Loading…
Loading…
839 live346 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
839 results • Best match
Upgradation to 2 Lane with Paved Shoulders of Naliya Narayan Sarovar section from design km 220.773 to km 288.987 of NH 41 in the state of Gujarat on EPC mode.
Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode
Development of 80MW 320 MWh Battery Energy Storage System (BESS) system through complete EPC mode at four designated locations in Odisha along with 15 years of Comprehensive Operation and Maintenance
Authority Engineer for supervision of Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH 913 Dishum Sachung Lada 70.00 to 167.75 97.75km on EPC mode
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
Construction of Service Road along with 02 flyovers-underpasses at Ch. 85.750 to 97.250 on Guna Bypass Section of NH-46 in the State of Madhya Pradesh on EPC Mode
Request for Proposal (RFP) for Selection of Agency for Installation of De-Sliming System at HUS (MK Unit) on Engineering Procurement Construction (EPC) Basis
Construction of State Guest House Delhi Sadan at Plot No 5 Sector 19 Dwarka New Delhi including all services on EPC basis Mode I
Supply, Laying, Erection, Testing and Commissioning of 66kV,1CX630 sqmm XLPE Cable with Poly.Al. /Aluminum construction on EPC basis Various lines under Bharuch Circle.
Supply, Laying, Erection, Testing and Commissioning of 66kV,1CX630 sqmm XLPE Cable with Poly.Al./Aluminum construction on EPC basis Various lines under Navsari Circle.
Design, Supply, Installation, Testing and Commissioning of 3 X 40 TR REVERSIBLE AIR-TO-WATER COOLED HEAT PUMP HVAC System along with Low Side Works on EPC Mode at Egret Hostel of IIT Jammu
Construction of Road Over Bridge ROB with approaches in lieu of railway crossing no. LC T24 at Km. 1.160 at Parali on NH361H in the state of Maharashtra on EPC Mode.
Construction of flyover for Long-Term Rectification of MoRTH Notified Accident Blackspot at Palasi Zero Mile More, NH-27 Km 212.000/NH-527 Km 0.000, Araria District, Bihar on EPC Mode
Construction of 2 Lane Service Road of STRR (West side) NH948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km 144.170 to km 179.936 in Tamil Nadu on EPC Mode.
Construction of 2 Lane ROB in Lieu of LC-09 at IR Km 340/9-341/0 Ratangarh-Degana Section on Ratangarh- Chhapar Road (SH-07C) in District Churu EPC Mode
"Execution of Third Line BG track between Ranaghat Jn. (Excl.) and Krishnanagar Jn. (Excl.) from Km 75.210 (from Sealdah) to Km 97.585 (from Sealdah) including Electrification & Signalling works" on EPC mode.
Renovation, Modernization and Upgradation of Kulhal Hydroelectric Project on turn key basis
Construction of Vehicular Underpass VUP at Km 38 280 Kolegaon Pati on Ghogargaon to Ahmednagar Solapur District Border Pkg II Section of NH 561A in the state of Maharashtra on EPC Mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
EXECUTION OF BALLAST LESS TRACK WORKS FROM SHIVALINGAPURAM STATION KM. 45.483 TO BORRAGUHALU STATION KM. 72.550 IN CONNECTION WITH KOTTAVALASA KORAPUT DOUBLING PROJECT OF RAYAGADA DIVISION, EAST COAST RAILWAY ON EPC MODE
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
Construction of Fly Over Bridge in Rewa City From College Chouraha (Infront of Commissioner Banglow) to Dhekha Tiraha (Infront of Hotel Vishnu Empire) on Varanasi-Nagpur Road Distt. Rewa in EPC Mode
Request for Proposal for Engineering, Procurement & Construction (EPC) Mode for Construction Of Major Bridges (34 Nos) between Hosapete (Excl.) And Ballari (Excl.) Stations, as part of Ballari- Hosapete 3rd & 4th line project.
Widening and Strengthening Of Existing 2 Lane to 2 lane with Paved Shoulder from Km. 205.373 to Km. 311.700 of NH-326 in the State of Odisha under EPC mode (Package-2)
Widening of existing 2 lane to 4 lane with paved shoulder from Km 32.950 to Km 55.400 (Thavar to Zerda section of NH-168A in the State of Gujarat on EPC mode.
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in Uttar Pradesh.
Engineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail line including earth work, blanketing, minor bridges, major bridges, Track works, Station building, buildings and other miscellaneous works for 25T Indian Railway Standard Loading from Sitamarhi (excluding) to Rewasi (including) (i.e.Ch. 0.700 to 12.400) (Total length = 11.70km) in connection with Sitamarhi-Sheohar New BG Rail line project in East Central Railway in the state of Bihar
Engineering, Procurement and Construction (EPC) Tender for"Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 227.200) (total- 37.80 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway"
Consultancy Services for Supervision Consultant during Operation and Maintenance of Gorakhpur Bypass constructed through EPC contract under NHDP IV in the State of Uttar Pradesh
Balance work for Construction of 8-lane access-controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section) in Gujarat on EPC mode (Pkg-VIII)-02nd Call
Design, Build, construct, install, and commissioning of Waste to Compost Plant (W2C) Plant of 10 TPD for fresh waste along with operation and maintenance of the plant for 5 years on EPC Mode.
Construction of H. L. Bridge across Brahmani river on Manjuripada Hatibari road (from km 4.290 to 7.030) connecting to Sukinda Block in the District of Jajpur for the year 2026-27 (EPC Mode)
Consultancy Services for Authoritys Engineer for Upgradation to 2 -Lane with paved shoulders from Km. 220.773 to 288.987 (Naliya-Narayan Sarovar stretch) of NH-41 in the State of Gujarat on EPC Mode
Construction of Four-Lane access control Arwal Bypass from km 54.200 To Km 66.500 (Design ch. 67.680) of existing NH-139 on Naubatpur- Hariharganj Road in the State of Bihar under EPC Mode.
Const. of 4L from Kadur Km 256.530 to Hasnapur Potulamadugu Km 267.360 Mahabubnagar Bypass of Hyderabad Panaji sec of NH167 L 10.830km under NH O in the state of Telangana on EPC Mode.
Supervision by Authority Engineer for Design Engineering Procurement for Construction of Non residential buildings for the establishment of 6th Battalion of SSF PAC and Other Institutions at district Ayodhya Uttar Pradesh on EPC mode
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode
Development or construction of entry exit arrangement AT 4 Lane Greenfield Expressway SPUR from Delhi Vadodara Greenfield Expressway near Bandikui to Jaipur section of NE 4C in the state of Rajasthan on EPC Mode.
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
Widening and strengthening of stretch from Hansdiha (Design Ch 92.380 km) to Chopa More (Design km 129.370) of NH-133 to 4 lane with paved shoulder in the State of Jharkhand under EPC mode
Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on NH-09 (Old NH-125) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2026-27
Construction of balance and left out work of The River Crest at Village Kalyanpur of Rudrapur District of Uttarakhand State pertains to M/s Supertech on EPC Basis.
Maintenance work of Jabalpur - Hiran River section of NH-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the State of Madhya Pradesh to four lanes with paved shoulders under NHDP-III on EPC mode on the risk and cost of the EPC
Construction of 2256 Science Laboratories (Physics, Chemistry and Biology) in 922 Government Schools of Rajasthan at different locations on EPC Basis for Rajasthan Council of School Education, Jaipur
Improvement of existing bypassed section of NH 731A from Km. 35.110 to Km. 43.830 (Lal Gopalganj) in total 8.72 Km. length under One Time Improvement policy under EPC mode in the state of Uttar Pradesh.
Consultancy Services for Authority Engineer for supervision of Widening to 2L PS from Km. 0.00 to 37.850 except 24.45 To 27.20 of NH 766C Byndoor Ranebennur Section in the State of Karnataka on EPC mode
Construction of 4 lane Bypass Road to the existing NH 31 and NH 922 through Bairiya Ara section from Km. 0.000 to Km. 27.062 in the State of Uttar Pradesh and Bihar on EPC Mode
Construction of Bypass to the Holenarasipura Town from Km 87.280 near Chikknahalli to Km 97.580 Near Hullahalli on NH 373 in the State of Karnataka on EPC mode under NH O Annual Plan 2023 24