Loading…
Loading…
851 live345 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
851 results • Best match
BW for Cons.of 4lane Greenfield DAKE from Jun. with Jalandhar Kapurthala road (NH703A) near Khojewal village to Junction with Amritsar Mehta Sri Hargobindpur Tanda road (NH503A) (Km 319.400 to 362.420) on EPC mode under NH(O) in Punjab (PKG-11)
Construction of a new 2LPS ROB alongside the existing 2 lane ROB at km 128.400 including construction of a Vehicular Underpass at km 129/200 and flyover at km 130.220 on NH61 in the State of Maharashtra on EPC mode
Construction of Bypasses at Sheikhpura and Khaira along with 1 no. of realignment at Sikandra to two lane with paved shoulders standard on N.H. 333A under EPC mode in State of Bihar (Job No. NH-333A-2022-23-BR-58).
One time Improvement of existing left over (Bypassed) Road stretches from Km 354.531 to Km 358.842 of Kurnool - Chittoor - Ranipeta Road of NH-40 (Chittoor Town limits) in State of Andhra Pradesh on EPC mode under Annual Plan 2026-27
Construction of 6 lane Vehicular underpasses at Km 306.930 (Tilhar bypass) and Km 347.595 (Ucholiya) for permanent rectification of MoRTH identified Blackspot on Bareilly-Sitapur section of NH-30 (old NH-24 in the state of Uttar Pradesh on EPC mode.
Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode
Improvement of MoRTH Identified Blackspots through construction of Grade Separators at Selected locations along NH 75 Corridor BW Km.216.91 to Km.302.42 with an effective improvement Length 25.6 Km under NH(O) on EPC mode in the State of Karnataka
HT Line Shifting Work Under Risk And Cost For Rehabilitation and Upgradation of Pal Phata Phulambri Khultabad Section of 752H from km.137.758 to km.105.700 Design ch. Km. 46.440 To 78.358 in the state of Maharashtra on EPC Mode.
CONSTRUCTION OF EWS-I RESIDENTIAL FLATS INCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREA DEVELOPMENT WORK AT T.P. SCHEME NO. 37 (VARIYAV), F.P.NO.111 UNDER “PRADHAN MANTRI AWAS YOJNA 2.0-AHP” ON ENGINEERING-DESIGNING, PROCUREMENT AND ... ( EPC MODE ).
CONSTRUCTION OF EWS-I RESIDENTIAL FLATS INCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREA DEVELOPMENT WORK AT T.P. SCHEME NO. 08 (PALANPORE), F.P.NO. 132 UNDER “PRADHAN MANTRI AWAS YOJNA 2.0-AHP” ON ENGINEERING-DESIGNING, PROCUREMENT AND ... ( EPC MODE ).
Consultancy Services for Authoritys Engineer for Supervision of Widening of Existing 2 Lane to 4 Lane with Paved Shoulder from Km. 32.950 to Km. 55.400 (Thavar to Jherda Section) of NH 168A in the State of Gujarat on EPC Mode
Strengthening of Agartala Government Medical College (AGMC) and Govind Ballabh Pant Hospital (GBP), Tripura for Enhancement of 100 Undergraduate (MBBS) Seats and 83 Postgraduate (MD/MS) Seats through Infrastructure Development on EPC Basis
Design and Execution of Three Skybridge Lifts and Water Transfer System from TD 2 Drain to Water Bodies, including Allied Works, at Bharat Vandana Park, Sector 20, Dwarka, New Delhi, on EPC Basis
Supply & Inst. of 11/0.433 KV Substation for providing Power Supply to 1000T press on turn key basis
Development of Satellite Township Phase-l, Package 6 (Studio Apartment and 1BHK) including allied works at Rakh Gund Aksha, Bemina, Srinagar (J and K) on EPC basis with O and M of 2 years
Rehabilitation and Upgradation of Nehru Nagar to Kothagudem Section to Two Lane Four Lane with Paved Shoulders from Km 178.500 to Km 230.580 of NH 930P in the State of Telangana on EPC Basis
Development of Satellite Township Phase-l, Package 6 (Studio Apartment and 1BHK) including allied works at Rakh Gund Aksha, Bemina, Srinagar (J and K) on EPC basis with O and M of 2 years
Construction of 100 Bedded ESIC Hospital Building i/c 32 nos staff Quarters at Marschal Pitch Kanker Khera Meerut UP in EPC Mode-I SH: Hiring of inspection vehicle for the use of Executive Engineer, Meerut Division, CPWD Meerut UP. Subwork/Packages: Inspection of Vehicle
Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode
Construction of 4lane GF Amritsar-Katra connectivity of Amritsar with DAK Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction NH3 and Taran Taran Bypass near Mannawalla village ch.70.950 (Km 40.900-Km 70.950 Pkg-2) on EPC Mode in Punjab
Consultancy Services for AE for supervision of Rehabilitation and Upgradation from Km. 0.000 to Km. 51.600 of NH321G (Agra (Junction on NH509 at Tedhi Baghia) to Nuhkhas) to 2 lane with PS configuration in the state of Uttar Pradesh on EPC mode.
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
Consultancy Services for Authority Engineer for supervision of Widening to Two Lane Paved Shoulders from Km 0.000 Mudigere to Km 26.326 Mugutihalli of NH 173 Mudigere Kadur Section in the State of Karnataka on EPC Mode in NH O Annual Plan 2023 24
PROJECT MANAGEMENT CONSULTANCY SERVICES (AS AUTHORITY ENGINEER) FOR CONSTRUCTION OF 4 LANE ELEVATED CORRIDOR ON BELLARY ROAD FROM UAS STAFF QUARTERS TO MEHKRI CIRCLE ALONG WITH UP AND DOWN RAMP IN EAST WEST ELEVATED CORRIDOR, BANGALORE THROUGH ... ( EPC ) ... (EPC) MODE
Construction of Viaducts at 12 locations Cut and cover Tunnel at 02 locations and Pedestrian Underpass (PUP) at 01 location from Km 517.250 to Km 547.080 section of New NH-66 (Old NH-47) in the state of Kerala on EPC mode
CONSTRUCTION OF EWS-I RESIDENTIAL FLATS & SHOPS INCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREA DEVELOPMENT WORK AT T.P. SCHEME NO. 09 (PALANPORE-BHESAN), F.P.153 UNDER “PRADHAN MANTRI AWAS YOJNA 2.0-AHP” ON ENGINEERING-DESIGNING,PROCUREMENT ... ( EPC MODE ).(WORK
Planning, Designing and Construction of South Zone Regional Training Centre (SZRTC) (Civil, E&M) and all other works) consisting of Non-Residential buildings(Training-cum-Administrative Block, Hostel cum Guest House Block, Amenity Centre Building, ... on Engineering , ... Engineering, Procurement and Construction (EPC ... ( EPC Mode -I) ...
Construction and Beautification of 3 nos. Delhi Entry Points at 1 Noida 2 Dilshad Garden 3 Loni in Delhi on EPC basis Mode I adn comprehensive maintenance of Electrical and Horticulture work for three years
Supply and installation of LT ABC (Dyuthi Special ) on turn key basis at different locations under Electrical Division, Nilambur.
Construction of BPHU at Kamarkuchi BPHC in Nalbari District for FY 2025 26 under PMABHIM on Turn Key Basis
Under Ground Pipe Line Irrigation Gravity Flow with Micro Irrigation System in the Command Area of JLMC and its System From RD 45.630KM to RD 82.64KM of SIP, Laxmiposi, Mayurbhanj, Odisha. on EPC Turn Key basis including O and M for 5 years
Work Descriptions: Remaining work of Rejuvenation of Bhairva Talab in Bhagalpur, Bihar including 5 years of Defect Liability period and Operation & Maintenance under Bhagalpur Smart City Limited, on Engineering, Procurement & Construction (EPC) ... (EPC) contract basis.
General Karzok under Project Himank in Ladakh UT on EPC Mode
Consultancy services for supervision consultant for Operation and Maintenance of Four laning of Nerchowk Pandoh including Sundernagar bypass section on NH 190 000 to 211 370 and NH 154 from km 0000 to 6 680 existing km 173900 to km 179600 HP EPC Mode
Consultancy Services for Authority Engineer for supervision of i Widening to 4L PS of NH 548B from Km. 80.000 Near Murgundi to Km. 140.200 Near Chikkodi excluding length from Km. 118.450 To Km. 128.450 in the State of Karnataka on EPC mode and ii Con
Balance works for Cons. of 4-lane Greenfield Delhi Amritsar Katra Exp. from Jun. with Ludhiana Malerkotla Road (SH11) near Bhogiwal village to Junction with Ludhiana Moga Road (NH5) (Km 225.770 to km 260.860)on EPC mode under NH(O) in Punjab (PKG-08)
Construction of EWS-I Residential Flats & Shops Including All Internal Infrastructure Services & Area Development Work At T.P. SCHEME NO.46 (Jahangirpura), F.P.NO.96 In Surat City, Under “Pradhan Mantri Awas Yojana 2.0-AHP” On Engineering-Designing, ... ( EPC Mode )
Construction of EWS-I Residential Flats & Shops Including All Internal Infrastructure Services & Area Development Work At T.P. SCHEME NO.51 (Dabholi), F.P.NO.206 In Surat City, Under “Pradhan Mantri Awas Yojana 2.0-AHP” On Engineering-Designing, ... ( EPC Mode )
CONSTRUCTION OF EWS-I RESIDENTIAL FLATS & SHOPS INCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREA DEVELOPMENT WORK AT T.P. SCHEME NO. 55(BHESTAN), F.P. NO. 43 (PACKAGE-01) UNDER “PRADHAN MANTRI AWAS YOJNA 2.0-AHP” ON ... ( EPC MODE ).
CONSTRUCTION OF EWS-I RESIDENTIAL FLATS & SHOPS INCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREA DEVELOPMENT WORK AT T.P. SCHEME NO. 55(BHESTAN), F.P. NO. 43(PACKAGE-02) UNDER “PRADHAN MANTRI AWAS YOJNA 2.0-AHP” ON ENGINEERING - DESIGNING, ... ( EPC MODE )
Notice Inviting EOI for Selection of Consortium Partner as a System Integrator (SI) for proposal on Design, Supply, Installation, Testing, Commissioning and Operation and Maintenance of Advanced Traffic Management System ATMS projects in Economic ... on EPC mode for ...
Construction and Beautification of 4 Nos Delhi Entry Points at 1 Kapashera 2 Arjangarh 3 Auchandi Kharkhoda 4 Dhansa in Delhi on EPC basis Mode I and comprehensive maintenance of Electrical and Horticulture work for three years
Third Party Inspection And Project Management Consultancy for EPC contract for connecting remaining ponds from Deodar-Lakhani pipeline project, Tharad-Dhanera Pipeline Project and remaining ponds of Tharad Taluka from Tharad-Sipu Pipeline. Dist. Vav-Tharad.
Design, manufacture, supply, erection, testing, commissioning of LED based Solar High Mast including Guarantee/ Warranty, Annual Maintenance Contract and insurance coverage for 5 (five) years on turn-key basis throughout the State of Tripura
Construction of EWS-II Residential Flats & Shops Including All Internal Infrastructure Services & Area Development Work At T.P. SCHEME NO. 50 (Ved-Katargam), F.P.NO. 96 In Surat City, Under “Pradhan Mantri Awas Yojana 2.0-AHP” On ... ( EPC Mode )
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode
CONSTRUCTION OF FOUR LANE RAILWAY OVER BRIDGE CUM ELEVATED CORRIDOR IN LIEU OF LC NO.28 ON AHMEDABAD- BOTAD RAILWAY LINE ON 60.0 M WIDE TP ROAD CONNECTING SARKHEJ CIRCLE TO SANAND – SARKHEJ ROAD CROSSING OVER L. J CIRCLE AND SANAND JUNCTION AT S.G. ... ON EPC MODE .
Planning, Design and Construction of Combined Building for Admin Block, Quarter Guard, Quarter Master Store, Training Store, MT Complex, Tradesmen Shop (G plus 6 with Basement) at 22nd Bn, ITBP Tigri Campus, New Delhi including all Civil and MEP ... on EPC Mode -I
TENDER FOR CONSTR IMPVT OF EXISTING RD SKTT CL 9 TO NHDL SPECN FM EXTNG KM 40 TO 70 DESIGN CHAINAGE KM 40 TO KM 68 PT 400 NET LENGTH 28 PT 400 KM ON EPC MODE UNDER PROJECT DPK IN LAHAUL SPITI DISTT IN THE STATE OF HP
ENGAGING TECHNICAL CONSULT FOR PREP OF FS AND DPR ON EPC MODE FOR CONST OF RD HURI-TAKSING (NEW ALIGNMENT) FROM KM 0.00 TO 95.348 GREEN FIELD ALIGNMENT TO NHDL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 TF (P) ANK IN THE STATE OF A. P