis including power connectivity system and operation and maintenance
E-24 (26-27) Supply Installation Testing Validiation Commission of Anaesthesia equipment on Turn key
DSITC Of IP-based AI-enabled CCTV Surveillance System (200 Cameras) on Turn Key Basis
Construction of 4-Lane Flyover along with Approaches and Service Roads at Simrahi Bazar from Design Ch. 170.210 Km to Ch. 172.250 Km on NH27 (Total Length 2.04 Km.) in the State of Bihar on EPC Mode.
Strengthening of pavement including improvement of road safety Costruction of Retaining wall Breast Wall and Thrie beams crash barriers etc in km 156507 to 208705 on NH 05 in the state of Himachal Pradesh on EPC Mode
Balance work of Six laning of Kagal Satara section of NH 48 (old NH 4) Package I from km 592.500 to km 658.000 in the State of Maharashtra to be executed on EPC mode under Bharatmala Pariyojana
"Development of Maintenance Facilities for Amrit Bharat Trains at Coaching Depot/Bilaspur including Construction of Heavy Repair Bay and Service-cum-store Building for Amrit / Vande Bharat Train Maintenance at Bilaspur in Engineering, Procurement, ... ( EPC ) ... (EPC) mode ".
RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
Request for Qualification cum Request for Proposal for Design and Construction of Common Effluent Treatment Plant (CETP) of 20 MLD Capacity on EPC Basis in Dholera Special Investment Region, Dholera
AE services for Development of Access Controlled Highway of 4 lane from Kadur (Km 256.160) to Hasnapur/Potulamadugu (Km 267.360) (Mahabubnagar Bypass) of Hyderabad Panaji section of NH167 (length 11.200km) under NH(O) in Telangana on EPC mode.
Permanent restoration of NH144A, section from existing chainage Km 30.053 to Km 229.730 (Design chainage Km 30.000 to Km 198.180, length- 168.180 Kms), (Akhnoor Poonch Road) under Project Sampark, BRO in the UT of JK on EPC mode
Rectification of 25 no of Accident Spots Blackspots in Karur Dindigul Madurai Kayathar sec of NH44 Chettikulam Natham sec of NH785 and Const of Combined Office Building for RO n PIU Madurai in Tamil Nadu on EPC mode
Construction of 4L of Ujjain Jhalawar Sec of NH 552G from Ch.86.500 Aakli Kadiya to Ch.159.263 Jhalawar (Jn with NH52) PKG 2 in the State of Madhya Pradesh and Rajasthan on EPC Mode under NH(O)
CS for Supervision Consultant during OnM of 8L AC GF DVE NH148N starting at Sohna Gurugram Road NH248A near Alipur vill to Haryana Rajasthan Border Ch.0.000 to Ch.78.800 in Haryana on EPC mode under Bharatmala Pariyojana
Rehabilitation and Upgradation of exist 2L to 4L of NH146 from Km 0.000 Km 158.600 near Berkheri vill to Km 23.423 Km 181.800 near Lehdara vill in the State of Madhya Pradesh on EPC Mode TL 23.423 km
Widening and Strengthening of Existing 2 Lane to 2 Lane with Paved Shoulder from Km. 68.600 to Km. 162.700 and Km. 178.400 to Km. 183.732 of NH-326 in the State of Odisha under EPC Mode (Package-1)
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 78.38km on EPC mode
Turn Key project of Oxidation and Tin Plating Plant including effluent water treatment plant and acc
Supply, Laying, Erection, Testing and Commissioning of 66kV 1CX630 sqmm XLPE Cable with Poly AL-Poly / Aluminum Corrugated construction on EPC basis for various lines in Anjar circle in Rajkot Zone.
Construction of GPRA at Amaravati, the New Capital city of Andhra Pradesh. SH: Planning, Designing and construction of 1504 residential quarters comprising 600 Type-II quarters in 3 towers ( G Plus 24 each), 600 Type-III quarters in 3 towers ( G Plus ... on Engineering , ... Engineering, Procurement and Construction (EPC) ... ( EPC ) ... (EPC) Mode -I. ...
Construction of 4 Lane Access Controlled Bypass to Tiruvannamalai Town starting from Design km 75.150 of new NH38 and ending at Design km 88.030 of new NH38 (Design Length 22.710km) in the state of Tamil Nadu on EPC Mode
Overlay at various stretches of 6-lane access-controlled Greenfield Highway from km 67.000 to km 99.000 of Rajasthan Gujarat Border to Santalpur section of NH-754A in Gujarat on EPC mode at Risk and Cost of existing Contractor
up gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra
Rectification of Black Spot locations of Chutupallu Ghati from Ch. 92.885 to Ch.97.920 and Charahi Ghati Section from Ch. 51.540 to Ch. 52.500 on NH33 (New NH20) under NH(O) on EPC mode in the State of Jharkhand
Engineering Procurement and Construction (EPC) for "Construction of doubling work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, track works, platform work, station building, FOBs, other buildings, associated S&T and Electrical Utility Shifting works and associated miscellaneous works for 25T Indian Railway Standard Loading from KARNAUTI station(including-Ch. 2.844 KM) to BIHAR SHARIF station(excluding-Ch 29.350 KM), from Ch. 1.900 KM to 28.192 KM (Total- 26.292 km) in connection with the Doubling of the Bakhtiyarpur-Rajgir - Tilaiya section"
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
SC for OnM of 6L Access Controlled Greenfield Highway of Sangariya (Near Chautala) to Rasisar (near Bikaner) Section of NH 754A as part of Amritsar Jamnagar Economic Corridor in the state of Rajasthan on EPC mode under Bharatmala Pariyojna(CSP 2)
SC for OnM of 6L Access Controlled Greenfield Highway of Sangariya (Near Chautala) to Rasisar (near Bikaner) Section of NH 754A as part of Amritsar Jamnagar Economic Corridor in the state of Haryana and Rajasthan on EPC mode under Bharatmala Pariyojn
SC for OnM of 6L Access Controlled Greenfield Highway of Sangariya (Near Chautala) to Rasisar (near Bikaner) Section of NH 754A as part of Amritsar Jamnagar Economic Corridor in the state of Rajasthan on EPC mode under Bharatmala Pariyojna(CSP 3)
Construction of General Pool Residential Complex at Village Bahapur, New Delhi Construction of 80 nos. Type V and 80 nos. Type VI residential units including basement, G to 20 floors, including all development works and services on EPC Mode I basis
Improvement of existing bypassed section of NH 731A from km 52.200 to 54.370,57.314 to 57.746, 60.670 to 61.460,65.06 to 68.58, 83.530 to 87.110 and 89.130 to 92.140 (Kaushambi to Chitrakoot Section) in total 13.502 km length under OTI on EPC mode
Deep Drilling, Development and Stabilization of 250 mm dia Tube well upto 300 meters Below Ground Level by Direct Rotary/Reverse Rotary/Dual Rotary Method on EPC Mode at WSS Lok Bhawan Jammu (Phase II) in District Jammu under UT Capex.
Construction of 1 Flyover at Palbani,1 PUP at Kuchai,1 PUP at Samsanghat on Jharpokharia Balasore section of NH 18 and 1 VUP at Manda on Baharagora Singhara of NH 49 in the state of Odisha on EPC Mode
Balance Works of Construction of Flyovers at Morampudi Jn, BS ID-AP-03-295, Jonnada Jn, BS ID-AP-02-134 and Undrajavaram Jn, BS ID-AP-02-078 on NH-216A, in the State of Andhra Pradesh on EPC Mode
Rectification work on 8L access controlled expressway section of Delhi- Vadodara Green Field Alignment (NH 148N)on EPC Mode under Bharatmala Pariyojana in Rajasthan in the state of Rajasthan on Risk and Cost of Contractor on Item Rate basis (Pkg 13)
Rectification work on 8L access controlled expressway section of Delhi- Vadodara Green Field Alignment (NH 148N)on EPC Mode under Bharatmala Pariyojana in Rajasthan in the state of Rajasthan on Risk and Cost of Contractor on Item Rate basis (Pkg 14)
Engagement of user fee agency through e-quotation for Dularpur Fee Plaza for two lane with paved shoulder road under EPC mode on Bahraich-Shrawasti Section (km 248.400 to km 310.000) on NH-730 in the state of Uttar Pradesh
Widening of Service Road from Km. 265.500 to Km. 279.750 on Four lane Raipur-Aurang section from Km.239.000 to Km. 282.000 of NH-6 (New NH-53) as BOT (Toll) on DBFOT pattern under NHDP IV on EPC mode
Consultancy Services for AE for Supervision of Construction of 4-Lanning of Ujjain-Jhalawar Section of NH-552G from Ch.0.000 Village Khilchipura to Ch.86.500 Village Aakli-Kadiya (Package-1) in Madhya Pradesh on EPC Mode under NH(O)